Loading...
ST9904-CS 990126Major Investment Study January26,1999 Oel~arlmen! of ~ansporta#on TECHNICAL COMMITTEE City ol Colleyville City of Coppell MIS STUDY TEAM HDR Engineering, Inc Engineering Managemenl Services Gmcia & Asst.' Engineering. Inc H NTB Hicks & Company Kimlcy Horn & Associales NCTCOC; Mr. Kenneth Griffin, P.E. Director of Engineering, & Public Works\ City of Coppell P.O. Box 478 Coppell, TX 75019 Dear Mr. Griffin: This letter serves as a reminder of the Technical Committee Meeting on February 8, 1999 at 1:30 p.m. in Conference Room A at City of Grapevine's City Hail. The address is 200 South Main Street. This meeting will give us the opportunity to present the evaluation results of the viable alternatives, to present segment options for the primary alternative, and get your comments and feedback on them. We will also discuss the format for Public Meeting #4, and bring you up to date on the study schedule. This Technical Committee Meeting will include a workshop portion in order to review the segment options and to get feedback on your ideas and suggestions. The enclosed figures represent the initial segment options for you to review and provide input. We hope that you will be able to attend this meeting and if you have any questions or need additional information, please contact me at (817) 370-6614. Sincerely, Joseph W. Atwood, PE Project Manager Advance Project Development TxDOT-FTW Yellow Segment (From Northwest Highway west of Grapevine to the Main Street Bridge) Option YI This option will look at continuous frontage roads crossing SH 26 and the Cottonbelt rail line. Additionally, direct connector ramps linking Northbound SH 121 to westbound SH 114 as well as eastbound SH 114 to southbound SH 121 are proposed to tie into SH 114 west of SH 26 in order to provide for the large movement of traffic and alleviate the intersections at William D. Tare and SH 114. The following is a list of the major changes to the existing configuration. Reverse ramp on westbound SH114 east of FM 1709. Add exit ramp on eastbound SH ! 14 east of FM 1709. At-grade crossing of the frontage roads with the Cottonbelt railroad. Direct connections elevated from EB SH114 to SB SH121 & NB SH121 to WB SH 114. Elimination of the exit ramp from NB SH 121exit ramp to NB frontage road Elimination of SB entrance ramp from Main street to SH 121 Elimination of EB entrance ramp from William D Tare Elimination of Loop ramps at SH 26 Relocation of the EB & WB frontage road between SH 26 and William D. Tare Elimination of WB exit ramp to SH 26 Eastbound SH 114 was shifted to merge on the left side of SH 121 and likewise westbound SH 114 was shifted to merge from the right hand side of SH 121. Option Y2 This option will look at continuous frontage roads crossing under SH 26 and the Cottonbelt rail line. Additionally, direct connector ramps linking Northbound SH 121 to westbound SH 114 as well as eastbound SH 114 to southbound SH 121 are proposed to tie into SH 114 east of SH 26 in order to provide for the large movement of traffic and alleviate the intersections at William D. Tare and SH 114. The following is a list of the major changes to the existing configuration. Elimination of the exit ramp to FM 1709 west of SH 26. Add exit ramp on eastbound SH 114. Re-align SH 114 and frontage roads to go under the existing Cottonbelt Railroad and SH 26. Provide "Jug Handle" connections from frontage roads to SH 26. Eliminate eastbound exit ramp from SH 114 east of SH 26. Relocate eastbound entrance ramp east of SH 26. Direct connections elevated from EB SH114 to SB SH121 & NB SH121 to WB SH 114. Elimination Elimination Elimination Elimination Elimination Elimination of Loop ramps at SH 26 of eastbound entrance ramp from SH 26. of SB entrance ramp from Main street to SH 121. of WB entrance ramp from William D. Tare. of EB entrance ramp from William D. Tate. of ramp from NB SH 121 to William D. Tare. Eastbound SH 114 was shifted to merge on the left side of SH 121 and likewise westbound SH 114 was shifted to merge from the right hand side of SH 121. Option Y3 This option will look at modifying the loop ramps at SH 26 while keeping the existing discontinuous frontage roads along SH 114. Additionally, direct connector ramps linking northbound SH 121 to westbound SH 114 as well as eastbound SH 114 to southbound SH 121 are proposed to tie into SH 114 east of SH 26 in order to provide for the large movement of traffic and alleviate the intersections at William D. Tare and SH 114. The following is a list of the major changes to the existing configuration. Modify loop ramps at SH 26 Relocation of eastbound entrance ramp from SH 26. Eliminate eastbound exit ramp from SH 114 east of SH 26. Elimination of SB entrance ramp from Main street to SH 121. Elimination of EB entrance ramp from William D. Tate. Elimination of westbound exit ramp west of William D. Tare. Elimination of the exit ramp from NB SH 121exit ramp to NB frontage road. Direct connections from EB SH114 to SB SH121 (below grade) & NB SH121 to WB SH 114 (elevated). Eastbound SH 114 was shifted to merge on the left side of SH 121 and likewise westbound SH 114 was shifted to merge from the right hand side of SH 121. Option Y4 This option will look at continuous frontage roads along SH 114 under the existing Cottonbelt railroad. Additionally, direct connector ramps linking northbound SH 121 to westbound SH 114 as well as eastbound SH 114 to southbound SH 121 are proposed to tie into SH 114 east of SH 26 in order to provide for the large movement of traffic and alleviate the intersections at William D. Tate and SH 114. The following is a list of the major changes to the existing configuration. Reverse ramp on westbound SH114 east of FM 1709. Add exit ramp on eastbound SH 114 east of FM 1709. At-grade crossing of the eastbound and westbound frontage roads with the Cottonbelt railroad. Direct connections elevated from EB SH114 to SB SH121 & NB SH121 to WB SH 114. Elimination of the exit ramp from NB SH 121exit ramp to NB frontage road Elimination of SB entrance ramp from Main street to SH 121 Elimination of EB entrance ramp from William D Tate Elimination of Loop ramps at SH 26 Relocation of the EB & WB frontage road between SH 26 and William D. Tare Elimination of WB exit ramp to SH 26 Elimination of eastbound entrance ramp from William D. Tare. Eastbound SH 114 was shifted to merge on the left side of SH 121 and likewise westbound SH 114 was shifted to merge from the right hand side of SH 121. Green Segment (From Main Street bridge to Cottonbelt Bridge) Option G1 Widen existing northbound and southbound SH 121 ramps from two lanes to three lanes and reconstruct International Parkway to westbound SH 114/SH 121 ramp ~' Widen SH 121 ramps from two-lanes to three-lanes 3~ Construct a lntemational Parkway to westbound SH II4/SH 121 direct-connection ramp and remove existing loop ramp } Straighten out eastbound frontage road between Main Street and Business 114 Option G2 Reconstruct northbound connection from SH 121 to the north to facilitate SH 121 route continuity Reconstruct SH 121 faciliate route continuity Sign traffic for SH 121 with left exit for eastbound SH 114 Construct a International Parkway to westbound SH 114 / SH 121 direct-connection ramp and remove existing loop ramp Straighten out eastbound frontage road between Main Street and Business 114 Option G3 Reconstruct SH 121/International Parkway interchange to facilitate SH 121 route continuity Reconstruct SH 121 faciliate route continuity Sign traffic for SH 121 with right exit for eastbound SH 114 Reconstruct all ramps to facilitate weaving and decision making and remove existing ramps )' Straighten out eastbound frontage road between Main Street and Business 114 Option G4 Reconstruct SH 121/International Parkway interchange to to a fully directional four level interchange keeping SH 114 as primary east-west facilitate } Reconstruct all ramps to facilitate weaving and decision making and remove existing ramps )~ Straighten out eastbound frontage road between Main Street and Business 114 Blue Segment (From SH 121 Bridge over the Cottonbelt Rail Line north to Denton Creek) Option BI Connects IH 635 to SH 26 and add a southbound frontage road. Connects IH 635 ramps to arterial linking to SH 26 Adds Southbound frontage road Direction connections from SH 26 to SH 121 north of FM 2499 Minor revisions to Northbound frontage road to lengthen curve radius Option B2 Redirect FM 2499 to connect to SH 121 near Sandy Lake Road - north of Grapevine Mills Malls to remove pass-through traffic. } Connect SH 26 south of Grapevine Mills Mall with existing FM 2499 - creating a continuous facility to serve Grapevine Mills Mall Redirect FM 2499 traffic to connect to SH 121 near Sandy Lake Road Adds Southbound frontage road Direction connections from SH 26 to SH 121 north of FM 2499 Minor revisions to Northbound frontage road to lengthen curve radius Option B3 Redirects FM 2499 to connect to SH 121 north of Sandy Lake Road to remove pass- through traffic. Connect SH 26 south of Grapevine Mills Mall with existing FM 2499 - creating a continuous facility to serve Grapevine Mills Mall ~ Redirect FM 2499 traffic to connect to SH 121 north of Sandy Lake Road ~' Adds Southbound frontage road >' Direction connections from SH 26 to SH 121 north of FM 2499 ~' Minor revisions to Northbound frontage road to lengthen curve radius Option B4 Continue 13t 635 to SH 26 via a new 4-level fully directional interchange ~' Connect SH 26 south of Grapevine Mills Mall with existing FM 2499 - creating a continuous facility to serve Grapevine Mills Mall ~' Redirect FM 2499 traffic to connect to SH 121 at Sandy Lake Road ~' Adds Southbound frontage road ~ Direction connections from SH 26 to SH 121 north of FM 2499 ~' Minor revisions to Northbound frontage road to lengthen curve radius