Loading...
ST9904-CS 991008TxDOT SH 121 TASK FORCE REPORT Note: Section numbers in narrative below correspond to numbers on drawings. October 8i I999 SH 121 CAPACITY IMPROVEMENTS (STAGE I) A. Section 1: TarranffDailas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed -- July 1992 B. Section 2: North of Denton Creek to IH 35E (4/6 lane divided highway) (CSJ 0364-03-078 & 0364-03-077) Completed -- November 1993 C. Section 3.' IH 35E to East of FM 1171 (6-lane divided highway) Completed -- June 1991 Section 4: East of FM 1171 to East of the Elm Fork of the Trinity River (bridges) Completed -- July 1988 Section 5: East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed -- February 2, 1994. Crider Road Project (0364-03-079) Completed -- September 1995 Section 6: West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway)(CSJ 0364-03-043) Completed -- March 29, 1994 Section 7: East of Legacy to East SH 289 (4-lane divided) (including the SH 289 intersection) (CSJ 0364-04-028 & 0364-04-032) Completed -- May 3, 1995 Page 1 of 5 Updated: 10/07/99 4:51 PM Section 8: SH 289 to US 75 (3-lane frontage roads)(CSJ 0364-04-022) 1. The 2000~ as approved by the Commission on 0~ 30~99 includes this section under Priority 2 status for NHS Mobility, Category 3A. The Dallas District is proposing to build the frontage roads in their ulti- mate position for a future freeway. The project is split into the following three segments (if need be for ranking or due to right-of-way delays): From To Length Cost SH 289 Coit Road 2.720 Mile ~ t~0~ Coit Road FM 2478 2.235 Mile FM 2478 US 75 5.245 Mile Additional cost to add mainlane overpasses at cross-streets (allowing through traffic to bypass intersections): CROSS-STREET ADDITIONAL COST Rasor / Hilcrest Road $6,203,933 Colt Road $4,560,874 Independence Parkway $4,473,293 Custer Road $4,967,318 Rowlett Road $4,925,420 Stacy Road $4,153,717 Lake Forest Road $4,016,494 Watters Road $4,416,029 TOTAL $37,717,078 Page 2 of 5 Updated: 10/07/99 4:51 PM II. SH 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I) A. Section 9. North of Denton Creek to Denton Tap Road (3-lane frontage roads)(CSJ 3547-03-002 & 3547-02-003) Completed -- October 1998 B. Section 10: Denton Tap Road to Lake Vista (3-lane frontage roads) Completed-- 1988 Section 11: Lake Vista to IH 35E (3-lane frontage roads) (CSJ 3547-01-002) Opened to traffic on June 1, 1996. D. Section 12: IH 35E to Existing SH 121 Near FM 544 (3-lane frontage roads, freeway constructed where frontage roads are not proposed)(CSJ 3547-01-004) This project let on 01-09-96 and Brown & Root, Inc. was the low bidder with a bid of $45,502,101.11. The Commission awarded the contract at their 01-25-96 meeting and construction began on 04-29-96. 2. The Noise Wall ect (CSJ 3547-01-007) III. SH 121 FREEWAY IMPROVEMENTS (STAGE H) A. Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway)(CSJ 0364-02-017 & 0364-03-064) 1. This project is currently listed as a Long Range Project (LRP). 2. Candidate for Category 3A -- National Highway System Mobility. 3. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 0364-02-017 Dallas Tarrant CL Denton CL 1.728 $37,000,000 0364-03-064 Denton Dallas CL Denton Crk 0.300 $ 3,000,000 Total $40,000,000 Page 3 of 5 Updated: 10/07/99 4:51 PM TxDOT's Fort Worth District is including this section of the SH 121 Freeway in an ongoing M[.S, Schematic, and EA consultant contract they have in the area. The Fort Worth District is working closely with the City of Grapevine to develop the transportation needs in the area. The following are estimated milestone dates: DESCRIPTION ESTIMATED DATE MIS Complete Public Meeting: Preliminary Schematic and EA findings presented. ~iitb~r ~ ~/li~ Me~ ~i~ S~h~mati~ ~ EA ~dings p~e~ente~ ~arc~ 2000 Public Hearing: Final Schematic and Final EA presented. Obt~2000 B. Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville Bypass)(Mainlanes)(CSJ 3547-03-003, 3547-02-004, & 3547-01-005) 1. This project is currently listed as a Long Range Project (LRP). 2. Candidate for Category 3A -- National Highway System Mobility. 3. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 3547-03-003 Denton SH 121 Dallas CL 0.500 $ 5,500,000 3547-02-004 Dallas Denton CL Denton CL 1.800 $12,600,000 3547-01-900 Denton Dallas CL Lake Vista Dr. 1.085 $ 7,800,000 3547-01-901 Denton Lake Vista Dr. E. of IH 35E 0.730 $40,500,000* 3547-01-902 Denton W. of Hebron FM 544 3.432 $22,400,000 Total $88,800,000 * Includes $18,119,000 for cost of direct connections. Page 4 of 5 updated: 10/07/99 4:51 PM C. Section 15: FM 544 to US 75 (Mainlanes)(CSJ 0364-04-023, 0364-04-024, 0364-03-066, & 0364-03-067) The selections for NHS Mobility, Category 3A, in the 2000 UTP, as approved by the Commission on 09-30~99, include CSJ 0364-03-066, CSJ 0364-03-067, and CSJ 0364-04-023 under Priority 2 status. CSJ 0364-04- 024 still has LRP status. 2. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 0364-03-066 Denton FM 544 FM 423 1.700 $ 5,209,593 0364-03-067 Denton FM 423 Collin CL 3.300 $11,832,535 0364-04-023 Collin Denton CL SH 289 2.200 $ 6,656,163 0364-04-024 Collin SH 289 US 75 9.059 $62,500,000 Total $86,198,291 Page 5 of 5 Updated: 10/07/99 4:51 PM ATTACHMENT 2