Major Investment
Study
Facsimile Transmission
[ Date:
Deliver To:
August 4, 1998 [ PaRes:
Kent Collins Coppell Fax To
Donald Dacus Euless
Start Laster Grapevine
Jerry Hedge Grapevine
Jim Driscoll Irving
John Black Lewisvilte
Shawn Poe Southlak-
Mike Morgan DART
Don Williams DFW
David Morris FHWA
Dan Lamers NCTCOG
Gustavo Baez NCTCOG
Randall Skinner NCTCOG
Ted Nestor NCTCOG
Steve Gilbreath Fbwer Mound
Joe A~wood TXDOT
From: Brian Swindell
Or,qanization: HDR En.qineerinfl
6
972-304-3570
817-685-1617
817-410-3003
817-410-3003
972-7Z1-3720
972-219-3487
817-488-6796
214-749-3662
972-574-8709
512-916-5881
817-640-3028
817-640-3028
817-640-3028
817-640-3028
972-874-3038
817-370-6614
(972) 960-4400
Message:
Attached are meeting minutes from the July 27, SH 114/SH 121 Major Investment Study Technical
Committee Meeting. Please review and make comments by Thursday, August 6 at 5:00p.m. If you have
any questions please contact me.
~G-04-~998 ~4:~9 HDR ENG[NEE~[NG [NC. 97~ 9~ 447~ P,~×O~
Date/Time:
Location:
Attendees:
Donald Dacus-Euless Stan Laster-Grapevine
John Black-Lewisville
MEETING SUMMARY
Inv~b~en~ Study
July 27, 1998 10:00 a.m.
Techmcal Committee Meeting
Grapevine City Hall
Kent Collins-Coppell
Jerry Hodge-Grapevine Jim Driscoll-Irvin§
Shawn Poe-Southlake Mike Morgan-DART Don Williams-DFW
David Morris-PHWA Dan Lamers-NCTCOG Gustavo Ba~z-NCTCOG
Randall Skinner- Ted Nester-NCTCOG Steve Gilbreth-Flower
NCTCOG Mound
Joe Atwood-TxDOT Will Hagood-HDR Brian Swindell-HDR
Phil Ullman-HDR
Joe Atwood, TxDOT SH 114/SH 121 Project Manager opened the meeting by bringing
the participants up to date on the project since the last Technical ComnUttee Meeting. A
consultant has been hired to assist the process and assist TxDOT. He then introduced the
Study Team Project Manager, Will Hagood from HDR Engineering who introduced his
staff and the other firms on the project Study Team.
Will, then presented the project schedule and planned public involvement activities. Brian
Swindell, HDR Engineering then presented an overview of the first public meeting. He
presented the proposed study process, a three step evaluation process to narrow the
'alternatives from the conceptual alternatives, to the viable alternatives, to the primary
alternatives, to a preferred alternative. Brian then discussed the evaluation process and
grouped the general criteria in four categories - Public Involvement, Environmental.
Engineering and Mobility issues. He then discussed that the public will be asked for input
on alternatives to consider and identify issues vital to the study. He then opened the
Technical Committee Meeting for feedback on the Public Meeting #1 presentation.
Dan suggested a review of the kickoff meeting and rename the upcoming public meeting
to Public Meeting Number Two. Don't discuss the number of ahematives for each
evaluation phase (example 20, 5). Also, we should recognize that the studies have been
conducted in the past but don't prejudice the study by emphasizing the existing corridor
too much or stating that the existing corridor was the suggested corridor. Also, Dan
wanted to insure that the initial study meetings have been conducted. A second kickoff
meeting may need to be held with transportation agencies. Joe and Gustavo will double
check to make sure that all milestones have been met. Dan reiterated that because of the
SOV guidelines, a comprehensive modal analysis viewpoint needs to be stressed. The
alternative may incorporate a number of modes especially ITS, TSM, TDM and
upgrading other modes.
Next, Dan suggested that Brian. during the presentation, state that short-term projects
along the corridor have already completed and further projects may be identified as part
of the MIS. These smaller or short-term projects may be incorporated in the final MIS or
AUG-04 1998 14:20
Investment Study
HDR ENGINEERIHG INC,
972 960 4471 P.03/06
MEETING SUMMARY
July 27, 1998 - Technical Committee Meeting
Page 2 of 3 (Continued)
become throw-away projects (immediate congestion relief) which may be constructed but
not incorporated into the MIS. Also, a rail option will probably be presented or suggested
at the upcoming Public Meeting.
Will asked that the group to introduce themselves and state any issues they may have:
· Don William, DFW Airport - access issues with DFW Airport as well as the new
western runway.
· Gustavo Bias, NCTCOG
Randy Skinner, NCTCOG
· Jerry Hodge, City of Grapevine - Timeline too long and need to get funding.
· Donald Dacus, City of Euless - Trails, Veloweb and Upgrading SH 360
· Ted Nester, NCTCOG - Congestion Management Issues
· Dan Lamers, NCTCOG - Insure MIS is consistent
· Mike Morgan, DART- Northwest Corridor MIS Project Manager - SH 114
improvements including Rail within corridor.
· Stan La.stet, City of Grapevine - Similar to Jerry Hodge
· Shawn Poe, City of Southlake - SH 114 issues
· lohn Black, City of Lewisville- SH 121 north issues
· Steve Gilbreath, Town of Flower Mound - Gap between SH 114/SH 121 interchange
and SH 121 (Lewisville Bypass)
· Kent Collins, City of Coppell- Bottleneck into city
· David Morris, FHWA- Adhere to NEPA guidelines
David Morris with FHWA asked that meeting be scheduled to consider their travel
restriction. A 10 a.m. meeting time is appropriate.
Brian then opened discussion regarding any questions or additions to the evaluation
criteria. There were no comments.
Brian then turned the meeting over to Gustavo to discuss t~affic modeling issues.
Gustavo presented three alternatives for determining baseline analysis. After some
discussion with Dan Lamers, Joe wanted the baseline to include 'all programmed
improvements, l~he discussion consensus was the alternatives to include all 2020
recommended improvements but concerns over biasing the analysis were raised, Gustavo
also gave all the cities present, a traffic network map. He asked that they mark the plots
for committed projects within the cities and return markups to NCTCOG by August
Action Items:
Joe and Gustvo will check to see that the second kickoff meeting needs to be held to
insure that the MIS milestones have been made.
1998 14:28
HDR ENGINEERING INC.
972 968 4471 P.04/06
MaJ=r
In~ent study
MEETING SUMMARY
July 27, 1998 - Technical Committee Meeting
Page 3 of 3 (Continued)
· Mike Morgan will have a DART table at the next Public Meeting to address DART
questions~
· Meeting with NCTCOG, TxDOT and HDR to discuss baseline traffic modeling.
· Gustavo will send a letter to the cities transmitting the traffic network map and asking
them to return the map NCTCOG by August 10.
· Start will check on utilizing the Grapevine Convention Center for the Public Meeting
for September 3 - 5 p.m. - 9 p.m. The meetings in the future may be at other times to
best meet the needs of the interested public, Joe and Will will discuss this further.