SS9901-CS040624 (3)Turner Collie . Braden Inc.. TRANSMITTAL
To~
From:
Date:
Job No.:
Subject:
See Distribution
George Cisneros, P.E. - TCB
June 24, 2004
052 131124.0001 04000.A123 (2.1)
Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
Force Main Line D
Shop Drawing Review Comments
Submittal No. 3
TCB has the following comments on this submittal:
Description Status Comment
Training Certification Received
in HDPE Fusion
Joining
Coating for 16" Blind Rejected Per Specification Section 15062, interior
Flange lining shall be Protecto 401 ceramic epoxy
by Vulcan Group;
When you re-submit the shop drawings, please address all comments and submit seven (7) copies to
this office.
Distribution: [X] 2 copies of submittal to the City
[X] 4 copies of submittal to Mastec
[X] 1 copy of submittal to TCB file
[ ] Other