Loading...
ST9904-CS000310TxDOT SH 121 TASK FORCE REPORT Note: Section numbers in narrative below correspond to numbers on drawings. March 10~ 2000 SH 121 CAPACITY IMPROVEMENTS (STAGE I) A. Section 1: Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed -- July 1992 B. Section 2: North of Denton Creek to IH 35E (4/6 lane divided highway) (CSJ 0364-03-078 & 0364-03-077) Completed -- November 1993 C. Section 3: IH 35E to East of FM 1171 (6-lane divided highway) Completed -- June 1991 D. Section 4: East of FM 1171 to East of the Elm Fork of the Trinity River (bridges) Completed -- July 1988 E. Section 5: East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed -- February 1994. Crider Road Project (0364-03-079) Completed -- September 1995 F. Section 6.' West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway)(CSJ 0364-03-043) Completed -- March 1994 G. Section 7: East of Legacy to East SH 289 (4-lane divided) (including the SH 289 intersection) (CSJ 0364-04-028 & 0364-04-032) Completed -- May 1995 Page 1 of 4 Updated: 03/09/00 2:35 PM H. Section 8: SH 289 to US 75 (3-lane frontage roads)(CSJ 0364-04-022) The Commission approved funding for this project at their 11-18-99 meeting as part of a supplement to the 2000 UTP. This project now has Priority 1 status for FY 2003 with funding from Category 4C - STP-MM ($12,000,000) and Category 12 - Commission Strategic Priority ($28,000,000). 2. The current construction cost estimate is $41,350,000. Additional cost to add mainlane overpasses at cross-streets (allowing through traffic to bypass intersections): CROSS-STREET ADDITIONAL COST Rasor / Hilcrest Road $6,203,933 Coit Road $4,560,874 Independence Parkway $4,473,293 Custer Road $4,967,318 Rowlett Road $4,925,420 Stacy Road $4,153,717 Lake Forest Road $4,016,494 Watters Road $4,416,029 TOTAL $37,717,078 II. be: funded: by ColI!n Countyi 5. ROW Acquisition Status: Design Status 20~ e6mPl~i~ Anticipated completion date of "Plans Adequate for Utility Relocations": End of December, 2000. Anticipated Letting Date: October 2002. SH 121 LEWISVILLE BYPASS (STAGE I) A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage roads)(CSJ 3547-03-002 & 3547-02-003) Completed -- October 1998 B. Section 10: Denton Tap Road to Lake Vista (3-lane frontage roads) Completed -- July 1988 Page 2 of 4 Updated: 03/09/00 2:35 PM C. Section 11: Lake Vista to IH 35E (3-lane frontage roads) (CSJ 3547-01-002) Completed -- June 1996. D. Section 12: IH 35E to Existing SH 121 Near FM 544 (3-lane frontage roads, freeway constructed where frontage roads are not proposed)(CSJ 3547-01-004) Opened to traffic: October 1999. III. SH 121 FREEWAY IMPROVEMENTS (STAGE II) A. Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway)(CSJ 0364-02-017 & 0364-03-064) 1. This project is currently listed as a Long Range Project (LRP). 2. Candidate for Category 3A -- National Highway System Mobility. 3. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 0364-02-017 Dallas Tarrant CL Denton CL 1.728 $37,000,000 0364-03-064 Denton Dallas CL Denton Crk 0.300 $ 3,000,000 Total $40,000,000 TxDOT's Fort Worth District is including this section of the SH 121 Freeway in an ongoing MIS, Schematic, and EA consultant contract they have in the area. The Fort Worth District is working closely with the City of Grapevine to develop the transportation needs in the area. The following are estimated milestone dates: DESCRIPTION ESTIMATED DATE MIS Complete Public Meeting: Preliminary Schematic and EA findings presented. Ap~i ~000 Public Hearing: Final Schematic and Final Em presented. October 2000 B. Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville Bypas$)(Mainlanes)(CSJ 3547-03-0037 3547-02-004, 3547-01-005, 1. This project is currently listed as a Long Range Project (LRP). 2. Candidate for Category 3A -- National Highway System Mobility. Page 3 of 4 Updated: 03/09/00 2:39 PM 3. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 3547-03-003 Denton SH 121 Dallas CL 0.500 $ 5,500,000 3547-02-004 Dallas Denton CL Denton CL 1.800 $12,600,000 3547-01-005 Denton Dallas CL Lake Vista Dr. 1.085 $ 7,800,000 3547-01-008 Denton Lake Vista Dr. E. of lZI 35E 0.730 $40,500,000* 3547-01-009 Denton W. of Hebron FM 544 3.432 $22,400,000 Total $88,800,000 * Includes $18,119,000 for cost of direct connections. Section 15: FM 544 to US 75 (CSJ 0364-04-023, 0364-04-024, 0364-03-066, & 0364-03-067) The selections for NHS Mobility, Category 3A, in the 2000 UTP, as approved by the Commission on 09-30-99, include CSJ 0364-03-066, CSJ 0364-03-067, and CSJ 0364-04-023 under Priority 2 status. CSJ 0364-04- 024 still has LRP status. 2. Frontage Road Estimated Construction Costs (6-lane frontage roads): CSJ COUNTY FROM TO LENGTH COST 0364-03-066 Denton FM 544 FM 423 1.917 $ 7,695,917 0364-03-067 Denton FM 423 Collin CL 3.030 $12,164,126 0364-04-9XX * Collin Denton CL DNT 0.982 $ 3,942,301 0364-04-023 # Collin DNT SH 289 1.515 $34,400,000 See Section 8 Collin SH 289 US 75 Total $58,202,344 # Includes mainlane structures at DNT and SH 289. 