Loading...
SS9901-CN050715· :N a sTe c July 15, 2005 Kenneth M. Gdffin, P.E. Director of Engineering / Public Works The City of Coppell 255 Parkway Coppell, Texas 75019 RE: Deforest Road Lift Station Improvements Force Main Line "D" Project # SS 99-0t Change Order #5 Dear Mr. Griffin: Attached are two (2) original executed Change Order #5 documents for the construction of the vaults as discussed on the above referenced project. We have retained one copy for our files. Should you require any further information or clarification feel free to contact me at (214) 571- 2516. Sincerely, Estimator MasTec North America, lnc, 4747 Irving Blvd, Suite 221 Daliasr Texas 75247 ':'214.571~2500 fax214571.2555 wvcvv,masteccom July 12, 2005 Robbie Dupree, Dallas Division Vice President MasTec North America, Inc. 4747 Irving Blvd., Suite 221 Dallas, TX 75247 FAX 214/571-2565 Deforest Road Lift Station Improvements Force Main Line "D" Project # SS 99-01 Change Order #5 Dear Mr. Holland: Attached are three original Charge Order #5 documents for the construction of the vault as has been discussed on the referenced project. Please execute the documents and return two of the originals to me. One of the originals is for your file. If you have any questions please feel free to give Rick O'Dell, Construction Inspector, a call at 972/304-7090. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 E-mail kgriffin~ci.coppell.tx.us CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: CHANGE ORDER NO.: Deforest Road Lift Station Improvements Force Main Line D MasTec North America, Inc. City of Coppell Five (5) DATE: 7/11/05 Item Description Additional labor and equipment for construction of vault that replaced 30" Gate Valve deleted in Change Ord #2 includes: Additional Material Costs Labor Excavator Front End Loader Pick Up Total Revision to Contract Amount Original contract amount Net Increase in contract amount Change Order #1 Net Decrease in contract amount Change Order #2 Net Increase in contract amount Change Order #3 Net Increase in contract amount Change Order #4 Net Increase in contract amount Change Order #5 Revised contract amount Net increase in contract time of completion Revised Contract time of completion Quantity Unit Unit Price Total 1 LS 4 DAYS 3 DAYS 3 DAYS 4 DAYS 606.00 606.00 822.25 3,289.00 365.00 1,095.00 180.00 540.00 55.00 220.00 $5,750.00 $ 2,364,835.54 $ 1,350.00 ($ 32,330.70) $ 5,907.00 $ 9,631.00 $5,750.00 $ 2,355,142.84 5 DAYS 305 DAYS The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Accepte~TCity Date Agreed to by Contractor Date · a sTe c July 8, 2005 IVY. Rick O'Dell Construction Inspector City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 750i9 Re: DeForest Rd. Lift Station Improvements Force Main Line D C.~,.~n,L.e Order Nc 5 Deer Mr. O'Deil: '! he original esfir~,atc fc:r !he referenced .cro'je~ inc:]uded three days labor and equipmem io From, pou~ t~t~ :Jolin!~. ?!ace the g(i" !?m .:a{ve ~ta m~o!e stmclm'e; However, ~e v;zd:t 5~at ~v~:s ;,:qu3red ;~': ~&is locafio:: required an additional five da~:.s labor and" ~.c,~,.tl ..... [,.. y ...... .,.. r~.t,.t..t .. pc,-~mq:- contraci to ,'., ml',cr,::atc ior this, dtffcrcn:;e a.~ al; ~.. Additional Mate:'ia] Cost i LS 606.('0 606.00 Labor 4 DAYS 822.25 3~289.00 Excavator 3 DAYS 365,00 ! ,095.00 Front End Loader 3 DAY S 180.00 540.00 Pick Up 4 DAYS 55.00 220.00 Respectfully submitted, Mastec North America Dallas Division Vice President MasTec North America, Inc. 4747 Irving Blvd,, Suite 221 Dallas, Texas 75247 214.571.2500 fax 214.571 2555 vcwwmastec.com