Loading...
Ballet TX-LR050726SAM ENGINEERING & TESTING, L.P. tServing The Goo-Industry Since 1974 .~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT CLIENT: Head Construction, Inc. 3030 LB J, Suite 700 Dallas, TX 75234 PROJECT: Proposed Ballet Academy of Texas 145 Fitness Court Coppell, TX Ken Head SE&T TECHNICIAN: Dominic Gonzales LOCATION OF PLACEMENT: Piers # 10,11,12 & 13 STANDARD 6" X 12" AREA 28.27 SQ. IN. REPORT DATE: 7/26/05 SAMPLE DATE: 6/28105 PROJECT NO.: 286TXIK5 18 PAGE 2 OF 3 8:00 AM .. ConcreteSuppliec - Southern Star Time Left: 3:45 PM 330402 5 Truck #: 1054 91 Time Batched: 11:55 AM % Air Content: N/A Time Sampled: 12:40 PM Total No. of Test C~inders Made: 4 Product Code: 9329 Total Cubic Yards Placed: 30 Cement: N/A N/A N/A Added Watec. Weather Conditions: Air Temperature (F): Cloud)' & Warm 94 Fly Ash: Coarse A~lregate: N/A Water: NIA Unit Wei! ht of Fresh Concrete: N/A Air Content: N/A lA 7 7/5/05 147 78,000 2758 1 B 14 7112/05 147 77,000 2723 1C 28 7/26/05 147 95,000 3359 1 D 28 7/26/05 148 97,000 3430 Curing ASTM C-31 Test Method ~ ASTM C-143 ASTM C-39 & 231 Remarks: Tested concrete mesta/exceeds required strength. Very Truly Yours, Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 le Shear 3000/28 le Shear 3000~28 3000/28 3000/28 Cylinders Tested By: SE&T This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report only/applies to the samples tested and does not necessaril)' represent identical or similar samples. G:/2005/286txik5/Cpist rlCpistrl 8SF