Loading...
SS9901-CS040830 (2) 9?2 ?35 3002 AOG 50 2004 12:18 FR TURNER COLLIE& BRADENg?2 ?55 5002 TO 997D~045570 P.01/01 Turner Collie O'Braden Inc. Engineers - Planners · Project Managers 17300 Dalla~ Parkway Suite 1010 Dallas, Texas 75248 972-735-3000 Fax: (972) 735-3001 REMARKS: Rick, This fax is regarding the Parshall flume and manhole shown on Sheet DC-7 of the DeForest Lift Station plans. I understand from Greg Hooten that you had a question as to why the manhole was specified to be filled with concrete or sand covered with concrete to the top of the flume. This is recommended by the flume and manhole manufacturer. If the void spaces on either side of the flume are not filled, water can accumulate and become stagnant, which creates odors. Mosquitoes can also become a problem, resulting in a health issue_ If you have any additional questions or concerns, feel free to call me. Thanks, Erika Cooper An AECOM Company TOTAL PAGE.C1 ~