ST9904-CS 970110 TxDC S.H. 121 TASK FORCE R ORT
Note: Section numbers in narrative below correspond to numbers on
drawings.
January 10, 1997
S.H. 121 CAPACITY IMPROVRM~NTS (STAGE I)
A. Section 1:
Tarrant/Dallas County Line to North of
Denton Creek (4-lane divided highway
with 2-lane frontage roads)
B. Section 2:
Completed -- July 1992
North of Denton Creek to I.H.
lane divided highway)
(CSJ 0364-03-078 & 0364-03-077)
35E
Completed -- November 1993
Section 3: I.H. 35E to East of
divided highway)
F.M. 1171 (6-lane
Section
Completed -- June 1991
East of F.M. 1171 to East of the
Fork of the Trinity River (bridges)
Elm
Section 5:
Completed -- July 1988
East of the Elm Fork of the Trinity
River to West of the Burlington Northern
Railroad (4-lane divided highway)
(CSJ 0364-03-042)
Completed -- February 2, 1994.
Crider Road Project (0364-03-079)
Completed -- September 1995
Section 6: West of the Burlington Northern Railroad
to East of Legacy (4-lane divided
highway)
(CSJ 0364-03-043)
Completed -- March 29, 1994
II.
Section 7:
East of Legacy to East S.H. 289
divided)(including the "S.H.
intersection)
(CSJ 0364-04-028 & 0364-04-032)
(4-lane
289
Completed -- May 3, 1995
Section 8:
S.H. 289 to U.S. 75 (~-lane divided)
(CSJ 0364-04-022)
The Dallas District requested that this project be
elevated to Priority 2 authority in the 1996
Project Development Plan (PDP) Update as well as
the 1997 Unified Transportation Program (UTP). The
project was not selected by the Commission under
either of these programs. Therefore, Jay Nelson,
P.E. (Dallas District Engineer) has programmed
this project using Category 11 which is a 10 year
programming authority given to the District
Engineers to develop district discretionary
projects. This allows the Dallas District to
proceed with plan development and right-of-way
acquisition.
Work on the Draft 1998 UTP is currently underway.
The TxDOT districts are updating project data on
the mainframe for all NHS and candidate NHS
projects. Austin will re-rank these projects on
February 3, 1997.
3. This project is still a candidate for Category 3A
-- National Highway System Mobility.
S.E. 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I)
(See attached for right of way status)
A. Section 9:
North of Denton Creek to Denton TaD Road
(3-lane frontage roads)
(CSJ 3547-03-002 & 3547-02-003)
This project let on July 10, 1996 and J.D. Abrams,
Inc. Was the low bidder with a bid of
$14,581,681.91. The Texas Transportation
Commission awarded the contract at their meeting
in late July.
°
Construction began on October 7, 1996 and is 2.5%
complete. Time is currently suspended due to
utility and personal property relocation problems.
Construction will take 26 months to complete once
it resumes (probably within the next month).
Section
Denton Tap Road to .ke vista (3-lane
frontage roads)
Completed -- 1988
Section 11:
Lake Vista to I.H.
roads)
(CSJ 3547-01-002)
35E (3-lane frontage
Opened to traffic on June 1, 1996.
Section 12:
I.H. 35E to Existing S.H. 121 Near F.M.
544 (3-lane frontage roads, freeway
constructed where frontage roads are not
proposed)
(CSJ 3547-01-e04)
This project let on January 9, 1996 and Brown &
Root, Inc. was the low bidder with a bid of '
$45,502,101.11. The Texas Transportation
Commission awarded the contract at their January
25, 1996 meeting.
The pre-construction meeting was held on March 7,
1996 and construction began on April 29, 1996.
Construction will take 36 months.
Construction is 18% complete and the anticipated
completion date is May 1999.
III. S.H. 121 FREEWAY IMPROVEMENTS (STAGE II)
A. Section 13:
Tarrant County Line to North of
Creek (conversion to freeway)
(CSJ 0364-02-017 & 0364-03-064)
Denton
The Dallas County portion of this project is
currently listed as a Long Range Project (LRP).
The Denton County portion is not. The TxDOT Dallas
District has requested LRP status for the Denton
County portion and is awaiting Austin's reply.
Candidate for Category 3A -- National Highway
System Mobility.
3. Estimated Construction Costs:
CSJ County From To Cost
0364-02-017 Dallas Tarrant CL Denton CL $16,000,000
0364-03-064 Denton Dallas CL Denton Crk $ 3,000,000
Total $19,000,000
3
Section 14: Existing S.H. 121 Near Denton Creek to
Existing S.H. 121 Near F.M. 544
(Lewisville Bypass)(Mainlanes)
(CSJ 3547-03-003, 3547-02-004, &
3547-01-005)
1. This project was not selected for Priority 2
authority by the Commission in the 1997 UTP. The
Dallas District has requested LRP status for this
project and is awaiting Austin's reply.
2. Candidate for Category 3A -- National Highway
System Mobility.
3. Estimated Construction Costs:
CSJ County From To Cost
3547-03-003 Denton SH 121 Dallas CL $ 5,500,000
3547-02-004 Dallas Denton CL Denton CL $12,600,000
3547-01-005 Denton Dallas CL FM 544 $73,500,000
Total $91,600,000
C. Section 15:
F.M. 544 to U.S. 75
(Mainlanes)
(CSJ 0364-04-023, 0364-03-066,
0364-03-067)
1. The Dallas District has requested LRP status for
this project and is awaiting Austin's reply.
