Loading...
ST9904-CS 960308 TxDOT S.H. 121 TASK FORCE REPORT Note: Section nurmbers in narrative below correspond drawings. March 8, 1996 to numbers on 121 CAPACITY IMPROVEMENTS (STAGE I) Section 1: B. Section 2: C. Section 3: D. Section 4: E. Section 5: Fo Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed July 1992 North of Denton Creek to I.H. lane divided highway) (CSJ 0364-03-078 & 0364-03-077) 35E (4/6 Completed - November 1993 I.H. 35E to East of divided highway) F.M. 1171 (6-lane Completed - June 1991 East of F.M. 1171 to East of the Elm Fork of the Trinity River (bridges) Completed - July 1988 East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed - February 2, 1994. Crider Road Project (0364-03-079) Completed - September 1995 Section 6: West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway) (CSJ 0364-03-043) Completed - March 29, 1994 1 II. Section 7: East of Legacy to East S.H. 289 divided)(including the S.H. intersection) (CSJ 0364-04-028 & 0364-04-032) (4-lane 289 Completed - May 3, 1995 Section 8: S.H. 289 to U.S. 75 (4-lane divided) (csJ 0364-04-022) The Dallas District requested that this project be elevated to Priority 2 authority in the 1996 PDP Update. The project was not selected by the Commission. The 1997 PDP Update for mobility projects is currently underway. Results expected this summer. 2. Category 3A - National Highway System Mobility. 3. Estimated Construction Cost: $19,700,000. S.H. 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I) (See attached for right of way status) A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage roads) (CSJ 3547-03-002 & 3547-02-003) 1. Category 13 - State Funded Mobility. This project was authorized in the 1996 PDP as Approved by the Texas Transportation Commission on October 26, 1995. It has been given Priority 1 status with a 1996 scheduled year. As a result, the project has been placed in the FY 96-98 TIP for fiscal year 1996. 2. Estimated letting date is July 1996. Construction will probably begin around September 1, 1996 and take 26 months to complete. 3. Construction plans are 95% complete. 4. Estimated construction cost is $15,796,657. Section 10: Denton Tap Road to Lake vista (3-lane frontage roads) Completed 1988 Section 11: Lake Vista to I.H. roads) (CSJ 3547-01-002) 35E (3-lane frontage 1. This project let on April 13, 1994. H.B. Zachry Company was awarded the contract with a bid of $10,165,798. 2. Construction began on July 6, 1994. 3. Project is 94% complete and on schedule. 4. Estimated open to traffic - April 1996. D. Section 12: I.H. 35E to Existing S.H. 121 Near F.M. 544 (3- lane frontage roads, freeway constructed where frontage roads are not proposed) (CSJ 3547-01-004) 1. This project let on January 9, 1996 and Brown & ~!.? Root, Inc. was the low bidder with a bid of ~1~~' $45,502,101.11. The Texas Transportation Commission , awarded the contract at their January 25 1996 ,~ meeting. 2. The pre-construction meeting was held on March 7, 1996 and construction was tentatively scheduled to begin on A_p32il 15, 1996. Construction will take months. III. S,H. A. 121 FREEWAY IMPROVEMENTS (STAGE II) Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway) (CSJ 0364-02-017 & 0364-03-064) 1. The Dallas County portion of this project is currently listed as a Long Range Project (LRP) in the 1996 PDP. The Denton County portion is not. The TxDOT Dallas District will request LRP status for the Denton County portion in the 1997 PDP update. 2. Category 3A - National Highway System Mobility. Section 14: Existing S.H. 121 Near Denton Creek to Existing S.H. 121 Near F.M. 544 (Lewisville Bypass)(Mainlanes) (CSJ 3547-03-003, 3547-02-004, & 3547-01-005) This project was not selected for Priority 2 authority by the Commission in the 1996 PDP. The 1997 PDP Update is currently underway. Results expected this summer. 2. Category 3A - National Highway System Mobility. 