Loading...
ST9904-CS 980804 9?2 960 AUG 0d-1998 ld:19 'qDR ENGINEERING INC. 972 960 dd?l P.01/06 Major Investment Study Facsimile Transmission [ Date: Deliver To: August 4, 1998 [ PaRes: Kent Collins Coppell Fax To Donald Dacus Euless Start Laster Grapevine Jerry Hedge Grapevine Jim Driscoll Irving John Black Lewisvilte Shawn Poe Southlak- Mike Morgan DART Don Williams DFW David Morris FHWA Dan Lamers NCTCOG Gustavo Baez NCTCOG Randall Skinner NCTCOG Ted Nestor NCTCOG Steve Gilbreath Fbwer Mound Joe A~wood TXDOT From: Brian Swindell Or,qanization: HDR En.qineerinfl 6 972-304-3570 817-685-1617 817-410-3003 817-410-3003 972-7Z1-3720 972-219-3487 817-488-6796 214-749-3662 972-574-8709 512-916-5881 817-640-3028 817-640-3028 817-640-3028 817-640-3028 972-874-3038 817-370-6614 (972) 960-4400 Message: Attached are meeting minutes from the July 27, SH 114/SH 121 Major Investment Study Technical Committee Meeting. Please review and make comments by Thursday, August 6 at 5:00p.m. If you have any questions please contact me. ~G-04-~998 ~4:~9 HDR ENG[NEE~[NG [NC. 97~ 9~ 447~ P,~×O~ Date/Time: Location: Attendees: Donald Dacus-Euless Stan Laster-Grapevine John Black-Lewisville MEETING SUMMARY Inv~b~en~ Study July 27, 1998 10:00 a.m. Techmcal Committee Meeting Grapevine City Hall Kent Collins-Coppell Jerry Hodge-Grapevine Jim Driscoll-Irvin§ Shawn Poe-Southlake Mike Morgan-DART Don Williams-DFW David Morris-PHWA Dan Lamers-NCTCOG Gustavo Ba~z-NCTCOG Randall Skinner- Ted Nester-NCTCOG Steve Gilbreth-Flower NCTCOG Mound Joe Atwood-TxDOT Will Hagood-HDR Brian Swindell-HDR Phil Ullman-HDR Joe Atwood, TxDOT SH 114/SH 121 Project Manager opened the meeting by bringing the participants up to date on the project since the last Technical ComnUttee Meeting. A consultant has been hired to assist the process and assist TxDOT. He then introduced the Study Team Project Manager, Will Hagood from HDR Engineering who introduced his staff and the other firms on the project Study Team. Will, then presented the project schedule and planned public involvement activities. Brian Swindell, HDR Engineering then presented an overview of the first public meeting. He presented the proposed study process, a three step evaluation process to narrow the 'alternatives from the conceptual alternatives, to the viable alternatives, to the primary alternatives, to a preferred alternative. Brian then discussed the evaluation process and grouped the general criteria in four categories - Public Involvement, Environmental. Engineering and Mobility issues. He then discussed that the public will be asked for input on alternatives to consider and identify issues vital to the study. He then opened the Technical Committee Meeting for feedback on the Public Meeting #1 presentation. Dan suggested a review of the kickoff meeting and rename the upcoming public meeting to Public Meeting Number Two. Don't discuss the number of ahematives for each evaluation phase (example 20, 5). Also, we should recognize that the studies have been conducted in the past but don't prejudice the study by emphasizing the existing corridor too much or stating that the existing corridor was the suggested corridor. Also, Dan wanted to insure that the initial study meetings have been conducted. A second kickoff meeting may need to be held with transportation agencies. Joe and Gustavo will double check to make sure that all milestones have been met. Dan reiterated that because of the SOV guidelines, a comprehensive modal analysis viewpoint needs to be stressed. The alternative may incorporate a number of modes especially ITS, TSM, TDM and upgrading other modes. Next, Dan suggested that Brian. during the presentation, state that short-term projects along the corridor have already completed and further projects may be identified as part of the MIS. These smaller or short-term projects may be incorporated in the final MIS or AUG-04 1998 14:20 Investment Study HDR ENGINEERIHG INC, 972 960 4471 P.03/06 MEETING SUMMARY July 27, 1998 - Technical Committee Meeting Page 2 of 3 (Continued) become throw-away projects (immediate congestion relief) which may be constructed but not incorporated into the MIS. Also, a rail option will probably be presented or suggested at the upcoming Public Meeting. Will asked that the group to introduce themselves and state any issues they may have: · Don William, DFW Airport - access issues with DFW Airport as well as the new western runway. · Gustavo Bias, NCTCOG Randy Skinner, NCTCOG · Jerry Hodge, City of Grapevine - Timeline too long and need to get funding. · Donald Dacus, City of Euless - Trails, Veloweb and Upgrading SH 360 · Ted Nester, NCTCOG - Congestion Management Issues · Dan Lamers, NCTCOG - Insure MIS is consistent · Mike Morgan, DART- Northwest Corridor MIS Project Manager - SH 114 improvements including Rail within corridor. · Stan La.stet, City of Grapevine - Similar to Jerry Hodge · Shawn Poe, City of Southlake - SH 114 issues · lohn Black, City of Lewisville- SH 121 north issues · Steve Gilbreath, Town of Flower Mound - Gap between SH 114/SH 121 interchange and SH 121 (Lewisville Bypass) · Kent Collins, City of Coppell- Bottleneck into city · David Morris, FHWA- Adhere to NEPA guidelines David Morris with FHWA asked that meeting be scheduled to consider their travel restriction. A 10 a.m. meeting time is appropriate. Brian then opened discussion regarding any questions or additions to the evaluation criteria. There were no comments. Brian then turned the meeting over to Gustavo to discuss t~affic modeling issues. Gustavo presented three alternatives for determining baseline analysis. After some discussion with Dan Lamers, Joe wanted the baseline to include 'all programmed improvements, l~he discussion consensus was the alternatives to include all 2020 recommended improvements but concerns over biasing the analysis were raised, Gustavo also gave all the cities present, a traffic network map. He asked that they mark the plots for committed projects within the cities and return markups to NCTCOG by August Action Items: Joe and Gustvo will check to see that the second kickoff meeting needs to be held to insure that the MIS milestones have been made. 1998 14:28 HDR ENGINEERING INC. 972 968 4471 P.04/06 MaJ=r In~ent study MEETING SUMMARY July 27, 1998 - Technical Committee Meeting Page 3 of 3 (Continued) · Mike Morgan will have a DART table at the next Public Meeting to address DART questions~ · Meeting with NCTCOG, TxDOT and HDR to discuss baseline traffic modeling. · Gustavo will send a letter to the cities transmitting the traffic network map and asking them to return the map NCTCOG by August 10. · Start will check on utilizing the Grapevine Convention Center for the Public Meeting for September 3 - 5 p.m. - 9 p.m. The meetings in the future may be at other times to best meet the needs of the interested public, Joe and Will will discuss this further. ~UG-0~-1998 1~21 HDR ENGINEERING iNC. ~72 960 ~471 AUG-D4 199B 14:21 HDR ENGINEERING INC. 9?2 960 4471 TOTAL