Loading...
ST9904-PS030801DRAFT 2004 UTP-STATEWIDE MOBILITY PROGRAM I Draft--Under Review I Dallas District Projects D1 SH 121: TARRANT COUNTY LINE TO RECONSTRUCT TO 8 LANE FREE~VAY WITH $70,100,000 Cat 2 DENTON COUNTY LINE NR DENTON FRONTAGE ROADS AND INTERCHANGE; 1.7 CREEK--0364-02-017 MI; FY2006 D2 SH 121: DALLAS COUNTY LINE TO NR CONVERT 4 LN DIV TO 8 LANE FREEWAY $17,000,000 Cat 2 DENTON CREEKS364-03-064 WITH FRONTAGE ROADS; 0.3 MI; FY2006 D3 SH 121: FM 544 TO COLLIN COUNTY CONSTRUCT 6 LANE FREEWAY WITH 6 LANE $48,500,000 Cat 2 LINE --0364-03-066 FRONTAGE ROADS; 1.9 MI; FY 2004 $18,100,000 Cat 7 $8,200,000 Local D4 SH 121: DENTON COUNTY LINE TO CONSTRUCT 6 LANE FREEWAY WITH 6 LANE $8,600,000 Cat 2 DALLAS NORTH TOLLWAY---O364-04-038 FRONTAGE ROAD; 0.9 MI; FY 2004 $3,800,000 Cat 7 $1,800,000 Local D5 SH 121: DALLAS NORTH TOLLWAY TO CONSTRUCT 4 LN FRTG ROAD (PHASE 1 OF $28,000,000 Cat 2 0.7 MI WEST OF FM 2478---0364-04-037 FRWY) W/MAINLANES FROM DNT TO SH 289 $3,704,065 Cat 5 INCL I/C; 1.5 MI; FY 2004 $3,013,313 Cat 7 $5,000,000 Cat 11 $10,062,922 Cat 12 D6 SH 114; 0.3 MI EAST OF WISE COUNTY WIDEN TO 4 LANE DIVIDED RURAL; 2 LANE $30,000,000 Cat 2 Possible re-prioritization? LINE TO 2100 FEET WEST OF FM 156-- RURAL UNDIVIDED TO 4 LANE RURAL 0353-02-029 FREEWAY; 5 MI D7 SH 114 AT FM 156--0353-02-063 CONSTRUCT INTERCHANGE; 2 LANE RURAL $8,200,000 Cat 2 Possible re-prioritization? UNDIVIDED TO 4 LANE URBAN FRWY; 0.5 MI D8 SH 114: HARRIET CREEK TO IH 35W-- WIDEN TO 6 LANE DIVIDED URBAN WITH $53,680,000 Cat 2 Possible re-prioritization? 0353-02-062 FRONTAGE ROADS; 2 LANE RURAL UNDIVIDED TO 6 LANE URBAN FRWY; 2.5 MI D9 IH 35E: 0.18 MI. SOUTH OF US 77 TO 0.29 RECONSTRUCT AND ADD TWO MAIN LANES; $2,160,000 Cat 2 Possible re-prioritization? MI. NORTH OF US 77--O048-04-074 4 LANE RURAL FREEWAY TO 6 LANE RURAL FREEWAY; 0.5 MI; FY 2004 D10 IH 35E: 0.29 MI. N. OF US 77 TO DALLAS/ RECONSTRUCT AND ADD 2 MAIN LANES; 4 $15,000,000 Cat 2 Possible re-prioritization? ELLIS COUNTY LINE--C442-03-031 LANE URBAN FRWY TO 6 LANE URBAN FRWY; 3.2 MI; FY 2004 D11 IH 35E: DALLAS/ELLIS COUNTY LINE TO RECONSTRUCT AND ADD 2 MAIN LANES; 4 $17,280,000 Cat 2 Possible re-prioritization? 