ST9904-CS 990611TxDOT SH 121 TASK FORCE REPORT Note: Section numbers in narrative below correspond to numbers on drawings. June 11, 1999 SH 121 CAPACITY IMPROVEMENTS (STAGE I) A. Section 1: Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed -- July 1992 B. Section 2: North of Denton Creek to IH 35E (4/6 lane divided highway) (CSJ 0364-03-078 & 0364-03-077) Completed -- November 1993 C. Section 3: IH 35E to East of FM 1171 (6-lane divided highway) Completed -- June 1991 D. Section 4: East of FM 1171 to East of the Elm Fork of the Trinity River (bridges) Completed -- July 1988 E. Section 5: East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed -- February 2, 1994. Crider Road Project (0364-03-079) Completed- September 1995 F. Section 6: West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway)(CSJ 0364-03-043) Completed -- March 29, 1994 G. Section 7: East of Legacy to East SH 289 (4-lane divided) (including the SH 289 intersection) (CSJ 0364-04-028 & 0364-04-032) Completed -- May 3, 1995 Page I of 4 Updated: 06/11/99 8:37 AM H. Section 8: SH 289 to US 75 (3-lane frontage roads)(CSJ 0364-04-022) The 1999 UTP, as approved by the Commission on 09-24-98, includes this section under Priority 2 status for NHS Mobility, Category 3A. The Dallas District is proposing to build the frontage rOads in their ulti- mate position for a future freeway. The project is split into the following three segments (if need be for ranking or due to fight-of-way delays): From To Length Cost SH 289 Coit Road 2.720 Mile $10,453,333 Coit Road FM 2478 2.235 Mile $8,589,412 FM 2478 US 75 5.245 Mile $20,157,255 Total $39,200,000 II. SH 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I) A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage roads)(CSJ 3547-03-002 & 3547-02-003) Completed -- October 1998 B. Section 10: Denton Tap Road to Lake Vista (3-lane frontage roads) Completed-- 1988 Section 11: Lake Vista to IH 35E (3-lane frontage roads) (CSJ 3547-01-002) Opened to traffic on June 1, 1996. D. Section 12: IH 35E to Existing SH 121 Near FM 544 (3-lane frontage roads, freeway constructed where frontage roads are not proposed)(CSJ 3547-01-004) This project let on 01-09-96 and Brown & Root, Inc. was the low bidder with a bid of $45,502,101.11. The Commission awarded the contract at their 01-25-96 meeting and construction began on 04-29-96. Construction is 99% complete with only minor signing, signal, and striping work remaining. The Noise Wall Project let on 11-13-98 with the low bid of $660,913.84 being submitted by Iowa Bridge & Culvert, Inc. The entire Bypass cannot open until the noise wall is complete (estimated completion: September 1999). TxDOT's Denton County Area Office has devised a traffic control Page 2 of 4 Updated: 06/11/99 8:37 AJ~