Loading...
ST9904-CS 951208From: To: Ken Griffin ~ Date: 12/14/95 Time: 20:21:03 ~ Page 2 of 5 Note: Section drawings. TxDOT S.H. 121 TASK FORCE REPORT numbers in narrative below correspond December 8, 1995 to numbers on S.H. 121 CAPACITY A. Section 1: B. Section 2: C. Section 3: D. Section 4: E. Section 5: F. Section 6: IMPROVEMENTS (STAGE I) Tarrant/Dallas County Line to North of Denton Creek (4-lane divided highway with 2-lane frontage roads) Completed - July 1992 North of Denton Creek to I.H. 35E (4/6 lane divided highway) (CSJ 0364-03-078 & 0364-03-077) Completed - November 1993 I.H. 35E to East of F.M. 1171 (6-lane divided highway) Completed - June 1991 East of F.M. 1171 to East of the Elm Fork of the Trinity River (bridges) Completed - July 1988 East of the Elm Fork of the Trinity River to West of the Burlington Northern Railroad (4-lane divided highway) (CSJ 0364-03-042) Completed - February 2, 1994. Crider Road Project (0364-03-079) Project is open to traffic. West of the Burlington Northern Railroad to East of Legacy (4-lane divided highway) (CSJ 0364-03-043) Completed - March 29, 1994 From: To: Ken Griffin ~ Date: 12/14/95 Time: 20:2~:47 ~ Page 3 of 5 Section 7: East of Legacy to East S.H. 289 divided)(including the S.H. intersection) (CSJ 0364-04-028 & 0364-04-032) (4-lane 289 Completed - May 3, 1995 Section 8: S.H. 289 to U.S. 75 (4-lane divided) (CSJ 0364-04-022) On "hold" status in the 1995 PDP. The Dallas District requested that this project be elevated to Priority 2 authority in the 1996 PDP Update. This project was not selected by the Commission. 2. Category 3A - National Highway System Mobility. II. S.H. 121 {SPUR 553) LEWISVILLE BYPASS {STAGE I) (See attached for right of way status) A. Section 9: North of Denton Creek to Denton Tap Road (3-lane frontage roads) (CSJ 3547-03-002 & 3547-02-003) Category 13 - State Funded Mobility. This project was authorized in the 1996 PDP as approved by the Texas Transportation Commission on October 26, 1995. It has been given Priority 1 status with a 1996 scheduled year. As a result, the project has been placed in the draft FY 96-98 TIP for fiscal year 1996. 2. Estimated letting date is July 1996. 3. Construction plans are 79% complete. 4. Estimated construction cost is $14,000,000. Bo Section 10: Denton Tap Road to Lake Vista (3-lane frontage roads) Completed 1988 Co Section 11: Lake Vista to I.H. roads) (CSJ 3547-01-002) 35E (3-lane frontage 1. This project let on April 13, 1994. H.8. Zachry 2 From: To: Ken Griffin .~ Date: 12/14195 Time: 20:22:35 c~ Page 4 of 5 Company was awarded the contract with a bid of $10,165,798. 2. Construction began on July 6, 1994. 3. Project is 85% complete and on schedule. 4. Estimated open to traffic - April 1996. Section 12: I.H. 35E to Existing S.H. 121 Near P.M. 544 (3-lane frontage roac~s, freeway constructed where frontage roads are not proposed) (CSJ 3547-01-004) Category 13 State Funded Mobility. This project was authorized in the 1996 PDP as approved by the Texas Transportation Commission on October 26, 1995. It has been given Priority 1 status with a 1996 scheduled year. TxDOT has placed this project in the draft FY 96-98 TIP for fiscal year 1996. This project, at the request of the TxDOT Austin office, is scheduled for a January 1996 letting subject to approval of the TIP. 3. The final plans are 99% complete. 4. Estimated construction cost is $52,000,000. III. 121 FREEWAY IMPROVEMENTS {STAGE II) Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway) (CSJ 0364-02-017 & 0364-03-064) This project was elevated from feasibility status to Level I authority in the 1995 PDP. The TxDOT Dallas District will request Long Range Planning (LRP) authority in the 1996 PDP. 2. Category 3A - National Highway System Mobility. Section 14: Existing S.H. 121 Near Denton Creek to Existing S.H. 121 Near F.M. 544 (Lewisville Bypass)(Mainlanes) (CSJ 3547-03-003, 3547-02-004, & 3547-01-005) 3 From: To: Ken Grif~Sn ~ Date: 12/14/95 Time: 20:23:26 ~'* Page 5 of 5 On "held" in the 1995 PDP. This project was not selected for Priority 2 authority by the Commission. 2. Category 3A - National Highway System Mobility. Section 15: F.M. 544 to U.S. (Mainlanes) (CSJ 0364-04-023, 0364-03-067) 75 0364-03-066, 1. On "hold" status. Candidate for Category 4E: could become eligible Mobility). STP Urban Mobility (Note: for Category 3A NHS The Dallas District requested in the 1995 PDP update that authority be given te allow for State participation in right-of-way acquisition up to $70 million en the section ef S.H. 121 between S.H. 289 and U.S. 75. This was net included in the PDP update; therefore local governments have indicated they will prepare a formal request te secure TxDOT uight-of-way funding. RIGHT-OF-WAY STATUS S.H. 121 BYPASS December 8. 1995 Same as last month.