Loading...
MA 03/04-LR050604Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 4 June 2005 SUPPLIER: Paving, intersection of South Village and MacArthur SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No, Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064) 1 .0 in. Air Content IASTM C231} Water Unit Weight (ASTM c13e) Admix #1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 449 7 06/11/05 120,700 4270 450 28 07~02/05 J~47,3Q0 5~Q 451 28 07/02/05 J.41,eQ0 $020 28-DayAverage 512Q 40OO NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: 1 hour lab. processing (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148