WA0101-CR050720COl'FELL
DAILY CONSTRUCTION REPORT
PROJECT SH 121 Water Line DATE ./
PROJECT # WA 01-01 DAY
OWNER CITY of COPPELL WEATHER
TEM?
CONTRACTOR Fox Contractors, Inc. w~
HUMIDITY
PROJECT INSPECTOR__Larry Davis
IM ITJW I~IF IS IS I
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL
FOX CONTRACTORS
REMAP~KS
VISITORS
TI/VIE REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR