July 29, 2005
Greg Yancey
Turner-Gesek Investments
722 S Denton Tap Rd Ste200
Coppell TX 75019
RE: Mercantile Addition, Phase 2
Dear Mr. Yancey:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities
for the referenced project.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Thank you for your
cooperation during this construction, and if I can be of further service, please contact me at (972)
304-7090.
Sincerely, //
Rick O' Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
CC:
Ken Griffin, P.E., Director of Engineering & Public Works
Keith R. Marvin, P.E., Civil Engineer
Glenn Hollowell, P.E., Asst. Director of Public Works
Greg Jones, Chief Building Official