ST9904-CS 970912 TxDOT Note: Section numbers drawings. SH 121 TASK FORCE REPO.,T in narrative below correspond to numbers on Sept e~b~e r , ~ 2 'i%~?1997 SH 121 CAPACITY IMPROVEMENTS (STAGE I) A. Section 1: Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed -- July 1992 B. Section 2: North of Denton Creek to IH lane divided highway) (CSJ 0364-03-078 & 0364-03-077) Completed -- November 1993 C. Section 3: 35E (4/6 D. Section E. Section 5: F. Section 6: G. Section 7: IH 35E to East of FM 1171 (6-lane divided highway) Completed -- June 1991 East of FM 1171 to East of the Elm Fork of the Trinity River (bridges) Completed -- July 1988 East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed -- February 2, 1994. Crider Road Project (0364-03-079) Completed -- September 1995 West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway) (CSJ 0364-03-043) Completed -- March 29, 1994 East of Legacy to East SH 289 (4-lane divided) (including the SH 289 intersection) (CSJ 0364-04-028 & 0364-04-032) Completed - May 3, 1995 Section 8: SH 289 to US 75 (4-lane divided) (CSJ 0364-04-022) The Dallas District requested that this project be elevated to Priority 2 in the 1996 Project Development Plan (PDP) Update and the 1997 Unified Transportation Program (UTP) . The project was not selected by the Commission under either of these programs. Therefore, Jay Nelson, P.E. (Dallas District Engineer) has programmed this project in Category 11 which is a 10-yr programming authority given to District Engineers to develop district discretionary projects. This allows the Dallas District to proceed with plan development and right-of way acquisition. order was ~ ~executed c~nti a current 1Y awai ~'[hg Work on the Draft 1998 UTP is currently underway. The TxDOT districts have updated project data on the mainframe for NHS and candidate NHS projects. Austin re-ranked these projects in February, 1997. The project was not selected to move up to priority 2 on the tentative lists received. 4 This project is still a candidate for Category 3A National Highway System Mobility. EA re evaluation clearance is pending ~Xp~oT doqumentatzon of.~ historical ~Ustln Of f zee ms now ~estlmatmng comple~Lon wmthmn ~he next couple of Weeks). 6. Estimated Construction Cost: $28,000,000. II. SH 121 (SPUR 553) LEWISVILLE BYPASS (STAGE (See attached for right of way status) A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage roads) (CSJ 3547-03-002 & 3547-02-003) This project let on 07-10 96 and J.D. Abrams was the low bidder at $14,581,681.91. The Commission awarded the contract at their July 1996 meeting. Construction began on 11--7 96 and is 62% complete~_ The anticipated completion date is Fe~ruary 1999. B~ Section 10; Denton Tap Road to L ze Vista (3-lane frontage roads) , Completed -- 1988 Co Section 11: Lake vista to IH roads) (CSJ 3547-01-002) 35E (3-lane frontage Opened to traffic on June 1, 1996 Section 12: IH 35E to Existing SH 121 Near FM 544 (3-lane frontage roads, freeway constructed where frontage roads are not proposed) (CSJ 3547-01-004) This project let on January 9, 1996 and Brown & Root, Inc. was the low bidder with a bid of $45,502,101.11. The Commission awarded the contract at their January 25, 1996 meeting. The pre-construction meeting was held on March 7, 1996 and construction