Loading...
SS9901-CS040624 (3)Turner Collie . Braden Inc.. TRANSMITTAL To~ From: Date: Job No.: Subject: See Distribution George Cisneros, P.E. - TCB June 24, 2004 052 131124.0001 04000.A123 (2.1) Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements Force Main Line D Shop Drawing Review Comments Submittal No. 3 TCB has the following comments on this submittal: Description Status Comment Training Certification Received in HDPE Fusion Joining Coating for 16" Blind Rejected Per Specification Section 15062, interior Flange lining shall be Protecto 401 ceramic epoxy by Vulcan Group; When you re-submit the shop drawings, please address all comments and submit seven (7) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Mastec [X] 1 copy of submittal to TCB file [ ] Other