3 3. Estimated Construction Costs: 3547-03-003: 3547-02-004: $~47-01-005: Total: $ 5,500,000 $12,600,000 $73,500,000 $91,600,000 Section 15: F.M. 544 to U.S. 75 (Mainlanes) (CSJ 0364-04-023, 0364-03-066, 0364-03-067) 1. On "hold" status. o Candidate for Category 4E STP Urban Mobility or Category 3A - NHS Mobility. The Dallas District requested in the 1995 PDP update that authority be given to allow for State participation in right-of-way acquisition up to $70 million on the section of S.H. 121 between S.H. 289 and U.S. 75. This was not included in the PDP update; therefore local governments have indicated they will prepare a formal request to secure TXDOT right-of-way funding. 4. Estimated Construction Costs: 0364-04-023: 0364-03-066: 0364-03-067: Total: $ 6,656,163 $ 5,209,593 $11,$32,535 $23,698,291 RIGHT-OF-WAY STATUS S.H. 121 BYPASS March 8, 19~ S.H.121 Bypass: (Section 9) From Denton Creek To Denton Tap Road Outstanding Issues: 1. Parcel to be acquired: a.) Right of Entry to appraise: b.) Appraisal Completed: 95% c.) Negotiation Completed: 90% d.) Parcel Status: 1.) Acquired Parcels 2.) Purchase Pending 3.) E.D. Hearings Set 4.) E.D. Hearings Filed (not set) 5.) Parcels to A.G.'s office for E.D. 6.) Parcels in TxDOT ROW Div. for E.D. 7.) Parcels in District for E.D. 8.) Parcels in Negotiation Completed 15 0 1 1 action 0 action 0 action 0 0 Total 17 e.) Three E.D. cases to date have been filed in Denton County, all others filed in Dallas C0unty~__~ f.) Estimated Possession Date: May 19967 Utilities to be relocated: a.) Lone Star Gas Company b.) Brazos Electrical Co-op (April 1996) (April 1996) 3. Personal Property to be relocated: a.) Estimated clearance: August 1996 II. S.~. 121 Bypass: (Sections 10, 11 & Part of 12) From Denton Tap Road TO The Elm Fork of the Trinity River (including S.H. 121 - I.H. 35E Interchange) Outstanding Issues: 1. Remaining parcels to be acquired: a.) Right of Entry and Possession of all Parcels. 2. Utilities to be relocated: a.) G.T.E - June 1996. III. S.H. 121 Bypass: (Part of Section 12) From The Elm Fork of the Trinity River To F.M. 423 Outstanding Issues: 1. Relocation of Standridge Drive Centex Parcel (Parcel 6 - 8018-1-79) We have met with Mr. J. S. Bilheimer, discussed the parcel, Centex will donate - Closing date 3-15-96. b.) Bright Farms Parcel (Parcel 5A - 8018-1-83) We have met with Mr. John Baxter, discussed parcel, Bright Farms will donate this parcel along with several others near SH 121 - FM 544 intersection - Closing date 3-15-96. c.) E-System Parcel (Parcel 10 ~ 8018-1-83) We have met with Mr. Bill Strange, discussed parcel E- Systems is in the process of swapping parcel for surplus tract of land near SH 121 FM. 544 intersection anticipated closing date 4-1-96. o Denton County Reclamation and Road District Area Near Elm Fork of the Trinity River. a.) 12 new parcels have been identified. 1.) Maps to Right of Way Section 12-10-95. 2.) Appraiser to be assigned. 3.) A tentative schedule for acquisition of these properties is as follows: A.) Appraisals Completed: 3-15-96 B.) Appraisal Review: 4-05-96 C.) Offers to Owners: 4-10-96 D.) Final Offers: 4-20-96 E.) Request for E.D. Action from Commission: 6-01-96 F.) E. D. Hearings: 7-01-96 to 8-15-96 G.) Possession: 9-01-96 3.) Utilities to be Relocated a.) GTE: Clear - April 1996. b.) Denton County Elect Coop: Clear - March 1996. c.) City of Carrollton Water & Sewer: Clear April 4.) Relocation of Personal Property a.) None required. 1996. From ROBERT W POPE To Ken Griffin Date 3/21/96 Time 9 13 00 PM Page 2 of 11 STATE HIGHWAY 121 TASK FORCE % ROBERT W. POPE & ASSC~IATES 4011 W. PLAN() PARKWAY SUITE PLAN(), TEXAS (214)964-8801 - I:~,.X (214)596-6547 TASK FORCE MEETING NOTES March $, 1996 PLANO. TEXAS Robert Pope opened thc mcctmg at 10:05 A.M. and asked all iii attcmhmcc to introduce themselves (see enclosed list of attendees). (}haleb Sunna, Txl)ot Dallas DistriCt I)esign Engineer presented the allached "Task I:orce I~.epo~t" Stmna noted Set'lion 9 of the Bypass (I)enton ('reek to Denton Tap Road) is on schedule fi*r a ,luly letting; conslruction is expected to start Scplcmbcr 1 alld take 26 months lo complete. Construction on Se~aion 11 is on schedule with opening fi~r traffic exq~e~ed in April. The contract tk*r Sec'lion 12 was awarded to I h'own & Root, Inc. The preconstruction conference for thc pr'qicc! was held March 7: conslruction is tentatively expected Io starl April 