Loading...
Vista Point II 3-7-CS050726 (2)July 26, 2005 PK No.: 2584-04.362 Ms. Charlene La Mattina CITY OF COPPELL Engineering Department 255 Parkway Boulevard Coppell, Texas 75019 VISTA POINT II, LOTS 3 - 7 Re: for Variance on Pavement Design Request Coppell, Texas Dear Ms. La Mattina: On behalf of Standridge Companies, we request that the City of Coppell grant a variance to the Subdivision Ordinance on the pavement design criteria for Lot 3 - 7, Block A, Vista Point II. Standridge wishes to eliminate the use of lime stabilization on this project in order to save on cost associated with the pavement. In lieu of lime stabilization Standridge will increase the concrete strength from 3600 psi to 4000 psi for the fire lanes, and increase the thickness from 6 inches to 7 inches. Thank you, for your consideration on this matter. If you have any questions or need any additional information, please contact me at your convenience. Erik M. Hauglie, P.E. EMH/jpm 2534-24 enc. CC: Stacy Standridge - Standridge Companies Jeff Libby - Standridge Companies