3. Mainlane Estimated Construction Costs (Add 6-lane mainlanes to 6-lane frontage roads): CSJ COUNTY FROM TO LENGTH COST 0364-03-086 Denton FM 544 FM 423 1.917 $11,920,993 0364-03-087 Denton FM 423 Collin CL 3.030 $18,654,120 0364-04-9XX * Collin Denton CL DNT 0.982 $ 6,106,633 0364-04-923 * Collin DNT SH 289 1.515 $12,400,000 0364-04-024 Collin SH 289 US 75 9.059 $62,500,000 Total~ $11'1,581,746 * These CSJ's are for reference only. They have not been set-up 4. Design milestones for 0364-04-023: Plans Adequate: July 2001 Plans Complete: July 2002 Letting Date: October 2002 Page 4 of 4 Updated: 03/09/00 2:35 PM 666f XJ O3ZYq30 m £ooz mmmm-- ~008 m looz m 000~ mm uol~.P./.Jods'uDJI ]o ~uoui,uPdeO ~DXOI 66-9-0 [ O3SIA3a S/33POkld [ ilI~]OI~d - dill 000~ 13 1 ~/S ICI sv-m-mva .'1 LEGEND PRIORITY 1 FISCAL YEAR 2000 DCAT 2374-04-043 $1.7 M FR: HAMPTON 12 DALLAS IH 20 · TO= S POLK ST ADD 2 LN FRONTAGE RD NS (PHASE II) sCAT SA DALLAS IH 635 2374-01-069 $36.1M FR: AT US IH [/C CONSTRUCTION OF INTERCHANGE (PHASE 1) FRONTAGE ROAD COIT oCAT IH $5E 0196-02-078 $11,6 M FR: AT FM 1 DENTON 7 IN LEWISVILLE CONSTRUCT INTERCHANGE (~ACAT COLL[N SH 5 0047-09-027 $1.8 M FR: AT DGNO 4G ILROAD UNDERPASS TO: RAILROAD DOT NO. 763 390W REPLACE RAILROAD UNDERPASS uCAT 4G DALLAS FM S42 0048-01-043 $2.0 M FR: AT RLINGTON NORTHERN RAILROAD UNDERPASS IN LANCASTER REPLACE RAILROAD UNDERPASS (~ECAT DALLAS FM 1382 1047-02-022 $15.1M FR: IN 12 DAR HILL & DESOTO ON FM 1382 FROM HAMPTON W RD. TO: US 67 RECONSTRUCT EXISTING 2 LN RURAL RDWY TO ULTIMATE 6 LN. (~CAT 12 DALLAS IH 35E 0442-02-087 $72.6 FR: PARKERVILLE RD. TO: IH 20 WIDEN FROiVi 4 TO 6 LN. & 4 TO 8 LN. & 4 TO 10 LN. (~CAT 0092-06-084 $3.6 M FR: SH 31N 12 NAVARRO IH 45 TO: ROAN RD. CONSTRUCT FRONTAGE ROADS (~CAT 0135-10-025 $26.0 M FR: US 377 DENTON US 380 TO: COLLtN C/L WIDEN TO 4 LN DIVIDED RURAL ROAD c~RCAT 8057-18-002 $9.7 M FR: IN 17 DALLAS MH ROLLTON ON LUNA RD. FRON BELTLINE TO: LINE RD. TO OLD DENTON RD. EXTEND LUNA RD. ON NEW LOCATION AS A 6 LN DIVIDED N~ CAT 8B KAUFMAN FM 3486 1494-03-001 $1.2 M FR: SH 34 TO: FM 986 CONSTRUCT NEW 2 LN FM HIGHWAY ~CAT 161 2964-01-015 $37.5 M FR: S OF 3A DALLAS IH MACARTHUR TOt N OF IH 635 CONSTRUCT INTERCHANGE AT IN 635 AND BRIDGES AT LAS COLINAS FISCAL YEAR 2001 Q CAT 12 0353-05-084 $3.1U FR: LAWTHER DALLAS LOOP TO: AUDELIA WIDEN 6 LN DIVIDED URBAN TO 8 LN DIVIDED URBAN (~ CAT 31 0162-03-029 $20.0 M FR: HILL 3B NAVARRO SH C/L TO: FM 55 N CONSTUCT 4 LN DIVIDED FROM 2 LN. Q CAT FM 3120 3542-01-001 $2.6 M FR: FM 423 8B DENTON 1.0 MI S OF FM 720 W & S TO: LAKE LEWISV]LLE STATE PARK UPGRADE EXISTING COUNTY ROAD S~RCAT 17 DALLAS MH 8245-]8-001 $2,3 