15.1996 and take 36 months. I)enton (~ounty (~ommissioner Sandy Jacobs asked if the schedule calls for opening any sections of Ibc roadway prior lo completion of thc entire prqicct. Buz Elsom. TxDOT Area Engineer fiw I)enton County replied that Txl)() I' has prepared a sequencing plan fi*r the con~;truclion; the contractor can usc that phm or prepare Ihcir own. Thc Brown & Root representatives indicated they intend to follow the Txt)()T sequencing Ihey also indicated their schedule indicates a total project time of 12 months .lolm I tax-ter asked if Midway Koad will need to be closed prior to commencement ofconstruclion; Conmnssioncr Jacobs stated she will take thc matter to thc thc Cmmmssioncrs Court upon receipt ora letter requestingtbe closing. I laHan Moore of the I)istrict R()W office reported that there are still twelve tBii'lor parcels to be obtained lkom thc Dcnlou County Reclamation and Road D~strict ucar thc Ehn Fork of thc Trinity. Txl)( )T bas initiated eminent domain proceedings against the I)istri~ and exq~ecXs all parcels to be clear bv September 1. Sam Fr~d~il asked thc dal~ when lack of ROW will impact th~ construction scbeduie Moore repo~aed tlmt an~blng after April I 5 ( the anticipated construction stma date) could all'ct Ibc schedule but most of thc parcels will nol impacl thc work. Buz Elsom reported that utility confllc~s at the east end of the proje~ will bare more impa~ than the R( )W acquisitions; he noted that General Telephone rq>rcscntativcs, who had previously ~ndicatcd clearance of their fitcilitics by April, advised in the I~recmmtmc~ion conference that the work would uoI he COlupleted until .lanum~ 1. I Shelby, Senior ()peratio, s Engineer fi*r GTI'~, repo~xed that the .lanua~y date incon'ec~ly included rcloc~iion work to clear thc ROW on Old Denton Road south of thc 121 mlcrchangc: thc work at thc intersection should be completed by Augtmt 1 Shelby stated bids will be taken fkw the work in three w¢¢ks and thc contraclor should start innncdialcly lbllowing receipt. Conmaissioncr Jacobs asked what the impac~ would be of an Augum I clearance The Bro~) & Root representative stated they would ph~g thc date into their schedule and report thc impact back to Elsom. Elsom noted Ihat TxDOT, I tro~ & Root and (;TI'; will be meeting nero week to discuss the schedule It was decided that a si>octal Task Force meeting will bc held April 12 lbr Ihosc members I>arlicularly concerned about th~s issue. Kobert Pope reported that 70 acres of right-or:way donatio, s or verbal commitments for douation have no'v¥ bccn received iii Scchon 15.13 ounnissioner J, cobs asked what plans arc bcmg llladG lO secure it From ROBERT W POPE To Ken Griffin Date 3/21/96 Time 9 13 00 PM Page 3 of 11 place lbr thc i>r~4icct on thc PDP. Pope rcporlcd thai Coilm County intends Io apl>roach thc '1 ran~pot~ation Commission with an o~r of 125 acre~ of I((>W (approximately 20% of the R()W required l~om Paigc Road in Denton Counly to US 75) and sabstm~tial cash to al>ply loward con,tin,ion It i~ hope that presentation can Be made in late ~ummer or I~MI. l~.uben I )elgado, ( !ollin ( !ounty I )irector o£ I'ingineering, reported that ( 7ollin ( 'ounty is planning interim improvements Io SH 121 Io improve tra,(lic sa,(~;ty and movement unlil permanent improvements are constructed 1 le introduced Ron 1 Iolder of Turner. (~ollie & I h'aden, Inc., tile consullant employed by thc county to sludy Ibc imlxovcmcnls. Holder explained thc method his lirm will use and asked each of the cities to provide him with copies of pertinent traffic studies, thoroughf'are plans, etc (?ollin (?ounty Commissioner Phyllis Cole repro'ted that tile east fi'ontage road of the Dallas Not'th Tollway Ii-om SH 121 to FM 72(I has bccn opened lbr trallic: Iht County plans lo sock bids shortly lbr the west fi'ontage road There being no fiulher business, tile tneeting was adjourned From ROBERT W POPE To Ken Griffin Date 3121/96 Time 9 13 00 PM Page 4 of 11 03/17/i996 15:03 2145'36 7 ROBERT W POPE ~SSC PAGE 01 P~O, T~S 75093 SH 121 TASK FORCE March 8, 1996 From ROBERTW POPE To KenGri~n Date 3/21/96 T~me 91300PM PageSof11 SH 121 TASK FORCE M~'ck 8, 19~6