ST9904-CS 961108 TxDOT S.H. 121 TASK FORCE REPORT Note: Section numbers in narrative below correspond drawings. November 8, 1996 to numbers on 121 CAPACITY IMPROVRW~.NTS (STAGE I) Section 1: Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed - July 1992 B. Section 2: North of Denton Creek to I.H. 35E (4/6 lane divided highway) (CSJ 0364-03-078 & 0364-03-077) Completed November 1993 C. Section 3: I.H. 35E to East of F.M. 1171 (6-lane divided highway) D. Section E. Section 5: Completed - June 1991 East of F.M. 1171 to East of the Elm Fork of the Trinity River (bridges) Completed - July 1988 East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed - February 2, 1994. Crider Road Project (0364-03-079) Completed September 1995 Section 6: West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway) (CSJ 0364-03-043) Completed - March 29, 1994 II. Section 7: East of Legacy to East S.H. 289 divided)(including the S.H. intersection) (CSJ 0364-04-028 & 0364-04-032) (4-lane 289 Completed - May 3, 1995 Section 8: S.H. 289 to U.S. 75 (4-lane divided) (CSJ 0364-04-022) The Dallas District requested that this project be elevated to Priority 2 authority in the 1996 PDP Update. The project was not selected by the Commission. The Draft 1997 Unified Transportation Program (UTP) was presented to the Texas Transportation Commission at their August meeting. The Commission deferred consideration of the UTP until (most likely)- their September meeting. Upon review of the Draft 1997 UTP, the Dallas District discovered that this S.H. 121 project was not selected as a Priority 2 project. Therefore, Jay Nelson, P.E. (Dallas District Engineer) has decided to program this project using Category 11 which is a 10 year programming authority given to the District Engineers to develop district discretionary projects. This will allow the Dallas District to proceed with plan development and right~of-way acquisition. This project is still a candidate for Category 3A - National Highway System Mobility. 3. Estimated Construction Cost: $19,700,000. S.H. 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I) (See attached for right of way status) A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage roads) (CSJ 3547-03-002 & 3547-02-003) This project let on July 10, 1996 and J.D. Abrams, Inc. Was the low bidder with a bid of $14,581,681.91. The Texas Transportation Commission awarded the contract at their meeting in late July. The pre-construction meeting was held on September 25, 1996 and construction began on October 7, 1996. Time is currently suspended due to utility and personal property relocation problems. Construction will take 26 months to complete once it resumes. - .......... 2 Section 10: Denton Tap Road to Lake Vista (3-lane frontage roads) Completed - 1988 Section 11: Lake vista to I.H. roads) (CSJ 3547-01-002) 35E (3-lane frontage Opened to traffic on June 1, 1996. De Section 12: I.H. 35E to Existing S.H. 121 Near F.M. 544 (3-lane frontage roads, freeway constructed where frontage roads are not proposed) (CSJ 3547-01-004) This project let on January 9, 1996 and Brown & Root, Inc. was the low bidder with a bid of $45,502,101.11. The Texas Transportation Commission awarded the contract at their January 25, 1996 meeting. 2. The pre-construction meeting was held on March 7, 1996 and construction began on April 29, 1996. Construction will take 36 months. 3. Construction is ~ complete and the anticipated completion date is May 1999. III. S.H. 121 FREEWAY IMPROVEMENTS (STAGE II) A. Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway) (CSJ 0364-02-017 & 0364-03-064) The Dallas County portion of this project is currently listed as a Long Range Project (LRP). The Denton County portion is not. The TxDOT Dallas District is requesting LRP status for the Denton County portion. o Candidate for Category 3A - National Highway System Mobility. 3. Estimated Construction Costs: CSJ County From TO Cost 0364-02-017 Dallas Tarrant CL Denton CL $16,000,000 0364-03-064 Denton Dallas CL Denton Crk $ 3,000,000 Total $19,000,000 Section 14: Existing S.H. 121 Near Denton Creek to Existing S.H. 121 Near F.M. 544 (Lewisville Bypass)(Mainlanes) (CSJ 3547-03-003, 3547-02-004, & 3547-01-005) This project was not selected for Priority 2 authority by the Commission in the 1996 PDP. The Dallas District is requesting LRP status for this project. o Candidate for Category 3A - National Highway System Mobility. 3. Estimated Construction Costs: CSJ County Fro~ To Cost 3547-03-003 Denton SH 121 Dallas CL $ 5,500,000 3547-02-004 Dallas Denton CL Denton CL $12,600,000 3547-01-005 Denton Dallas CL FM 544 $73,500,000 Total $91,600,000 C. Section 15: F.M. 544 to U.S. 75 (Mainlanes) (CSJ 0364-04-023, 0364-03-066, & 0364-03-067) 1. The Dallas District is requesting LRP status for this project. 2. Candidate for Category 4E STP Urban Mobility or Category 3A - NHS Mobility. 3. Estimated Construction Costs: CSJ County From TO Cost 0364-04-023 Collin Denton CL SH 289 $ 6,656,163 0364-03-066 Denton FM 544 FM 423 $ 5,209,593 0364-03-067 Denton FM 423 Collin CL $11,832,535 Total $23,698,291 4 RIGHT-OF-WAY STATUS S.H. 121 BYPASS November 8. 199~ S.H.121 Bypass: (Section 9) From Denton Creek To Denton Tap Road Outstanding Issues: 1. Parcel Status: o a.) Acquired b.) One Easement to be Donated Utilities to be relocated: II. a.) Lone Star Gas Company (12-96) b.) Brazos Electrical Co-op (12-96) c.) Texas-New Mexico Power (11-96) d.) TU Electric (12-96) S.H. 121 By~ass: From Denton TaD Road (Sections 10, 11 & Part of 12) Outstanding Issues: None III. S.H. 121 Bypass: (Part of Section 12) To The Elm Fork of the Trinity River (including S.H. 121 - I.H. 35E Interchange) Outstanding Issues: From The Elm Fork of the Trinity River TO F.M. 423 1. Relocation of Standridge Drive Property swap in final stages. Denton County Reclamation and Road District Area Near Elm- Fork of the Trinity River. a.) 17 parcels have been identified. 1.) Donations to date: 5 2.) Donations in review by owners: 12 Total 17 3. Utilities to be Relocated a.) Denton County Electric Coop. Relocation of Personal Property a.) None required. 4 o 5