Loading...
ST9703-LR050721 one Engineenng 8908 Ambassador Row. Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, See. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Project: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 MacArthur Boulevard Widening ST 97-03 Report No.: 237922 Project No.: 0510377 Date of Service: 07/18/2005 Report Date: 07/21/2005 Services: Perform In-Place Density Test in accordance with ASTM Standards, PROJECT DATA CONTRACTOR: JP,.J Paving Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Moisture Current: 736 Previous: 732 Standard Counts Density Current: 2828 Previous: 2840 No. Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Lime treated Dark Brown & Yellowish Brown Clayey Sand w/LSF Project Requirements Moisture Density 21.0 100.0 Optimum +4 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION Paving subgrade 1 Southbound lane, MacArthur, Station 13 +00 Paving subgrade 2 Southbound lane, MacArthur, Station 16+00 Paving subgrade 3 Southbound lane, MacArthur, Station 19+00 Paving subgrade 4 Southbound lane, MacArthur, Station 22+00 Paving subgrade 5 Southbound lane, MacArthur, Station 25+00 PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pet) (pet) (% max) 6" 1 22.4 12 I. 1 98.9 99 6" 1 23.6 121.0 97.9 98 6" 1 21.6 122.3 100.6 I01 6" 1 22.1 121.2 99.3 99 6" 1 24.0 121.9 98.3 98 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject maker provided by persons or conditions over which we have no conttol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. )7TM Page 1 of 2 Report No.: 237922 Project No.: 0510377 Client: City of Coppell TEST NO TEST LOCATION PROBE DEPTH MiD MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pod (% max) Paving subgrade 6 Southbound lane, MacArthur, Station 28+00 Paving subgrade 7 Southbound lane, MacArthur, Station 31 +00 Technician: Joe Jemigan Report Distribution: (1) City of Coppell (1) City of Coppell 6" I 23.5 122.6 99.3 99 6" 1 21.7 122.7 100.8 101 Test results on this report meet project specification. //~ /~ Started: 7:30am Finished: 9:30am R~ng ~,/L~Iay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leUers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Enginee:ing Services, Ltd }TTM Page 2 of 2