ST9904-CS000512TxDOT SH 121 TASK FORCE REPORT
Note: Section numbers in narrative below correspond to numbers on drawings.
May t2, 2000
SH 121 CAPACITY IMPROVEMENTS (STAGE I)
A. Section 1: Tarrant/Dallas County Line to North of Denton Creek (4-lane
divided highway with 2-lane frontage roads)
Completed -- July 1992
B. Section 2: North of Denton Creek to IH 35E (4/6 lane divided highway)
(CSJ 0364-03-078 & 0364-03-077)
Completed -- November 1993
C. Section 3: IIt 35E to East of FM 1171 (6-lane divided highway)
Completed -- June 1991
Section 4: East of FM 1171 to East of the Elm Fork of the Trinity River
Completed -- July 1988
Section 5: East of the Elm Fork of the Trinity River to West of the
Burlington Northern Railroad (4-lane divided highway)
(CSJ 0364-03-042)
Completed -- February 1994.
Crider Road Project (0364-03-079)
Completed -- September 1995
Section 6: West of the Burlington Northern Railroad to East of Legacy
(4-lane divided highway)(CSJ 0364-03-043)
Completed -- March 1994
Section 7: East of Legacy to East SH 289 (4-lane divided) (including the
SIt 289 intersection) (CSJ 0364-04-028 & 0364-04-032)
Completed-- May 1995
Do
Page 1 of 5
Updated: 05/12/00 8:57 A2q
H. Section 8: SH 289 to US 75 (3-lane frontage roads)(CSJ 0364-04-022)
The Commission approved funding for this project at their 11-18-99 meet-
ing as part of a supplement to the 2000 UTP. This project now has Priori-
ty 1 status for FY 2003 with funding from Category 4C - STP-MM ($12
million) and Category 12 - ComnUssion Strategic Priority ($28 million).
The current construction cost estimate is $41,350,000 (~0t: including: the
Custer Road Mainlane Ove~ass)~
Additional cost to add mainlane overpasses at cross-streets (allowing
through traffic to bypass intersections):
CROSS-STREET ADDITIONAL COST
Rasor / Hilcrest Road $6,203,933
Coit Road $4,560,874
Independence Parkway $4,473,293
Custer Road $4,967,318
Rowlett Road $4,925,420
Stacy Road $4,153,717
Lake Forest Road $4,016,494
Watters Road $4,416,029
TOTAL $37,717,078
II.
4. The Custer Road Mainlane Overpass will be included in this project and
will be funded by Collin County.
5. ROW Acquisition Status: 45 of 106 parcels have been acquired.
6. Design StatuS: 22H ~omplet¢ Anticipated completion date of "Plans Ad-
equate for Utility Relocations": End of December 2000. Anticipated Let-
ting Date: October 2002.
SH 121 LEWISVILLE BYPASS (STAGE I)
A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage
roads)(CSJ 3547-03-002 & 3547-02-003)
Completed -- October 1998
Section 10: Denton Tap Road to Lake Vista (3-lane frontage roads)
Completed -- July 1988
Section 11: Lake Vista to IH 35E (3-lane frontage roads)(CSJ 3547-01-002)
Completed -- June 1996.
Page 2 of 5
Updated: 05/12/00 8:57 AM
D. Section 12: IH 35E to Existing SH 121 Near FM 544 (3-lane frontage
roads, freeway constructed where frontage roads are not
proposed)(CSJ 3547-01-004)
Opened to traffic: October 1999.