M FR: IN BALCH INGS & DALLAS CO. ON LAKE JUNE TO: NE RD FROM BALCH SPRINGS TO BELT LINE ~ CAT FM 548 2588-01-007 $2.9 M FR: 0,6 MI 8B KAUFMAN N OF US 80 IN FORNEYTO: 3.9 MI SW TO FM 740 RELOCATE FARM TO MARKET ROAD ACAT 12 COLLIN SH 289 0091-05-034 $6.0 M FR: AT NO PKWY CONSTRUCT GRADE SEPARATION (6 LN URBAN DIVIDED) T(~o:CAT 12 DALLAS SP 408 3000-01-006 $8.0 M FR: L(~DP 12 : IH 20 WIDEN EXISTING 4 LN TO 6 LN S~H CAT 3A ROCKWALL SN 205 0451-01-032 $11.1M FR: N OF 66 TO: SH 276 WIDEN 2 LN TO 6 LN URBAN DIVIDED HWY CAT 4G DALLAS FM 1382 1047-03-049 $8.1M FR: AT ION PACIFIC RAILROAD CROSSING TO: (DOT NO. 794 952A) CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE ~A CAT 4G DENTON SH 114 0353-02-053 $1.8 M FR: AT U.P. ILROAD UNDERPASS TO: DOT NO. 795 342V REPLACE RAILROAD UNDERPASS (~ CAT 17 DALLAS MH 8050-18-032 $4.3 M FR: IN BALCH SPRINGS AND MESQUITE ON BELTLINE RD. FR: LAKE JUNE TO: BRUTON RD. RECONSTRUCT EXISITING 2 LN RUAL TO 6 LN ~ CAT 17 DALLAS SH 310 0092-02-104 $8.0 M FR: OVERTON RD. TO: LOOP12 WIDEN 4 LN FACILITY ~ CAT 77 0195-02-040 $5.1M FR: IH 35 N 17 DENTON US OF DENTON. SE TO: US 380 RECONCTRUCT EXISITING 2 LN FACILITY TO PROVIDE 4LN ~ CAT 4G DALLAS SH 352 0430-01-046 $3.1M FR= AT THE U.P. RAILROAD BETWEEN HATCHER AND DIXON CONSRTUCT RAILROAD GRADE SEPARATION STRUCTURE AND APPROACHES ~) CAT 17 DALLAS MH 8050-18-037 $6.1M FR: IN IRVING ON BELTLINE ROAD AT RA[LTRAN CONSTRUCT GRADE SEPARATION FISCAL YEAR 2002 ~CAT 3A DALLAS IH 635 2374-01-106 $52.3 M FRt AT US 75 I/C CONSTRUCTION OF INTERCHANGE (PHASE 2) FRONTAGE ROADS MIDPARK R~,CAT DALLAS IH 635 2374-01-112 $2.2 M FRt MILLER 12 /ROYAL LN. TO: 0.8 KM S ADOITION OF 2 RAMPS TO COMPLETE FULL DIAMOND ~CAT IN 20 2374-03-054 S4.2 M FRt 12 DALLAS BONNIEVIEW TO= LANCASTER BLVD. CONSTRUCT FRONTAGE ROAD5 ~CAT 1068-04-110 $31,5 M FR: TARRANT 12 DALLAS IH 3O C/L TO= E OF NW 7TH ST WIDEN 6 TO 10 LANES AND ADD INTERCHANGES AND NOISE WALL ~CAT DENTON LP 288 2250-01-012 $4,8 M FR: US 380 TO: FM 426 WIDEN TO 6 LN DIVIDED URBAN 5 CAT ELLIS US 287 0172-05-071 $12.2 M FR: BUSINESS 12 67-Q SW OF MIDLOTHIAN TO= EXISTING US 287 (MIDLOT[AN BYPASS) CONSTRUCT 4 LN DIVIDED RURAL SECTION ON NEW LOCATION (~CAT 12 DENTON LP 288 2250-01-021 $8.9 M FM 426 TOt IH $5E WIDEN TO 6 LN DIVIDED URBAN RACAT 17 DALLAS MN 8050-18-027 $13.4 M FRt GRAND IRIE AND IRVING ON BELTLINE RD. FROM IH 30 TO= ROCK ISLAND RECONSTRUCT EXISTING 4 LN DIVIDED RUAL RDWY ~ CAT 17 DALLAS MH 8050-18-028 $5.7 FRt IN LANCASTER ON BELTLINE RD. FRt IH 35 E TOt BLUE GROVE RD. RECONSTRUCT EXISTING 2 LN RUAL TO 4 LN RUAL {~ CAT 4G NAVARRO SH 14 0095-02-015 $3.2 M AT H& TC RAILROAD REPLACE RAILROAD UNDERPASS (~ CAT 4G DENTON FM 3524 0081-05-034 $921,000 FRt AT T&P RAILROAD REPLACE RAILROAD UNDERPASS FISCAL YEAR 2003 (~ CAT 3A COLLIN US 75 0047-06-112 $2.5 FR:O. 3 KM S OF PARK BLVD. TO: SPRING CREEK PKWY WIDEN FROM 6 LN TO 8 LN ~ CAT 8037-18-003 $8.3 M FRt IN DALLAS DALLAS MH ON LUNA RD. FROM NORTHWEST HWY. TO: ROYAL LN RECONSTRUCT EXISTING 2 LN RUAL TO 6 LN DIVIDED I~) CAT 0048-01-03B $18.3 M FR: IN 17 DALLAS SH 342 DALLAS ON CORINTH ST (SH 342) FRt 8TH ST TO; USTRIAL BLVD. WIDEN TRINITY RIVER BRIDGE CAT 17 DALLAS SH 352 0197-01-010 $4.0 M FR: SECOND · TO HASKELL AVE. IN DALLAS RECONSTRUCT INTERSECT[ON {~CAT 0353-05-083 $8.6 M FR: IN 17 DALLAS SP 244 DALLAS ON NORTHWEST NWY FROM BUCKNER BLVD. TO : AUDELIA CONSTRUCT INTERCHANGE ON 2 MAJOR THOROUGHFARES (~ CAT 17 DALLAS SP 348 0353-04-069 $2.8 M FR: ON LUNA RD AT NORTHWEST HWY IN DALLAS CONSTRUCT DRADE SEPARATION DELAYED FROM FY 1999 (~)CAT 3E DALLAS IH 635 2374-02-094 $73,000 FR: OATES DRIVE 2 INTERSECT[ON IMPROVEMENTS (~ CAT 8B KAUFMAN FM 598 0751-04-001 $2.0 M FM 1392 1 MI SW OF SH 205 SE TO= SH 205 IN TERRELL UPGRADE EXISTING COUNTY RD, ~CAT COLLIN SH 289 0091-05-033 $5.8 M FR: AT 3E PARK BLVD. UPGRADE OF NON-FREEWAY FACILITY CONSISTING OF GRADING DALLAS D I STR I CT 2000 UTP - PRIORITY 1 PROJECTS REVISED 10-6-99 rTexos Dep~rtment of Tronsporh#lon DALLAS DISTRICT 2000 UTP - PRIORITY PROdECTS REVISED 10-6-99 rTex~s Deportment of Trensport~tlon 2 :RANBALL OLA CORSICANA LEGEND PRIORITY 2 (I~oCAT 3A DOLLIN SH 121 0364-,04-023 $6.7 M FR: SH 289 : DENTON C/L ADD 4 LN FRWY TO RPOP 4 LN FRTG RDS, (2~)CAT 3A DALLAS SH 161 2964-01-009 $58,0 M FR~ SPUR 303 TO: S OF TN 30 CONSTRUCI' 4 LANE FREEWAY WITH 6 LANE FRONTAGE RD, SECT. o CAT SA COLLIN SH 121 0364-04-022 $41,3 M FR: tis 75 10: SH 289 NSTRU,~T~ 6 LN DIVIDED URBAN SECFION  ')CAT $A DALLAS SH t6! 2964-01-024 $49.0 M FR: S OF SH 183 OF SH 183 CONSTRUCT INTERCHANGE o CAT 3A DALLAS SH 161 2964-01-010 $112.0 M FR: N OFIH SO TO: SH 183 NSTRUCT 6 LN FRWY WITH 6 LN FRTG RD SECTIONS (~oCAT SA DALLAS IH 635 2374-01-107 $58.0 M FR: LIS 75 I/C AT NSTRUCTION OF INTERCHANGE (PHASE 3) FRTG. RDS, E OF US 75 3A DALLAS IH 30 t068-04-083 $110,6 M FR~ LOOP 12 TO: IH ~E 6 LN TO 8 LN AND ADD INTERCHANGES AND NOISE WALL (~CAT 3A DALLAS IN 635 2374-01-109 $23,6 M FR: AT US75 i/C CONSTRUCTION OF INTERCHANGE (PHASE S) US 75 MAIN LANES (~oCAT 3A 635 $39,8 M FR: A'I US 75 I/C DALLAS IN 2374-01-108 NSTRUCIION OF INTERCHANGE (PHASE 4) IH 635 MAIN t. ANES ,N CAT 3A DALLAS SH 16t 