ST9904-CS 971201Pi
The SH 114 Major Investment Study is
focused on transportation
improvements in the SH 114 corridor
located north of DFW Airport. The study
Process involves everyone impacted by
transportation in and surrounding the study
area. Included are city governments, county
agencies, council of governments, state
agencies, federal agencies, toll road
authorities, mass tlansit agencies, airport
officials, and the general public.
The entities are collaborating to develop a
locally preferred transportation improvement
Plan. The plan may integrate as many
transportation modes and transportation
strategies as necessary to produce the
desired improvements, to cure existing and
expected transportation problems in the
corridor. This may include incorporating
high occupancy vehicle lanes, flex time work
hours, hike and bike trails, and /or toll
express lanes.
WHAT'S NEW
The Path to
Excellence
I■ he Texas Department p ment of
Transportation is dedicated to
provide transportation solutions in a timely
manner. Unforeseen variables in project
development sometimes interfere with
Project progression. The SH 114 Major
Investment Study project schedule has been
modified since the September issue of SH
114 MIS News. The project completion path
was modified to reflect changes concerning
the hiring of consulting engineers who will
assist TxDOT and the technical committee
in analysis and development of transportation
strategies. The impact is a five month delay.
The new path is summarized as follows.
Stage 1 (September `97 to September
98): Define design criteria. Develop basic
alternatives. Hold public meeting.
Y
w
r
Stage 2 (September '98 to January 199):
Develop transportation strategies for the
corridor.
Stage 3 (February `99 to October `99):
Produce conceptual studies of promising
strategies. Develop consensus on a locally
Preferred alternative.
Stage 4 (October '99 to April 2000):
Produce detailed study of locally preferred
alternative.
Stage 5 (May 2000 to November 2000).
Acquire regional approval for the locally
Preferred alternative.
Stage 6 (December 2000 to February
2001): Complete FEA /FONSI and acquire
regulatory agency approvals. Begin detailed
design.
Please review the project timeline graphic on
page 2. It contains details concerning each
specific MIS activity.
CURRENT EVENTS
Let Us Hear
from You!
Contact us by telephone, mail, or e-
mail. Telephone your concerns
about the SH 114 corridor directly
to Mr. Joe Atwood, PE at (817) 370 -6614.
Mail your concerns to:
SH 114/SH 121 MIS
c/o Texas Department of Trans.
PO Box 6868
Fort Worth, TX 76115 -0868
attn.: Joe Atwood, PE
or e-mail to:
sh 114mis @mailgw.dot.state.tx. us
TECHNICAL CORNER
Consulting
Engineers
Express
Interest in
MIS
TxDOT has sought out the assistance
of a consulting engineering firm.
requesting Advertisements
interest from m he nsultan s were Published
f
shed
in the Texas Register and on the state's
world wide web site. The advertisement ran
from November 21 'till December 10.
TxDOT received letters from seven
consultant firms.
The selection process is in progress, and the
consultant is expected to be on board and
functioning by March 1998.
Ch
Texas
Department
of Transporta�on The SH 114 MIS NEWS is a publication of the Texas Department of
Transportation's Fort Worth District_
114 and SH 929 corridor Major Its purpose is to inform interested citizens of the SH
nvestment Study progress and upcoming .events.
SH121/114 Opt. G -E _
Green Segment --
® Mainlanes
® Ramps � o
Frontage Roads
C=1 Bridges
I O • °o -
i y
O
� o
_ f
n
°
0 0
o
°, J J a
M V l 0 0 °
, oa � o3 °
°c70o °
o 190
�``� µl►' � q� o o CQ- -
QO
C
°0
0 °
J
I
11tk
o
n
IH635/FM2499 Opt. E
Blue Segment ° s
F inlanes
mps °
ntage Roads
dges
0
o �
L
° a a
o
oo^ CA P o
Quo �
�o
0
� o Oq o
a
� � o
0
o a
O oo
°DOo c� °Ii 00
�`pri° cb
SH360 Opt. Y -C
Yellow Segment
Finlanes
mps
ntage Roads
dges
�COOAM&O�J
Direct Conn. Opt. Y -F
Yellow Segment
Mainlanes
Ramps
Frontage Roads
D Bridges
N
f�
0 500 1000
SCALE IN FEET
Q
,� e
��Co Mmmk�
fix
� C
i 0
0
0
0
0
S H26 Opt. Y -D
Yellow Segment
® Mainlanes
Ramps
Frontage Roads
C] Bridges
N
f�
0 500 1000
SCALE IN FEET
k"""," W
c
Z�-,
FM 1709 Opt. Y -B
Yellow Segment
Mainlanes
Ramps
Frontage Roads
C� Bridges
N
f�
0 500 1000
SCALE IN FEET
q
,o
b�
�O
Ot
isa p
t
F
o.
' PerorAVA
� o
=�r J