began on April 29, 1996. Construction will take 36 months. C__onstruction is 3~5~] complete completion date is July 1999, recent ralns~ and the anticipated a small delay due to Noise walls are proposed on the north side of SH 121 between Huffines and Hebron. To help expedite the construction of these walls, a change order will be prepared to add the walls to this project rather than building them as a separate project (estimated wall start date: early 1998). III. Estimated Construction Costs: SH 121 FREEWAY IMPROVEM]ENTS (STAGE II) A. Section Tarrant County Line to North of Creek (conversion to freeway) (CSJ 0364-02-017 & 0364-03-064) This project is currently listed as a Long Range Candidate for Category 3A - - National Highway System Mobility. ~%' CSJ County From 'To Cost 0364 02-017 Dallas Tarrant CL Denton CL $16,000,000 0364-03 064 Denton Dallas CL Denton Crk $ 3,000,000 Total $19,000,000 B. Section 14: Existing SH 121 Near Denton Cmeek to Existing SH 121 Near FM 544 (Lewisville Bypass) (Mainlanes) (CSJ 3547-03-003, 3547-02-004, & 3547-01-005) 1. LRP status for this project has been received. 2. Candidate for Category 3A System Mobility. 3. Estimated Construction Costs: -- National Highway CSJ County From To Cost 3547-03-003 Denton SH 121 Dallas CL $ 5,500,000 3547-02-004 Dallas Denton CL Denton CL $12,600,000 3547-01-005 Denton Dallas CL FM 544 $73,500,000 Total $91,600,000 C. Section 15: FM 544 to US 75 (Mainlanes) (CSJ 0364-04-023, 0364-04-024, 0364-03-066, & 0364-03-067) o LRP status for CSJ's 0364-04-024 & CSJ 0364-03-066 has been received. CSJ's 0364-04-023 & CSJ 0364- 03-067 have not received UTP priority 2. However, the District has programmed these under discretionary category 11, similar to section 8 above, so as to allow project development to proceed. Candidate for Category 4E -- STP Urban Mobility or Category 3A -- NHS Mobility. 3. Estimated Construction Costs: CSJ County From To ~ Cost 0364-03-066 Denton FM 544 FM 423 $ 5,209,593 0364-03-067 Denton FM 423 Collin CL $11,832,535 0364-04-023 Collin Denton CL SH 289 $ 6,656,163 0364 04-024 Collin SH 289 US 75 $48,494,116 Total $72,192,407 as Department of Transportation 1998 UNIFIED TRANSPORTATION PROGRAM EXHIBIT A 1998 UNIFIED TRANSPORTATION PROGRAM The lmermoda[ Surface Transportanon Effictency Act (ISTEA) ()f 1991 significantly restructured the availability of funds for transportation projects It specified the systems on which certain funds can be used, expanded the kinds of activities for which funds can be used and sigmficamly increased the role of the Metropolitan Planmng Organizations (MPO) in the planning and programming of projects. ISTEA requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for transportation projects. The Texas Transportation Commission (commission) and the Texas Department of Transportation (TxDOT) use the Unified Transportation Pro_~ram (UTP) as TxDOT's ten year plan for transportation project development. By updating the UTP annually, the commission and TxDOT are able to customize the UTP as many of the ISTEA programs become better defined. Annual updating also enables the UTP to serve as an integral part of the planmng process required by ISTEA. ISTEA requires each TIP to have a financial plan which addresses all federally funded projects inside