12~ TASK FORCE REPORT
Section numbers in narrative below correspond to numbers ®n
August 11, 1995
121 CAPACITY IMPROVEMENTS (STAGE I)
Section 1:
Tarrant/Dallas County Line to North of
Denton Creek (4,lane divided highway with
2-lane frontage roads)
Completed - July 1992
Section 2: North of Denton Creek to I.H. 35E (4/6
lane divided highway)
(CSJ 0364-03-078 & 0364-03-077)
Completed - November 1993
Section 3: I.H. 35E tO East of F.M. 1171 (6-lane
divided highway)
Completed - June 1991
Section 4:
East of F.M. 1171 to East of the Elm Fork
of the Trinity River (bridges)
Completed - July 1988
Section 5:
East of the Elm Fork of the Trinity River
to West of the Burlington Northern
Railroad (4-lane divided highway)
(CSJ 0364-03-042)
Crider Road Project (0364-03-079)
Completed - February 2, 1994.
Crider Road Project (CSJ 0364-03-079):
This project was bid on December 14, 1994.
The Commission awarded sunmount Corporation
the contract with a bid of $396,676.89.
b. Construction began on April 25, 1995.
Co
Project is 97% complete and open to traffic.
Ail that remains is the establishment of grass
cover.
Section
Section 7:
Project
Section 8:
west of the Burlington Northern Railroad
to East of Legacy (4-lane divided
highway)
(CSJ 0364-03-043)
Completed March 29, 1994
East of Legacy to East S.H. 289
divided)(including the S.H.
intersection)
(CSJ 0364-04-028 & 0364-04-032)
(4-lane
289
is complete and open to traffic.
S.H. 289 to U.S. 75 (4-lane divided)
(CSJ 0364-04-022)
1. On "hold" status in the 1995 PDP. The Dallas
District has requested that this project be
elevated to Level II authority in the 1996 PDP
Update.
2. C~tegory 3A - National Highway System Mobility.
II.
~,H. 121 (SPUR 553) LEWISVILLE BYPASS (STAGE I)
(See attached for right of way status)
A. Section 9:
North of Denton Creek to Denton TaD Road
(3-lane frontage roads)
(CSJ 3547-03-002 & 3547-02-003)
Category 13 State Funded Mobility. The FY 95-97
TIP does include this project in fiscal year 1996,
and the 3/10/95 estimated distribution of State
apportionments for fiscal year 1996 shows $66.3
million of which $14 million is designated for
Section 9. Public hearings will be conducted for
the FY 96-98 TIP during the summer of 95. The
project has been placed in the draft FY 96-98 TIP
for fiscal year 1996. ~y~ ~
Estimated letting date is , 1996. %
Construction plans are(72 omplete.
Estimated construction cost is $14,000,000.
"Plans adequate" was sent to the utility companies
on February 15, 1995.
The archeological survey is complete. No artifacts
were found·
2
De
Section 10:
Denton Tap Road to Lake vista (3-lane
frontage roads)
Completed - 1988
Section 11:
Lake Vista to I.H.
roads)
(CSJ 3547-01-002)
35E (3-lane frontage
This project let on April 13, 1994. H.B. Zachry
Company was awarded the contract with a bid of
$10,165,798.
2. Construction began on July 6, 1994.
4.
Section 12:
Project is 63% complete and on schedule.
Estimated completion date-~
I.H. 35E to Existing S.H. 121 Near F.M.
544 (3-lane frontage roads, freeway
constructed where frontage roads are not
proposed)
(CSJ 3547-01-004)
Category 13 State Funded Mobility (Shown in FY
94-96 TIP in 1996). The FY 95-97 TIP does not
include this project; however, the 3/10/95
estimated distribution of State apportionments for
fiscal year 1996 shows $66.3 million of which $52
million is designated for Section 12. Public
hearings will be conducted for the FY 96-98 TIP
during the summer of 95.
TxDOT has placed this project in the draft FY 96-98
TIP for fiscal year 1996 with the earliest possible
letting date of February 1996 (based on TIP
approval time).
3. The final plans are approximately 94% complete.
4. Estimated construction cost is $52,000,000.
The recent revisions to the Clean Water Act
Nationwide Permit program will require further
environmental coordination with Texas Parks and
Wildlife and the Corps of Engineers. Specifically,
there are two areas of concern: the existing pond
which lies within the ROW near the northbound
frontage road of I.H. 35E; and the densely wooded
area between the MKT Railroad and the Elm Fork of
the Trinity River. The notification process with
the Corps of Engineers will resolve the remaining
environmental issues once completed, probably by
3
o
7 o
the end of November 1995.
"Plans adequate" was sent to the utility companies
on February 10, 1995~
TxDOT has received a request from Denton County to
construct Midway Road using the City of
Lewisville's recommended pavement section (concrete
pavement, 37' back-to-back) because this section of
Midway Road will be incorporated into the City of
Lewisville's road system. TxDOT has determined the
new right-of-way requirements and the right-of-way
map has been updated. The affected property owner
is aware of the change.