0.15 MILES N. OF PARKERVILLE RD-- LANE RURAL FRWY TO 6 LANE RURAL FRWY; 0442-02-127 2.3 MI; FY 2004 Project has advanced to a higher authorization. DRAFT 2004 UTP-STATEWIDE MOBILITY PROGRAM I Draft--Under Review Fort Worth District Projects F1 SH 114 FUNNEL: W COLLEGE, IN CONSTRUCT SEPARATE FREEWAY $39,410,000 Cat 2 GRAPEVINE TO DALLAS C/L (MANAGED (MANAGED FACILITY) WITH 4 LANES; 4.3 MI FACILITY)--0353-03-079 EXISTING=4 LANE URBAN FREEWAY, PROPOSED=10 LANE URBAN FREEWAY F2 SH 114 FUNNEL: BS 114L, IN RECONSTRUCT FREEWAY, FR ROADS AND $123,439,876 Cat 2 GRAPEVINE TO DALLAS COUNTY LINE-- RAMPS FROM 4/8 TO 8/10 LANE FACILITY; 1.9 0353-03-059 MI EXISTING=4 LANE URBAN FREEWAY, PROPOSED=10 LANE URBAN FREEWAY F3 SH 121: SH 114TO SH 36G--0364-01-112 RECONSTRUCT FRWY, FR. RDS., RAMPS AND $114,830,000 Cat 2 DIR CONNECTORS TO SH 114 FROM 4 TO 8/1 ...; 2.1 MI EXISTING=4 LANE URBAN FREEWAY, PROPOSED=8 LANE URBAN FREEWAY F4 SH 121 FUNNEL: IH 635 TO SH 114-- RECONSTRUCT FREEWAY WITH COLLECTOR $112,890,000 Cat 2 0364-01-113 FACILITY & INTERCHANGE WITH SH 114/ INTERNATIONAL PKWY; 4 TO 8 LANE URBAN FREEWAY; 1.3 MI F5 SH 121 FUNNEL: FM 2499 TO S OF IH 635 RECONSTRUCT FREEWAY W/COLLECTOR $162,580,000 Cat 2 INTERCHANGE~364-01-115 FACILITIES, FRONTAGE RDS, RAMPS AND INTERCHANGE WITH FM 24...; 0.8 MI F6 SH 121 FUNNEL: DALLAS COUNTY LINE RECONSTRUCT FROM 4 TO 8 LANE URBAN $14,017,536 Cat 2 TO FM 2499--0364-01-072 FREEWAY, RAMPS AND FRONTAGE ROADS; 0.4 MI; FY 2006 F7 IH 30:0.379 MILES WEST OF TARRANT CONSTRUCT 5 LEVEL INTERCHANGE AT SH $12,260,000 Cat 2 COUNTY LINE TO TARRANT COUNTY 161; 6 LANE URBAN FREEWAY; 0.3 MI; FY LINE--1068-02-115 2004 F8 IH 30: OAKLAND BLVD IN FT WORTH, CONSTRUCT ADDITIONAL THRU LANES & $38,210,000 Cat 2 EAST TO DALLAS CO LINE--1068-02-072 UPGRADE TO STANDARDS & TMS; 6 LANE URBAN FREEWAY TO 8 LANE URBAN FREEWAY; 13.2 MI; FY 2005 F9 IH 30:1.0 MI WEST OF SH 360 TO CONST DIR CONN INTCHG AS SH 360 & $90,690,000 Cat 2 DALLAS CO LINE--1068-02-076 TRAFFIC MANAGEMENT SYSTEM; 2.7 MI EXISTING=6 LANE URBAN FREEWAY, PROPOSED=8 LANE URBAN FREEWAY Project has advanced to a higher authorization. Legend '~ ~'BOT" MAiN LANES & FRONTAGE ~MAIN LANES ONLY ~'FRONTAGE ONLY ~c~s Ramp Major At.rial CounW Line Major Lakes D~FT 2004 UTP PROG~M Locator Map