the MPO's area of responsibility. ProJects listed in the STIP are the only projects which will be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The ST1P, the three year f'mancial plan, and the UTP are the backbone for developing projects for the intermodal transportation network in Texas Categories have been established in the UTP to reflect the various systems outlined by ISTEA such as the National Highway System (NHS), and the Surface Transportation Program (STP) for metropolitan, urban and rural areas. Most of the Texas Trunk System, as established by the commission, qualifies for NHS funds. Categories such as NHS are selected on a statewide basis after evaluations and rankings. Categories have also been established for the various activities that reflect the intended use of specified funds (such as safety, rehabilitation, preventive maintenance, Farm to Market ]Roads, bridges, etc.) Each of these various activities utilize different criteria to determine projects. The criteria attempts to highlight the projects that will best use that funding. For instance, mobility projects use cost, traffic; volume, roadway capacity and other factors to evaluate whether a particular proposed improvement is cost effective as a mobility improvement. (Most mobility projects are pan of NHS or STP.) Safety_ projects are evaluated using factors such as accident rate, traffic volume, cost, proposed improvement accident reduction factors, and others. Rehabilitation funds are distributed to districts using factors such as pavement condition, traffic volume, truck volume, and others Ihe Cong¢~gn Mm~g, at~gm aud A~_r~)~u41~Ix_ mpr0~c~nc~l (CMAQI catc~o~.~ addresses congesmm m~tigauon and air quality improvement m non-attainment areas of (tie state Funds are dlMrib~ucd lO those non-altammenl areas based on thmr population and thc scvm ~iy o[ a~r quality non anaimnenl The commission authorizes projects in the UTP m several different ways One way is for the commission to authorize individual projects for inclusion in certain categories of work, and on an annual basis, review and re-authorize projects as appropriate. These projects are usually mobility and bridge replacement and rehabilitation projects which typically rake a significant length of time to develop This is particularly tree of expanded or added capacity, and new location projects. These types of projects often require feasibility studies, route studies, public hearings, environmental assessments, assessments of social and economic impact, and the purchase of right- of-way. Levels of authority have been established for rrlobiliw projects to allow timely project progression through the various stages of project development. NHS mobility projects are evaluated statewide in comparison to other similar NHS mobility projects, based on cost effectiveness ranking and availability of funds. Levels of authorization are assigned based on the project's stage of development. Prioriw 2 is authority for the preparation of plans, specifications and estknates (PS&Es), and right-of-way acquisition. During Priority 2, project plans should be substantially complete (geometric, structural, hydraulic, and pavement design approved by TxDOT's Design Division) and a substantial amount of the required right-of-way acquired. Districts