TxDOT has finalized the right-of-way requirements
for the Standridge Road schematic revision and the
right-of-way map has been updated. S.H. 121
Freeway right-of-way donations are contingent on
formal local approvals of the revised design
schematic presented at the November 11, 1994 public
meeting, which will be submitted to the cities
along with the ROW Map by the end of August.
121 FREEWAY IMPROVEMENTS (STAGE II)
Section 13:
¸.
Tarrant County Line to North of
Creek (conversion to freeway)
(CSJ 0364-02-017 & 0364-03-06~)
Denton
This project has been elevated from feasibility
status to Level I authority in the 1995 PDP.
Category 3A - National Highway System Mobility.
At the December, 1994 S.H. 121 Task Force meeting,
a schematic revision was discussed that would
change the Freeport Parkway/S.H. 121 interchange
from a partial cloverleaf interchange to a diamond
interchange and eliminate the Parkway Boulevard
interchange at S.H. 121. Parkway Boulevard would
intersect with Freeport Parkway south of S.H. 121.
TxDOT has reviewed this schematic revision and has
determined that the construction cost will not
significantly change. The TxDOT Dallas District
has decided to pursue this schematic revision
subject to public involvement. Local participation
will not increase due to this schematic revision.
em
Section 14: Existing S.H. 121 Near Denton Creek to
Existing S.H. 121 Near F.M. 544
(Lewisville Bypass)(Mainlanes)
(CSJ 3547-03-003, 3547-02-004, &
3547-01-005)
1. On "hold" in the 1995 PDP.
2. Category 3A - National Highway System Mobility.
Section 15:
F.M. 544 to U.S. 75
(Mainlanes)
(CSJ 0364-04-023, 0364-03-066,
0364-03-067)
1. On "hold" status.
Candidate for Category 4D STP Urban Mobility
(Note: could become eligible for Category 3A - N-HS
Mobility).
o
The Dallas District requested in the 1995 PDP
update that authority be given to allow for State
participation in right-of-way acquisition up to $70
million on the section of S.H. 121 between S.H. 289
to U.S. 75. This was not included in the PDP
update; therefore local governments have indicated
they will prepare a formal request to secure TxDOT
right-of-way funding.
5
RIGHT-OF-WAY STATUS S.H. 121 BYPASS
Auqust 11, 1995,
me
S.H.121 Bypass:
(Section 9)
From Denton Creek
To Denton Tap Road
Outstanding Issues:
1. Parcel to be acquired:
so
Right of Entry to appraise:
Appraisal Completed: 95%
Negotiation Completed: 90%
Parcel Status:
Completed
1.) Acquired Parcels ~
2.) Purchase Pending 2
3.) E.D. Hearings Set 2
4.) E.D. Hearings Filed (not set) 3
5.) Parcels to A.G.'s office for E.D. action 0
6.) Parcels in TxDOT ROW Div. for E.D. action 0
7.) Parcels in District for E.D. action 3
8.) Parcels in Negotiation 2
Total 17
e.) Ail E.D. cases to date have been filed
County.
f.) Estimated Possession Date: May 1996
in Dallas
2. Utilities to be relecated:
a.) Lone Star Gas Company
b.) Brazos Electrical Co-op
c.) Texas-New Mexico Power
(mecember 1995)
(April 1996) (Construction
Pending)
(June 1996)
Personal Property to be relocated:
a.) Estimated clearance: August 1996
4. Final environmental clearance:
a.)
Archeological Artifacts: Archeological Survey is
complete and no artifacts were found.
II.
S.H. 121 Bypass=
(Sections 10, 11
& Part of 12)
Fr~m ~enton Tap
Road
To The Elm Fork of the Trinity River
(including S.H. 121 - I.H. 35E
Interchange)
Outstanding Issues:
Remaining parcels to be acquired:
a.) Right of Entry and Possession of all Parcels.
Utilities to be relocated:
a.) Texas-New Mexico Power - June 1996.
b.) G.T.E - June 1996.
3. Final environmental clearance: Completed.
III ·
S.H. lzl Bypass:
(Part of Section 12)
From The Elm Fork of the
Trinity River
To F.M. 423
Outstanding Issues:
Relocation of Standridge Drive - Final Right of Way Maps
are complete. (affects the property swap with land at
the F.M. 544/S.H. 121 intersection).
2. Remaining parcels to be acquired:
a.)
Minor drainage easements and construction easements
(T.E.'s) have been.appraised and reviewed. Singer
easements have been signed and are at Title Company
pending closing.
Utilities to be relocated:
a.) T.U. Electric Transmission Lines --
Clear by November 1995.
b.) G.T.E.
Clear by February 1996
c.)
Denton County Electric Coop.
Clear December 1996
d.) City of Carrollton Water & Sewer
Clear by January 1996
e.)
Texas-New Mexico Power
Clear February 1996
4. Final environmental clearance: Completed.