Loading...
ST9904-CS 970611North Central Texas Council Of Governments The Honorable Tom Morton Mayor City of Coppell P.O. Box 478 Coppell, TX 75019 June 11,1997 Dear Mayor Morton: In late April, you requested projected traffic volumes near the intersection of S.H. 121 and F.M. 2499. The S.H. 114/S.H. 121 Major Investment Study (MIS) was just then getting underway and we informed you that upon completion of the model validation we would be able to send you the volumes. Thank you for your patience. We have just recently completed the travel model validation for the year 1995 and are comfortable with the results. Our horizon, or forecast, year is 2020. Using the regionally approved population and employment forecasts and the Dallas-Fort Worth Regional Travel Model, we can forecast traffic for the year 2020. These demographics are under current review to ensure the inclusion of recently initiated retail development in the area. All affected cities will be invited to participate in this review. I have enclosed a small map of the Coppell area with 2020 daily traffic volumes (in thousands) posted on each roadway segment. The roadway network assumption underlying these projections is the Mobility 2020 Plan which was approved in December, 1996. Additional work continues on the MIS. Alternatives being tested in the Grapevine corridor of S.H. 114 and SH. 121 have the potential for affecting projected traffic volumes in your area of interest. Please let us know what additional information you would like us to provide. Thank you for your continued commitment to transportation in the DFW area. Sincerely, Michael W. Copeland Principal Transportation Planner MWC:sk Enclosure cc: Gustavo Baez, NCTCOG 1996-97 UPWP Element 5.03 Project File 616 Six Flags Drive, Centerpoint Two I~ O. Box 5888, Arlington, Texas 76005-5888 (817) 640-3300 FAX: 817-640-7806 ~recy~led paper