Ballet TX-LR050726SAM ENGINEERING & TESTING, L.P.
tServing The Goo-Industry Since 1974 .~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
Head Construction, Inc.
3030 LB J, Suite 700
Dallas, TX 75234
PROJECT: Proposed Ballet Academy of Texas
145 Fitness Court
Coppell, TX
Ken Head
SE&T TECHNICIAN: Dominic Gonzales
LOCATION OF PLACEMENT: Piers # 10,11,12 & 13
STANDARD 6" X 12"
AREA 28.27 SQ. IN.
REPORT DATE: 7/26/05
SAMPLE DATE: 6/28105
PROJECT NO.: 286TXIK5
18
PAGE 2 OF 3
8:00 AM .. ConcreteSuppliec - Southern Star
Time Left: 3:45 PM 330402
5 Truck #: 1054
91 Time Batched: 11:55 AM
% Air Content: N/A Time Sampled: 12:40 PM
Total No. of Test C~inders Made: 4 Product Code: 9329
Total Cubic Yards Placed: 30 Cement: N/A
N/A N/A
Added Watec.
Weather Conditions:
Air Temperature (F):
Cloud)' & Warm
94
Fly Ash:
Coarse A~lregate: N/A
Water: NIA
Unit Wei! ht of Fresh Concrete: N/A
Air Content: N/A
lA 7 7/5/05 147 78,000 2758
1 B 14 7112/05 147 77,000 2723
1C 28 7/26/05 147 95,000 3359
1 D 28 7/26/05 148 97,000 3430
Curing ASTM C-31 Test Method
~ ASTM C-143 ASTM C-39 & 231
Remarks: Tested concrete mesta/exceeds required strength.
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
le Shear 3000/28
le Shear 3000~28
3000/28
3000/28
Cylinders Tested By:
SE&T
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only/applies to the samples tested and does not necessaril)' represent identical or similar samples.
G:/2005/286txik5/Cpist rlCpistrl 8SF