Loading...
ST9904-CS 990409 TxDOT Note: Section numbers drawings. SH 121 TASK FORCE REPORT in narrative below correspond to numbers on SH 121 CAPACITY IMPROVEMENTS (STAGE A. Section B. Section Ce Ee Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed -- July 1992 Fe North of Denton Creek to IH lane divided highway) (CSJ 0364-03-078 & 0364-03-077) 35E (4/6 Completed -- November 1993 Section IH 35E to East of FM 1171 (6-lane divided highway) Completed -- June 1991 Section East of FM 1171 to East of the Elm Fork of the Trinity River (brid~es) Completed -- July 1988 Section East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed -- February 2, 1994. Crider Road Project (0364-03-079) Completed -- September 1995 Section West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway) (CSJ 0364-03-043) Completed -- March 29, 1994 Section East of Legacy to East SH 289 (4-lane divided) (including the SH 289 intersection) (CSJ 0364-04-028 a 0364-04-032) Completed -- May 3, 1995 1 Updated: 04/08/99 5:12 PM H. Section 8~ SH 289 to US 75 (4-lane divided) (CSJ 0364-04-022) The 1999 UTP, as approved by the Commission on 09- 24-98, includes this section under Priority 2 status for NHS Mobility, Category 3A. The Dallas District is proposing to build the ultimate frontage roads with this project and split the project into the following three segments: From To Length Cost SH 289 Coit Road 2.720 Mile $10,453,333 Coit Road FM 2478 2.235 Mil6 $8,589,412 FM 2478 US 75 5.245 Mile $20,157,255 Total $39,200,000 II. SH 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I) A. Section North of Denton Creek to Denton TaD Road (3-lane frontage roads) (CSJ 3547-03-002 & 3547-02-003) Completed -- October i998 B. Section 10: Denton TaD Road to Lake Vista (3-lane frontage roads) Completed -- 1988 C. Section 11~ Lake Vista to IH 35E (3-lane frontage roads) (CSJ 3547-01-002) Opened to traffic on June 1, 1996. D. Section 12: IH 35E to Existing SH 121 Near FM 544 ( 3 - lane frontage roads, freeway constructed where frontage roads are not proposed) This project let on 01-09-96 and Brown & Root, Inc. was the iow bidder with a bid of $45,502,101.11. The Commission awarded the con- tract at their 01-25-96 meeting and construction began on 04-29-96. Construction is 99% complete and the anticipated completion date is June 1999. Noise walls are proposed on the north side of SH 121 between Huffines and Hebron. The noise walls will be constructed as a separate project. Project 2 Updated: 04/08/99 5:12 PM let ~n 11-13-98 with the low bzd of $660,913.84 being submitted by Iowa Bridge & Culvert, Inc. III. SH 121 FREEWAY IMPROVEMENTS (STAGE II} A. Section 13: Tarr~nt County Line to North of Creek (conversion to freeway) (CSJ 0364-02-017 & 0364-03-064) Denton This project is currently listed as a Long Range Project (LRP). Candidate for Category 3A -- National Highway System Mobility. 3. Estimated Construction Costs: CSJ COUNTY FROM 0364-02-017 Dallas Tarrant CL 0364-03-064 Denton Dallas CL TO Denton CL Denton Crk LENGTH 1.728 0.300 Total COST $16,000,000 $ 3,000,000 $19,000,000 4. TxDOT had a completed schematic (not approved). Property owners requested revisions to the schema- tic at some of the grade separations, which TxDOT agreed to. The City of Grapevine (with concur- rence from the City of Coppell) has requested changes to the schematic to better handle traffic at Grapevine Mills Mall, which TxDOT agreed to. B. Section Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville ByDass)(Mainlanes) (CSJ 3547-03-003, 3547-02-004, a 3547-01-005) 1. LRP status for this project has been received. 2. Candidate for Category 3A -- National Highway System Mobility. 3. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 3547-03-003 Denton SH 121 Dallas CL 0.500 $ 5,500,000 3547-02-004 Dallas Denton CL Denton CL 1.800 $12,600,000 3547-01-005 Denton Dallas CL FM 544 6.833 $73,500,000 Total $91,600,000 3 Updated: 04/08/99 5:12 PM Ce Section 1=~ FM 544 to US 75 (Mainlanes) (CSJ 0364-04-023, 0364-04-024, 0364-03-066, & 0364-03-067) The selections for NHS Mobility, Category 3A, in the 1999 UTP, as approved by the Commission on 09- 24-98, include CSJ 0364-03-066, CSJ 0364-03-067, and CSJ 0364-04-023 under Priority 2 status. CSJ 0364-04-024 still has LRP status. TxDOT estimates that construction plans can be complete 24 months after Priority 2 status is received. 2. Estimated Construction Costs: CSJ COUNTY FROM TO LENGTH COST 0364-03-066 Denton FM 544 FM 423 1.700 $ 5,209,593 0364-03-067 Denton FM 423 Collin CL 3.300 $11,832,535 0364-04-023 Collin Denton CL SH 289 2.200 $ 6,656,163 0364-04-024 Collin SH 289 US 75 10.200 $48,494,116 Total $72,192,407 4 Updated: 04/08/99 5:12 PM