III. SH 121 FREEWAY IMPROVEMENTS (STAGE II)
A. Section 13: Tarrant County Line to North of Denton Creek (conversion to
freeway)(CSJ 0364-02-017 & 0364-03-064)
1. This project is currently listed as a Long Range Project (LRP).
2. Candidate for Category 3A -- National Highway System Mobility.
3. Estimated Construction Costs:
CSJ COUNTY FROM TO LENGTH COST
0364-02-017 Dallas Tarrant CL Denton CL 1.728 $5ii000~
0364-03-064 Denton Dallas CL Denton Crk 0.300 $ ~ ~0~ 000
Total ~Oi~Oh ~
TxDOT's Fort Worth District is including this section of the SH 121 Free-
way in an ongoing MIS, Schematic, and EA consultant contract they have
in the area. The Fort Worth District is working closely with the City of
Grapevine to develop the transportation needs in the area. The following
am estimated milestone dates:
DESCRIPTION ESTIMATED DATE
MIS Complete
Public Meeting: Preliminary Schematic and EA findings presented.
Public Hearing: Final Schematic and Final EA presented. Earl~ ~l
S: ~e Pablie M~e~fig ~d H6~g dates ha~ b~n Pa~hea b~ck t~ ~i6~ ~e
B. Section 14:
Existing SH 121 Near Denton Creek to Existing SH 121 Near
FM 544 (Lewisville Bypass)(Mainlanes)(CSJ 3547-03-003,
3547-02-004, 3547-01-005, 3547-01-008, & 3547-01-009)
i . ,l~t ~ 1. ,. This project is currently listed as a Long Range Project (LRP).
~ raj .,, ,/~',ak,~,. rece~ed add~tmn~ Priority 2 progr~g au~o~ty fo~ project
/11~ ~w~, ~ 2. Candidate for Catego~ 3A -- National ~ghway System Mobility.
.~ a $[~ T~OT ~ - Page 3 of 5
[-I~ · fi-- '' . q ~ ~)- Updated: 05/12/00 8:57 ~
3. Estimated Construction Costs:
CSJ COUNTY FROM TO LENGTH COST
3547~03-003 Denton SH 121 Dallas CL 0.500 $ 5,500,000
3547-02-004 Dallas Denton CL Denton CL 1.800 $12,600,000
3547-01-005 Denton Dallas CL Lake Vista Dr. 1.085 $ 7,800,000
3547-01-008 Denton Lake Vista Dr. E. of IH 35E 0.730 $40,500,000*
3547-01-009 Denton W. of Hebron FM 544 3.432 $22,400,000
Total $88,800,000
* Includes $18,119,000 for cost of direct connections.
Section 15: FM 544 to US 75 (CSJ 0364-04-023, 0364-04-024,
0364-03-066, 0364-03-067, 0364-03-086, & 0364-03-087)
The selections for NHS Mobility, Category 3A, in the 2000 UTP, approv-
ed by the Commission on 09-30-99, include CSJ's 0364-03-066, 0364-03-
067, and 0364-04-023 under Priority 2 status. CSJ 0364-04-024 still has
LRP status.
2. Frontage Road Estimated Construction Costs (6-lane frontage roads):
CSJ COUNTY FROM TO LENGTH COST
0364-03-066 Denton FM 544 FM 423 1.917 $ 7,695,917
0364-03-067 Denton FM 423 Collin CL 3.030 $12,164,126
0364-04-906 Collin Denton CL DNT 0.982 $ 3,942,301
0364-04-023 # Collin DNT SH 289 1.515 $34,400,000
See Section 8 Collin SH 289 US 75
Total $58,202,344
# Includes mainlane structures at DNT and SH 289.
3. Mainlane Estimated Construction Costs (Add 6-lane mainlanes to 6-lane
frontage roads):
CSJ COUNTY FROM TO LENGTH COST
0364-03-086 Denton FM 544 FM 423 1.917 $11,920,993
0364-03-087 Denton FM 423 Collin CL 3.030 $18,654,120
0364-04-907 Collin Denton CL DNT 0.982 $ 6,106,633
0364-04-905 Collin DNT SH 289 1.515 $12,400,000
0364-04-024 Collin SH 289 US 75 9.059 $62,500,000
Total $111,581,746
Design milestones for 0364-04-023:
Plans Adequate: July 2001
Plans Complete: July 2002
Letting Date: October 2002
Page 4 of 5
Updated: 05/12/00 8:57 AM