2964-01-004 $32.0 M FR~ N OF IH 20 70~ SP 303 STRUGT 4 LN FRWY WITH 6 LN FRTG RDS (I~DCAT 3A DENTON US 380 0134-09-034 $3.8 M FR= IH 35E TO: US 77 EN TO 6 LN DIVIDED URBAN I(I~CAT 3A DENTON SH 121 0564-03-067 $11.8 M FR: COLLIN D/L TO: FM 423 4 LN FREEWAt l0 PROPOSED 4 LN FRTO RDS. D CAT SA DENTON SM 114 0353-02-029 $24.0 M FR: WISE C/L TO: IH 35W EN 4 LN DIVIDED RURAL IA~CAT SA DENTON SH 121 0364-03-066 $5,2 M FR: FM ~ TO~FM ~ LN FREEWA~ TO 4 LN PROPOSED FRONTAGE ROAD N CAT SA DENTON US 380 0135-10~023 $11.7 M FR: LP 288 TO: US 17 IN TON CONSRUCT 6 LN DIVIDED URBAN 11~)CAT 3A ELLIS US 287 0172-05-066 $17,9 M FR: EXISTING US 287 TO: E OF DIS (NW OF WAX~NACHIE) WIDEN 4 LN DIVIDED RURAL C¢~ SA ELLIS US 287 0172-04-029 $8,6 M FR: IBEGIN BfPASS) W OF MIDLOTHIAN 67-.O SW OD MIDLOTHIAN CONSTRUCT 4 LN DIVIDED RURAL HWY ON NEW LOC,  )DCAT 3A ELLIS US 287 0172-04-028 $17.9 M FR : IOBNSON C/L TO: W OF LOTHIAN WIDEN TO 4 LN DIVIDED RURAL (~CAT 3A NAVARRO SH 31 0162-04-034 $20.5 M FR: W OF CORSIDANA TO: 45 CONSTRUCT 4 LN DIVIDED RURAL HWY NEW LOCAT!ON 2~ACAT 3A NAVARRO IN 45 0092~06-075 $ 20.0 M FR: ELI.IS C/L S TO~ N OF MBERS CREEK ADD 2 MAIN LANES  )NCAT 3B COLLIN US 380 0135-04-028 $21.6 M FR: E OF LAKE LAVON TO: T/COLL1N C/L WIDEN EXISTING FACILITY FROM 2 TO 4 LNS, ~.~CAT 3B DENTON ~JS 380 0134-09-029 $27,7 M FR: WiSE C/L 10: IH 35 WIDEN AND RECONSTRUCT AS 4 LN UNDIVIDED RURAL 2~ CAT 3E DALLAS SH ~61 2964--01-020 $1.3 M FR~ ROCHELLE LN TO: WALNUT HILL CONSTRUCT NOISE WALL 2 AND 3 (~TCAT 3A DALI_AS IH 20 2374-04-040 $16.3 M FR: AT LAKERIDGE PKWY/SN 161 ERCNANOECONSTRUCT 6 LN DIV, URBAN ORADE SEPARATION RAMPS AND DIRECT 2~LCAT 3A DALLAS IH 30 1068-04-115 $89.0 M FR~ AT SH 161/NW ~9'rH ST CONSTRUCT EVEL INTERCHANGE ~..(~FCAI 3A ELLIS IH 35 E 0048-04-074 $2,0 M FR= 0.18 MI S OF US 77 TO: 0.29 MI N US 77 RECONSTRUCT ANO ADD 2 MAIN LANES 2(27) CAT SA ELLIS IH35 E 0442-03-03i $16,0 M FR: 0,29 MI N OF DS 77 TO; BALLAD C/L ~D ONSTRDCT AND ADD 2 MAIN LANES (~)CAT SE ELLIS IH 35E 00~8-08-02~ $1.8 M FR: FM 308 l'O: FM 566 NEAR MILFORD ADDITIONAL ENTRANCE AND EXIT RAMPS ~CAY SE DALLAS IH 635 2374-01-1}1 $1.5 M FR: MONTFORT RD. TO: JUPITER RD, ~ INTERSECTION IMPROVEMENTS (~CAT 40 ELI_IS SH 34 0568-01-900 $1.4 M FR: 0.183 KM S OF FM 1183 TO: BI 45-D CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE AND APPROACHES <~ CA1 46 KAUFMAN SH 34 0173-04-025 $6.1M FR: US 80 TO: 0,3 MI S OF US 80 IN TERRELL CONSTRUCT 4 LN DIVIDED URBAN THOROUGHFARE DALLAS DISTRICT 2000 UTP - PRIORITY 2 PROJECTS REVISED 10-6-99 ~1~ Tex~s Deportment of Transportation