MA 03/04-LR050604Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 02.1077
DATE: 4 June 2005
SUPPLIER:
Paving, intersection of South Village and MacArthur
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No, Cement
Ticket No. Flyash
Time Batched Sand
Time Sampled in.
Concrete Temp. (ASTM C1064) 1 .0 in.
Air Content IASTM C231} Water
Unit Weight (ASTM c13e) Admix #1
Ambient Temp. Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
449 7 06/11/05 120,700 4270
450 28 07~02/05 J~47,3Q0 5~Q
451 28 07/02/05 J.41,eQ0 $020
28-DayAverage 512Q
40OO
NOTE: Cylinders and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
1 hour lab. processing
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148