Loading...
Ballet TX-LR050728S^M E.G ,EE. ,G & TESTING, ,.P. Serving The Geo-lndustry Since 1974 '~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 CLIENT: =ROJECT: Head Construction, Inc. 3030 LBJ, Suite 700 Dallas, TX 75234 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT STANDARD 6" X '12" AREA 28.27 SQ. IN. Proposed Ballet Academy ~~''''''/ lc4o~ F il~tl~eST)~ Court ~'- ~,'l-rN: Ken Head SE&T TECHNICIAN: Dominic Gonzales LOCATION OF PLACEMENT: Piers # 6 & 9 Time Arrived: 8:00 AM Time Left: 3.'30 PM Slump (Inchesl: Con~.,~ Temperature (FI: 91 % Air Content: Total No. of Test Cylinders Made: 8 Total Cubic Yards Placed: 40 Added Water: N/A 5.75 N/A Cloudy & Warm 94 N/A Weather Co.,~;[;o.s: Air Temperature (F): REPORT DATE: 7/28105 SAMPLE DATE: 6/29/05 PROJECT NO.: 286TXIK$ REPORT NO.: 19 PAGE 2 OF 4 Concrete Supplier, _ So.u~e~,j._Ster Ticket #: 953440 Truck #: 8845 Time Batched: 9:42 AM Time Sampled: 10:15 AM Product Code: 9329 Cement: N/A Fly Ash: N/A Coarse Aggregate: N/A Water. N/A Air Content: N/A 1A 7 7/6/05 147 59,000 2086 Shear 3000~28 1 B 14 7/13~05 146 73,000 3000/28 1C 28 7/27/05 146 85,000 3006 le Shear 3000/28 1D 28 7/27/05 146 ~,000 le Shear 3000/28 Curing ASTM C-31 Test Method Cylinders Tested By: ~ ASTM C-143 ASTM C-39 & 231 SE&t Remarks: Te~e~ conc~e n~ee~/exceede required strength. Very Truly Yours, Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. and does not necessarily represent identical or similar samples. G:/20051286txik51CpistrlCpistr19SF SAM ENGINEERING & TESTING, L.P, Serving The Goo-Industry Since 1974 '~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 CLIENT: 3ROJECT: Head Construction, Inc. 3030 LB J, Suite 700 Dallas, TX 75234 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT STANDARD 6" X 12" AREA 28.27 SQ. IN. Proposed Ballet Academy of Texas 145 Fitness Court Coppell, TX A'FI'N: Ken Head SE&T TECHNICIAN: Dominic Gonzales LOCATION OF PLACEMENT: Pavement - Southeast Entrance, West Side REI~ORT DATE: 7/28/05 SAMPLE DATE: 6/29/05 PROJECT NO.: 286TXlK5 REPORT NO.: 19 PAGE 3 OF 4 Concrete Supplier: Nelson Bros. Ticket #: 154164 Truck #: 207 Time Batched: 9:45 AM Time Arrived: . 8:00 AM . _ Time Left: 3:30 PM Slump (Inches): 5 Concrete Temperature (FI: 91 % Air Content: N/A Total No. of Test C~/li~Gers Made: 8 Total Cubic Yards P{ace~: 40 Added Wa~er: 15 Gallons , Weather Conditions: Cloud), & Warm Air Tempera[urn (F): 94 Unit N/A Time Sampled: 10:40 AM Product Code: PD00/AEA Cement: N/A FI}/Ash: N/A Coarse Aggregate: N/A Water: N/A % Air Content: N/A 2A 7 7/6/05 148 63,000 2B 14 7/13/05 142 81,000 2C 28 7/27/05 142 92,000 2D 28 7/27/05 143 91,000 Curing ASTM C-31 Test Method Slump ASTM C-143 ASTM C-39 & 231 Remarks: Tested concrete meets/exceeds required strength. 2864 3253 3218 CylinderMade By: SE&T le Shear 3000/28 3000128 le Shear 3000/28 le Shear 3000/28 Cylinders Tested By: SE&T Very Truly Yours, Sadik (SAM)AI-Musawe, MSc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior wriffen consent. This report only applies to the samples tested and does not necessarily represent identical or similar samples. G:/2005/286txikS/CpistrlCpistr 19SF