2. Candidate for Category 4E -- STP Urban Mobility or
Category 3A -- NHS Mobility.
3. Estimated Construction Costs:
CSJ County From To Cost
0364-04-023 Collin Denton CL SH 289 $ 6,656,163
0364-03-066 Denton FM 544 FM 423 $ 5,209,593
0364-03-067 Denton FM 423 Collin CL $11,832,535
Total $23,698,291
4
RIGHT-OF-WAY STATUS S.H. 121 BYPASS
January 10~ 1997
S.H.121 ByDass:
(Section 9)
Outstanding Issues:
From Denton Creek
To Denton Tap Road
Utilities.to be relocated:
a.) Lone Star Gas Company (January 1997)
b.) GTE {January 1997)
c.) Denton County Electric Coop (January 1997)
d.) TU Electric (February 1997)
II.
S.H. 121 B~ass: Fro~ Denton Tap Road
(Sections 10, 11 To The Elm Fork of the Trinity River
& Part of 12) (including S.H. 121 -- I.H. 35E
Interchange)
Outstanding Issues:
None
III.
S.H. 121 By~ass: From The Elm Fork of the
(Part of Section 12) Trinity River
To F.M. 423
Outstanding Issues:
1. Relocation of Standridge Drive None
5
FY 1998 - 2000 STIP
De vel opment/AI~Proval
Timelines
Action
Commission adopts FY 1997 UTP. f~
Draft TIPs due to TPP by close of
business.
TPP finishes review of Draft TIPs and
returns comments.
:inalized TiPs, Financial Plans and
Conformity Analysis due to TPP by
close of business.
)P finalized STIP and submits to
Commission for approval.
:ommission adopts STIP.
STIP to FHWA/FTA for review __
-IWA/FTA approval received
Date
September 26, 1996
January 2, 1997
February 3, 1997
.May 1, 1997
1, 1997
July 31,1997
ust 29, 1997
CHANGES THAT J~ A TIP/STIP REVISION
The folloWing Is a list of changes that require a TIP/STIP revision:
1; Adding Federally Funded Projects.
2, Adding Regionally Significant State Funded Projects (NON-A~FAINMENT AREAS ONLY)
3. Change in the project scope of work.
4~ Change in federal funding categories, I.e., STP, Bridge
5. Change In project limits.
6. :if the MPO's ~ojec! selection procedures do not provide for selecting projects in the second
or third years, a change in TIP Year would require a revislon.
7. Changes In Transit Grantees for FTA Section 5310 projects.
CHANGES THAT j~j~[j~~ A TIP/STIP REVISION
1. Change in CSJ
2. Change in cost estimate NOT caused by a change in limits or scope of work.
3- Change in Letting Date.
4. Change from one STATE funded category to another STATE funded category.
5. Change in project limits for a STATE funded project.
6. Change in TiP Year for a STATE funded project,
7. Change In scope of work for a STATE funded proJecl.
uJ
DNLLLg~ ZO~O~d
Z
O31JIIN3(]I 1.03f'Ol:id OIJIO3dS
O31JII. N3OI O33N
O~
~0
zO~o
0~0~
O0 ~O~zO
)000~
DATE:
RE:
January 10, 1997
TXDOT PARCEL UPDATE - COURT SETTINGS
Parcel # Name Date
14 Staton N/A
16
18
19 A
19B i
21
27
Adams
Payne
Jackson
Jackson
Payne
Beal
N/A
Pending
Pending
1/17
1/31
N/A
N/A
Pending
Pending
1/17
1/31
1/27
2/17
. SECTION 9 ~
Parcel Status
Smtus
No setting. Trying to get case set.
Our attorney is trying to get to mediation.
N/A
Pre-trial
Pre-trial
Hearing on various motions
Heating on Motion for Summary Judgment
N/A
N/A
Pre-trial
Pre-trial
Hearing on various motions
Heating on Motion for Summary Judgment
Pre-trial certificate due
Jury trial set.
Court
N/A
CV-95-555, Probate Court
CV-96-556, Probate Court
96-01415-C, CC@L #3
CA 95-6115, 162nd Dist. Ct.
CA 95-3124B 44th Dist. Ct.
CV-95-555, Probate Court
CV-96-556, Probate Court
96-01415-C, CC@L #3
County
N/A
Denton County
Denton County
Dallas County
Dallas County
Dallas County
Denton County
Denton County
Dallas County
Doc ID SCOTR-259286
334%0001
Texas New Mexico Power
Contact: Roger Dickens (972/436-3561)
Contractor:
Action:
Date(s):
Waiting for GTE to clear old poles. Present at site on 1/3. Will have work crew remove old poles during week of 1/13 if GTE off.
Lone Star Gas
Contact: Bruce (972/317-5152)
Contractor: B & W Backhoe.
Action:
Lone Star and J. D. Abrams have reached an agreement on staging on north side by Ace Lane. Gas contractor will be on site for
Staton (SH 121 Cafe) during week of 1/13. Directional bore and will take only 2-3 days.
(Last action per 1/3/97 memo: Lone Star Gas still has line relocations to complete. Three weeks ago when they were contacted,
Lone Star could not find a contractor to relocate the lines. The lines involved are a six inch lines south of the right-of-way running
from the SH 121 Cafe to the trailer park. (The remainder of the line on the southern boundary evidently has been relocated.) There
is also a four inch line that runs up the western boundary of Ace Lane. No private contractor has attempted relocation of this line
to date.)
Doe LB 5COTR-259286