should establish a proposed fiscal year for construction contract award. priority_ I is the authority for completion of PS&Es, utility adjustments and consmmtion (projects let to contract). Generally, Priority I projects are the highest and best ranked projects that have letting dates within the next four fiscal years. Projects should be assigned letting dates only in Priority I. Districts should have completed 75 percent of the design work and right-of-way acquisition before moving from Priority 2 to Priority 1. The amount of projects in Priority I is constrained to four years of anticipated available apportionments. The most recent year of Priority 1 (1998) is the current year letting list. Another way the commission authorizes projects for some of the categories in the UTP is when tile commission authorizes program amounts (usually once a year) for activities which reflect the commission's intentions to address a specific activity such as rehabilitation or preventive maintenance The program amounts for a particular program may be allocated to the districts by a formula (with the formula also approved by the commission), with eligible projects developed by the districts on an as-needed basis within their allocation. For other programs such as safety or railroad signals, the program amounts are distributed on a statewide basis by the TxDOT division office responsible for the admimstration of that program after the division office has evaluated, ranked, prioritized and selected projects for the program The dollar amounts approved by thc conmusston for the programs arc generally based on anticipated apportionments that will become available in the future. })rojects in programs are authorized for development so that they will be available for construction when the apportionments are established annually. Many of the programs are managed by TxDOT as ~. Projects developed as part of a bank balance program can be selected for development, developed and let to contract with each project's cost debited to the bank balance of funds available for that program. Most of the bank balance programs consists of minor type projects directed towards preserving the current system and safety. The bank balance way of developing projects for programs allows TxDOT (both the districts and divisions) the flexibility to respond to modifications requested by the MPO and others without going back to the commission for every project change or cancellation as long as the bank balance for that program is not exceeded. A summary and discussion of each category of the UTP follows. The discussion includes the description, restrictions, allocation to districts, and policy for each category. 3 C~ 0 Z 0 0 Z L,kl Z CO O~ Z LLI 0 0 is Department of Transportation 1998 UNIFIED TRANSPORTATION PROGRAM EXH~IT C CATEGORY 3A NATIONAL I~GHWAY SYSTEM (NHS) MOBILITY UNIFIED TRANSPORTATION PROGRAM CATEGORY 3A - NATIONAL HIGHWAY SYSTEM - MOBILITY CAT 3A CAT 3A CAT 3A CAT 3A CAT 3A CAT 3A DISTRICTS FY 1998 FY 1999 FY 2000 FY 2001 PRIORITY2 TOTAL ABILENE $0 $0 $0 $0 $0 $0 AMARILLO $0 $3,200000 $0 $0 $0 $3.200,000 ATLANTA $0 $0 $5076,029 $0 $38 460,400 $43.536,429 AUSTIN $0 $0 $68,684000 $22,000,000 $441.500,000 $532.184,000 BEAUMONT $0 $0 $6,000.000 $0 $204.000,000 $210,000.000 BROWNWOOD $0 $0 $0 $0 $0 $0 BRYAN $0 $0 $0 $0 $28.625,000 $28,625.000 CHILDRESS $0 $0 $0 $0 $0 $0 CORPUS CHRISTI $0 $0 $0 $32.159.049 $31,813.544 $63,972,593 DALLAS $27,801.498 $139050,000 $27,879.000 $10,270,000 $525,382,362 $730.382,860 EL PASO $11,000,000 $0 $0 $8,180.000 $45,000.000 $64.180,000 FORT WORTH $0 $18,758.870 $17,500,000 $58.10~,000 $326,260.313 $420,625,183 HOUSTON $110,776,071 $132.956,334 $44,917.000 $4,761,000 $650.322,832 $943.733,237 LAREDO $0 $0 $0 $0 $1,670,900 $1,670,900 LUBBOCK $0 $0 $0 $0 $183.089,000 $183,089,000 LUFKIN $0 $0 $0 $0 $46,000,000 $46.000,000 QDESSA $0 $0 $0 $0 $250,000 $250.000 PARIS $4.685,870 $0 $0 $0 $24.326,000 $29,011,870 PHARR $0 $0 $0 $7,100,000 $48,100,000 $55,200,000 SAN ANGELO $0 $0 $0 $0 $13.500,000 $13,500,000 SAN ANTONIO $99,654,886 $614,400 $123,585,100 $50,400,000 $541,273.879 $815,528,265 TYLER $0 $0 $5,340,000 $0 $25.860.000 $31,200,000 WACO $0 $0 $0 $0 $29,401,000 $29,401,000 VVlCHITA FALLS $0 $21,000,000 $0 $0 $12,700.000 $33,700,000 YOAKUM $0 $0 $4,000.000 $0 $0 $4,000,000 TOTAL $253,918,325 $315,579,604 $302,981,129 $192,976,049 $3,217.535.230 $4,282,990,337 .................................................... ~0 DALLAS DALL.~S IH 635 2374 01-069 2 0 2000 1 $0 $27.879.000 $49 000 000 S27 879.000 LIM{TS FROH: AT ~ 15-1H 635 ]lC TO S7 130.OOO DALLAS DALL~ IH 635 2374-01-109 LIHITS FROM: AT US 25 IH 635 l/C 1~ EXlSl FACILITY: 6*F PRO~ FACILITY: 10'F ~ ~S~ 2 0 2 $0 $14.691.000 $0 $14.691. 000 RECONST US 75-IH 635 INI~RCHANGE WITH H0V CONNECTIO4S I)~,LLAS OALLAS IH ~ 2374-01-108 2.0 2 $0 S40.364.00~ $0 S40.364. 000 LIMITS F~ AT US 75 ]H 635 I/C TO DALLAS DENTON SH t)~ 0353 02 0Z9 ? 5 2 $0 $?4 000 000 ~? 500 0O0 $Z4 000 000 ti 000 000 $10400 000 $3.800.000 DACLAS ELLIS US 2B7 0172-0~-029 1 3 2 $0 $8.552.250 s614.000 $8.552.250 LIMITS FRC~i W OF MID4_Oll(IAN TO L(](~° 489 SwO~ MIDLOTHIAN (BYPASS) EXIST FACILITY 0 ~ FACILITY: 4DR PtlOJ D~SOt : COtSTRU[I 4 LANE OIVIDEO RURAL HIC~-&la.Y ON NEW LOCATION OAkLAS ELLIS US Z87 0172-O4-028 4 8 Z $0 $13.748.700 Il 180 000 $13 748700 LIMITS FROM PROPOSED SM ]60 TO W OF MIOLOTHIAN DALLAS ELLIS US 287 0172~05-071 2 3 2 $0 $1 100 000 $12180000 DALLAS NAVA,RRO SM 31 0162-04-034 S 6 2 $0 $20.458 000 s Department of TranSportation 1998 UNIFIED TRANSPORTATION PROGRAM EXHIBIT D CATEGORY 3B NATIONAl_, HIGHWAY SYSTEM (NHS) TRUNK SYSTEM UNIFIED TRANSPORTATION PROGRAM CATEGORY 3B - NATIONAL HIGHWAY SYSTEM - TRUNK SYSTEM CAT 3B CAT 3B CAT 3B CAT 3B CAT 3B CAT 3B DISTRICTS FY 1998 FY 1999 FY 2000 FY 2001 PRIORITY2 TOTAL ABILENE $0 $0 $0 $0 $0 $0 AMARILLO $0 $0 $0 $0 $0 $0 ATLANTA $0 $10.708.500 $0 $35,561,535 $15,974,524 $62,244,559 AUSTIN $0 $0 $0 $0 $0 $0 BEAUMONT $0 $0 $33.140,000 $0 $129,550,000 $162,690,000 BROWNWOOD $0 $0 $0 $0 $0 $0 BRYAN $16.025,000 $17,950.000 $5,000,000 $0 $107,265,000 $146,240,000 CHILDRESS $0 $0 $0 $0 $4,515,939 $4,515,939 CORPUS CHRISTI $0 $0 $0 $0 $14,410.000 $14,410,000 DALLAS $0 $9.000,000 $26.000.000 $0 $25.400.000 $60,400,000 EL PASO $8,000.000 $1,500,000 $0 $0 $0 $9,500,000 FORT WORTH $29.795.275 $16.355,800 $18.180.000 $30,767.000 $36,000,000 $131.098,075 HOUSTON $0 $0 $15,800,000 $15,700.000 $22,724,000 $54,224,000 LAREDO $0 $7,060,000 $0 $0 $17,107,193 $24.167.193 LUBBQCK $0 $0 $0 $0 $0 $0 LUFKIN $0 $0 $0 $4.401,000 $25.200.000 $29,601,000 ODESSA $0 $0 $0 $0 $0 $0 PARIS $0 $0 $0 $0 $25.665.000 $25,665.000 PHARR $0 $2,950,000 $0 $O $0 $2,950,000 SAN ANGELO $0 $0 $0 $0 $15,670,000 $15,670,000 SAN ANTONIO $0 $0 $0 $0 $0 $0 TYLER $0 $11.100.000 $0 $0 $83.570,000 $94,670,000 WACO $0 $16,750,000 $4,950,000 $0 $0 $21,700,000 WlCHITA FALLS $0 $0 $0 $0 $0 $0 YOAKUM $0 $0 $0 $0 $11.100,000 $11,100.000 TOTAL $53,820,275 $93,374,300 $103,070,000 $86.429,535 $534,151,656 $870,845,766 ,xas Department of Transportation 1998 UNIFIED TRANSPORTATION PROGRAM EXHIBIT G CATEGORY 4G SURFACE TRANSPORTATION PROGRAM (STP) RAILROAD GRADE SEPARATION SAFETY PROGRAM UNIFIED TRANSPORTATION PROGRAM CATEGORY 4G - STP RAILROAD GRADE SEPARATIONS CAT 4G CAT 4G DISTRICTS FY 1998 FY 1999 ABILENE $0 AMARILLO $0 ATLANTA $0 AUSTIN $0 BEAUMONT $10,000,000 BROWNWOOD $0 BRYAN $0 CHILDRESS $0 CORPUS CHRISTI $0 DALLAS $0 CAT 40 CAT 40 CAT 40 CAT 40 FY 2000 FY 2001 PRIORITY 2 TOTAL $0 $0 $0 $3.989.000 $3.989,000 $0 $0 $0 $8,000.000 $8.000.000 $0 $0 $0 $3.240,000 $3.240,000 $0 $0 $0 $18.700,000 $18,700,000 $0 $11,800,000 $0 $0 $21,800,000 $0 $0 $0 $6,800,000 $6,800,000 $0 $0 $0 $11,850,000 $11,850,000 $0 $0 $0 $1,595,000 $1,595,000 $0 $0 $0 $10,490,000 $10,490,000 $0 $10,100,000 $3,600,000 $10,250,000 $23,950,000 EL PASO $0 $0 FORT WORTH $0 $8.590,200 HOUSTON $2,200,000 $0 LAREDO $0 $0 LUBBOCK $0 $0 $0 $0 $5,000.000 $5,000,000 $4,944,672 $3,903,050 $6.998,000 $24.435,92~ $2,250,000 $10,068,000 $16.250,000 $30.768,000 $0 $0 $19,000,000 $19,000.000 $0 $0 $0 $0 LUFKIN $0 ODESSA $0 PARIS $0 PHARR $0 SAN ANGELO $0 $0 $0 $0 $3,861.000 $3,861,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SAN ANTONIO $0 '15YLER $0 WACO $0 WICHITA FALLS $0 YOAKUM $0 $6,201.600 $0 $0 $0 $6,201,600 $0 $0 $0 $7,750.000 $7,750,000 $0 $0 $2,700,000 $3.000,000 $5,700,000 $0 $0 $0 $2,300,000 $2,300,000 $0 $0 $0 $4,820,000 $41820,000 TOTAL $12,200,000 $14,791,800 $29,094,672 $20.271,050 $145,893,000 $222,250,522 L[VEL O~PME R PART lC 1PAl ION LENGTH $CHED OF FED(PAL/STATE DISTRiCi ~OORIRS COUNTY F~tY NO CONT-SEC.JOB MILLS DATE ALFFrORITY EST ROU COSI EST CONSI COSI DALLAS EN~LLAS FM 1382 1047 03-049 0 0 ZOO0 I $0 $8. 100. 000 $1 000.000 $8 lO0 000 $1. 800. OOO $0 $1.800.000 LIMITS FROt~ AT H ~ T C RAILROA~ Lm~ )0 RAILi~3A/) DOT ~ 763 390W DALLAS OENTON SH 114 0353-02 053 0 0 2001 1 $0 $1 800.000 DALLAS ~ SH 34 0173 04-025 0 9 2 $0 $6.129. 000 $3.200.000 ~xas Department of TransportatiOn 1998 UNIFIED TRANSPORTATION PROGRAM EXHIBIT J CATEGORY 8B STATE FARM TO MARKET ROAD SYSTEM EXPANSION PROGRAM UNIFIED TRANSPORTATION PROGRAM CATEGORY 8B - FARM TO MARKET ROAD EXPANSIONS CAT 8B CAT 8B CAT 8B CAT 8B CAT 8B CAT 8B DISTRICTS FY 1998 FY 1999 FY 2000 FY 2001 PRIORITY2 TOTAL ABILENE $0 $0 $0 $0 $9,711,668 $9.711,668 AMARILLO $0 $0 $0 $0 $0 $0 ATLANTA $1.115,000 $3,030,100 $0 $0 $6,200.000 $10,345,100 AUSTIN $0 $3,939,840 $0 $0 $0 $3.939,840 BEAUMONT $0 $0 $0 $0 $11,000,000 $11,000.000 BROV~NWOOD $0 $0 $0 $500.000 $1,996,000 $2,496,000 BRYAN $0 $0 $0 $0 $0 $0 CHILDRESS $0 $0 $0 $850,000 $0 $850,000 CORPUS CHRISTI $0 $821.000 $0 $0 $0 $821,000 DALLAS $1,837.000 $0 $0 $6,719,309 $1,151,146 $9.707,455 EL PASO $0 $0 $0 $0 $13,000,000 $13.000,000 FORT WORTH $0 $0 $0 $225,000 $0 $225,000 HOUSTON $0 $13,616.779 $0 $0 $0 $13,616,779 LAREDO $0 $0 $0 $0 $0 $0 LUBBOCK $0 $0 $5.250.000 $0 $0 $5.250,000 LUFKIN $2,203.300 $1,870,000 $0 $4,030,000 $2,700,000 $10,803,300 ODESSA $0 $0 $0 $0 $0 $0 PARIS $0 $110,000 $0 $0 $0 $110,000 PHARR $0 $0 $6,215,294 $0 $3,787.700 $10,002,994 SAN ANGELO $0 $0 $0 $0 $0 $0 SAN ANTONIO $0 $500,000 $0 $0 $1.007,000 $1,507,000 TYLER $0 $10,890.000 $3.940,000 $0 $9,000,000 $23,830,000 WACO $8,391,845 $0 $0 $0 $0 $8,391,845 WICHITA FALLS $0 $0 $0 $0 $0 $0 YOAKUM $0 $0 $0 $1,000,000 $0 $1,000,000 TOTAL $13,547,145 $34,777.719 $15,405.294 $13.324.309 $59,553,514 $136,607.981 Department of Transportation 1998 UNIFIED TRANSPORTATION PROGRAM EXHIBIT K CATEGORY 12 STRATEGIC PRIORITY PROGRAM UNIFIED TRANSPORTATION PROGRAM CATEGORY 12 - STRATEGIC PRIORITY PROGRAM CAT 12 CAT 12 CAT 12 CAT 12 CAT 12 CAT 12 DISTRICTS FY 1998 FY 1999 FY 2000 FY 2001 PRIORITY 2 TOTAL ABILENE $0 $0 $0 $0 $0 SO AMARILLO $0 $0 $300.000 $2,800,000 $0 $3.100,000 ATLANTA $0 $0 $0 $0 $0 S0 AUSTIN $0 $0 $0 $5,400.000 $0 $5,400.000 BEAUMONT $0 $0 $13,000,000 $0 $0 $13,000,000 BROWNWOOD $0 $0 $790,000 $0 $0 $790,000 BRYAN $0 $0 $0 $0 $0 $0 CHILDRESS $0 $0 $0 $0 $0 $0 CORPUS CHRISTI $0 $0 $0 $6,100.000 $0 $6,100,000 DALLAS $56,884,498 $4,367.500 $76,300.000 $13,500,000 $0 $151,051,998 EL PASO $0 $23,000,000 $0 $3.800,000 $0 $26,800,000 FORT WORTH $33,918.088 $27.337,700 $17,808,000 $2,320,000 $0 $81,383,788 HOUSTON $42,205,681 $40,850,000 $82,871,000 $34,435.600 $0 $200,362,281 LAREDO $0 $0 $0 $0 $0 $0 LUBBOCK $5,100.000 $0 $0 $0 $0 $5,100.000 LUFKIN $0 $0 $0 $0 $0 50 ODESSA $0 $0 $0 $0 $0 $0 PARIS $7,633,376 $0 $0 $0 $0 $7,633,376 PHARR $0 $0 $0 $20,000.000 $0 $20.000,000 SAN ANGELO $0 $4,640.000 $1,900,000 $5,000.000 $0 $11,540,000 SAN ANTONIO $0 $0 $0 $0 $0 $0 TYLER $8,340,000 $0 $0 $0 $0 $8,340,000 WACO $13,205,925 $0 $0 $0 $0 $13,205,925 WICHITA FALLS $0 $6,400.000 $0 $0 $0 $6,400,000 YOAKUM $0 $0 $0 $4,200,000 $0 $4,200.000 TOTAL $167.287.568 $106,595,200 $192,969,000 $97,555,600 $0 $564.407,368 DALLAS DALLAS IR 3SE 0442-02-087 4 8 2000 I $0 $61ZO0.O00 $1 SO0 000 S61 200 000 LIMITS FROI4 NEAR PA$~KERV)LLE RD TO IH 20 EXISI FACILITY 4'F PROP FACILITY 6'F PROJ DESCR WIDEN FR 4 TO 6 LNG & 4 TO 8 LNS & 4 TO lO LNS) NOISE WALL DAttAS COLLIN SM 289 0091-05-034 0 5 2001 1 $0 $6.000000 $1 000.000 s6000 000 LIMITS FR{]~4 Al PLANO PKWY lO EXIST FACILITY 6'D PROP FACILITY 6°D PROJ DESCR CONST GP~q~)E SEPARATION (6 LN LI~B~ D]VIOED) OALLAS DALLAS SP 408 3000 01.006 4 3 2001 I $0 $l 500.000 $50 000 $7 500 000 LINITS FRO~ LP 12 TO IH 20 EXIST FAC[L)TY 4FR PROP FAC[LIlY 6*F PROJ DESER : WIDEN EX]STING 4 LA~ES TO 6 LA~ES Department of Transportation 1998 UNIFIED TRANSPORTATION PROGRAM EXHIBIT N CATEGORY 17 PRINCIPAL ARTERIAL STREET SYSTEM (PASS) UNIFIED TRANSPORTATION PROGRAM CATEGORY 1'7 - PRINCIPAL ARTERIAL STREET SYSTEM (PASS) CAT 17 CAT 17 CAT 17 CAT 17 CAT 17 CAT 17 DISTRICTS FY 1998 FY 1999 FY 2000 FY 2001 PRIORITY 2 TOTAL ABILENE $0 $0 $0 $0 $0 $0 AMARILLO $0 50 $0 $0 $0 $0 ATLANTA 50 $0 $0 $0 $0 $0 AUSTIN $0 $5.113,000 $0 $0 $5,000,000 $10,113,000 BEAUMONT $0 $0 $0 $0 $0 $0 BROWNWOOD $0 $0 $0 $0 $0 $0 BRYAN $0 $0 $0 $0 $0- $0 CHILDRESS 50 $0 $0 $0 $0 $0 CORPUS CHRISTI $0 $0 $1,083,073 $0 $0 $1,083,073 DALLAS $10.848,358 $8,700,000 $8,000.000 $0 $92,324,301 $119,872,659 EL PASO $0 $2.128,000 $0 $5.320,766 $10.652,720 $18,101,486 FORT WORTH $0 $0 $15.114,916 $6,302,300 $2,155,950 $23,573.166' HOUSTON $7,200.000 $7,320,000 $3,593,000 $2.778.000 $71,094,360 $91,985,360 LAREDO 50 $0 $0 $0 $0 $0 LUBBOCK 50 $0 $0 $0 $0 $0 LUFKIN $0 $0 $0 $0 $0 $0 ODESSA $0 $0 $0 $0 $0 $0 PARIS $0 $0 $0 $0 $0 $0 PHARR $0 $0 $0 $0 $0 $0 SAN ANGELO $0 $0 $0 $0 $0 $0 SAN ANTONIO $930,900 $0 $0 $0 $0 5930,900 TYLER $0 $0 $0 $0 $0 $0 WACO $0 $0 $0 $0 $0 $0 WlCHITA FALLS $0 $0 $0 $0 $0 $0 YOAKUM $0 $0 $0 $0 $0 $0 TOTAL $18.979.258 $23,261,000 $27,790.989 $14.401,066 $181,227,331 $265,659,644 $)OO 000 $6 356 358 DA~ LAS DALLAS ~q 8075-18-005 0 1 19~cJ 1 SD $8 700 000 $600 000 $8,700 DO0 DALLAS DALL.a~ ~ 80S0-18-027 3 9 2 %0 $13 400000 $1000000 $13400 000 LIHITS FRO'I IN G.q.~D PRAIRE & IRVING ON BELT LINE TO ROAD FRC~ IH 30 TO ROCK ISLA.ND ROAD EXIST FACILITY 4*D PRO(> F~4]ILITY: 6*D PRO.) D('SCR REC(]NSTRLi(T EXISTING 4-LANE DIVIDED RL~.AL ROAD&AY lO .................................................................................... ISO0 000 40 40 $6.139 000 $6.139000 DALLAS DALLAS ~t~ B245-18 001 0 6 2 $200000 $2 102 678 $413 $00 s2 302 678 DALLAS {)ALLAS SH 310 0092 02.1D4 0 I 2 48 000 000 $50 000 SB 000 000 LIMITS FR(~I 0VERTON RD TO LP 12 O~J_~ DJkLLA.5 SH 342 0C~8 01 039 0 8 Z $0 $16300.000 $630 000 416.300.000 sO DALLAS DALLAS SH 352 0197-01-010 0 7 2 S4.OO0.000 $1.500.0OO S4,0OO.000 LIMITS FROM: SECO440 AVE TO:I~Si(ELL A~ [N OALLAS DALLAS DALLAS SP 244 0353-05 083 0 1 2 4320000 48 260 00O 42880.000 $8.580000 0]ST TOTAL $3 820000 IS PROJEL'IS $119.872,659 $13 276,000 $123692,659 cas Department of Transportation 1998 UNIFieD TRANSPORTATION PROGRAM EXHIBIT 0 PROJECTS DELAYED FROM PREVIOUS FISCAL YEAR TO RETAIN PRIORITY I AUTHORIZATION UNIFIED TRANSPORTATION PROGRAM PROJECTS DELAYED FROM PREVIOUS FISCAL YEARS TO RETAIN PRIORITY 1 AUTHORIZATION PRIORITY 1 DISTRICTS FY 1995 FY 1996 FY 1997 TOTAL ABILENE $0 $0 $379,785 $379,785 AMARILLO $0 $0 $3,203,495 $3,203,495 ATLANTA $0 $923,227 $6,199,041 $7,122,268 AUSTIN $0 $0 $14,605,751 $14,605,751 BEAUMONT $0 $0 $11,153,113 $11,153,113 BROWNWOOD $0 $0 $233,008 $233,008 BRYAN $0 $9,300 $753,272 $762,572 CHILDRESS $0 $0 $100,000 $100,000 CORPUS CHRISTI $0 $0 $7,140,000 $7,140,000 DALLAS $0 $0 $48,073,892 $48,073,892 EL PASO $0 $0 $12,179,953 $12,179,953 FORT WORTH $0 $5,742,868 $15,721,890 $21,464,758 HOUSTON $0 $921,454 $28,821,897 $29,743,351 LAREDO $0 $0 $10,224,112 $10,224,112 LUBBOCK $200,000 $0 $0 $200,000 LUFKIN $0 $189,700 $19,523,434 $19,713,134 ODESSA $0 $89,260 $0 $89,260 PARIS $0 $0 $2,200,111 $2,200,111 PHARR $0 $0 $31,277,966 $31,277,966 SAN ANGELO $0 $0 $2,005,133 $2,O05,133 SAN ANTONIO $0 $0 $11,248,410 $11,248,410 TYLER $0 $0 $16,430,114 $16,430,114 WACO $2,992,480 $686,802 $6,101,112 $9,780,394 WICHITA FALLS $0 $1,495,683 $0 $1,495,683 YOAKUM $0 $0 $90,010 $90,010 TOTAL $3,192,480 $10,058,294 $247,665,499 $260,916,273 $90 000 ~38 220 CAl~G~qY 68 50 %38 220 EXIST FACILITY: 1CR PRO~. FACILITY 2CR pROJ DESCR REPLACE BRIgGE AND APPI~OAFJ4ES DALLAS COLLIN US 380 0135.03-037 17 1997 1 $0 $6 990. 029 CAIt~DRY 38 $0 $6.990029 LIRIT5 FI~'4 0 2 HILE EAST OF SP RR lO WEST OF Fti 1827 EXIST FACILITY: 2fR PRO~ FACILITY: 4*0 PROJ OESCR : CONSTRUfT 4 LANE RURAL ~ 6 LANE DIVIDED URBAN DALLAS COLLIN US 380 0~35-03-031 06 1997 ! $0 $3.454.449 CAltGQ~Y: 12 $500.000 $3454449