Loading...
ST9904-CS 960712 TxDOT S.H. 121 TASK FORCE REPORT Note: Section numbers in narrative below correspond to numbers on drawings · July 12, 1996 S,H. 121 CAPACITY IMPROVEMENTS (STAGE I) A. Section 1: Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) B. Section 2: Completed - July 1992 North of Denton Creek to I.H. lane divided highway) (CSJ 0364-03-078 & 0364-03-077) 35E (4/6 Ce Completed - November 1993 Section 3: I.H. 35E to East of divided highway) F.M. 1171 (6-lane Section 4: Completed June 1991 East of F.M. 1171 to East of the Elm Fork of the Trinity River (bridges) Section 5: Completed - July 1988 East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed - February 2, 1994. Crider Road Project (0364-03-079) Completed - September 1995 Section 6: West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway) (CSJ 0364-03-043) Completed March 29, 1994 II. Section 7: East of Legacy to East S.H. 289 divided)(including the S.N. intersection) (CSJ 0364-04-028 & 0364-04-032) Completed - May 3, 1995 Section 8: 1. (4-lane 289 S.H. 289 to U.S. 75 (4-lane divided) (CSJ 0364-04-022) The Dallas District requested that this project be elevated to Priority 2 authority in the 1996 PDP Update. The project was not selected by the Commission. The 1997 PDP Update for mobility projects is currently underway. Results expected in August. Candidate for Category 3A - National Highway System Mobility. 3. Estimated Construction Cost: $19,700,000. ~,H, 121 (SPUR 553) LEWISVTLLR BYPASS (See attached for right of way status) A. Section 9: (STAGE I) North of Denton Creek to Denton Tap Road (3-lane frontage roads) (CSJ 3547-03-002 & 3547-02-003) This project let on July 10, 1996 and J.D. Abrams, Inc. Was the low bidder with a bid of $14,581,681.91. The Texas Transportation Commission i~ expected to award the contract at their meeting in late July. \~e~ 2. Construction will probably ~o~-~' 1, 1996 and take 26 months ~-~< B. Section 10: Denton Tap Road frontage roads) begin around Sept~ember ~ to complete. to Lake vista (3-lane Completed - 1988 Section 11: Lake Vista to I.H. roads) (CSJ 3547-01-002) 35E (3-lane frontage This project let on Company was awarded $10,165,798. April 13, 1994. H.B. Zachry the contract with a bid of 2. Construction began on July 6, 1994. 3. Project is complete except 2 for establishing grass III. $.H. A. growth. 4. Opened to traffic on June 1, 19_~96, Section 12: I.H. 35E to Existing S.H. 121 Near F.M. 544 (3-lane frontage roads, freeway constructed where frontage roads are not proposed) (CSJ 3547-01-004) 1. This project let on January 9, ~ and Drown & o_~, Inc. was the low bidder with a bid of __~,502,101.1~1. The Texas Transportation Commission awarded the contract at their January 25, 1996 meeting. 2. The pre-construction meeting was held on March 7, 1996 and construction be~a~ on April 29, 1996. Construction will take 36 months. 3. Construction is 8% complete. 121 FREEWAY IMPROVEMENTS (STAGE II} Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway) (CSJ 0364-02-017 & 0364-03-064) 1. The Dallas County portion of this project is currently listed as a Long Range Project (LRP) in the 1996 PDP. The Denton County portion is not. The TxDOT Dallas District will request LRP status for the Denton County portion in the 1997 PDP update. 2. Candidate for Category 3A - National Highway System Mobility. 3. Estimated Construction Costs: CSJ ~ From 0364-02-017: Dallas Tarrant CL 9364-03-064: ~ ~ TO Cost Denton CL $16,000,000 Total: $19,000,000 B. Section 14: Existing S.H. 121 Near Denton Creek to Existing S.H. 121 Near F.M. 544 (Lewisville Bypass)(Mainlanes) (CSJ 3547-03-003, 3547-02-004, & 3547-01-005) This project was not selected for Priority 2 authority by the Commission in the 1996 PDP. The 1997 PDP Update is currently underway. Results expected in August. 3 o Candidate for Category 3A - National Highway System Mobility. 3. Estimated Construction Costs: CSJ County From To Cost 3547-03-003: Denton SH 121 Dallas CL $ 5,500,000 3547-02-004: Dallas Denton CL Denton CL $12,600,000 3547-01-005: Denton Dallas CL FM 544 ~73o500,000 Total: $91,600,000 C. Section 15: F.M. 544 to U.S. (Mainlanes) (CSJ 0364-04-023, 0364-03-067) 75 0364-03-066, 1. On "hold" status. o Candidate for Category 4E STP Urban Mobility or Category 3A - N-HS Mobility. The Dallas District requested in the 1995 PDP update that authority be given to allow for State participation in right-of-way acquisition up to $70 million on the section of S.H. 121 between S.H. 289 and U.S. 75. This was not included in the PDP update; therefore, to show a commitment to the project, local governments are obtaining right-of- way donations to convince the TxDOT Commission to fund the remaining right-of-way. 4. Estimated Construction Costs: CSJ County From TO 0364-04-023: Collin Denton CL SH 289 0364-03-066: Denton FM 544 FM 423 0364-03-067: Denton FM 423 Collin CL Total: Cost $ 6,656,163 $ 5,209,593 $23,698,291 RIGHT-OF-WAY STATUS S.H. 121 BYPASS July 12. 1996 S.H.121 Bypass: (Section 9) From Denton Creek To Denton TaD Road Outstanding Issues: 1. Parcel Status: a.) Acquired Parcels b.) Possession Pending Warrant Deposit Total 16 17 c.) Estimated Possession Date: July 1996 2. Utilities to be relocated: a.) Lone Star Gas Company C.) GTE b.) Denton County Electrical Co-op (September 1996) (September 1996)* (July 1996) * This date is contingent on possession of Parcel 27. 3. Personal Property to be relocated: a.) Estimated clearance: August 1996 II. S.H. 121 By~ass: (Sections 10, 11 & Part of 12) Outstanding Issues: From Denton Tap Road To The Elm Fork of the Trinity River (including S.H. 121 - I.H. 35E Interchange) None III. S.H. 121 Bypass: (Part of Section 12) Outstanding Issues: 1. Relocation of a.) From The Elm Fork of the Trinity River TO F.M. 423 b.) Standridge Drive Centex Parcel - Closing date 8-15-96. E-System Parcel Closing date 8-15-96. o Denton Fork of the Trinity River. County Reclamation and Road District Area a.) 17 Darcels have been identified. 1.) Donations to date: 5 2.) Donations in review by owners: 11 3.) Owner to be contacted: ~ Total 17 ) Possession: 09-01-96 3.) Utilities to be Relocated a,) GTE: August 1996 b,) Denton County Elect Coop: July 1996 c.) City of Carrollton Water & Sewer: July 1996 d.) World Communications: July 1996 e.) Lone Star Gas: June 1996 4.) Relocation of Personal ProDerty a.) None required. Near Elm-