Loading...
ST9905-CS050804I Suzan Taylor - RE: Bethel Road Box Culvert Page 1 I From: TO: Date: Subject: "Sam Meisner~' <sam@freese.com> "Suzan Taylor" <staylor@ci.coppell.tx.us> 8/4/2005 9:22:16 AM RE: Bethel Road Box Culvert Suzan, I thought I sent you an email last night? We've had a couple problems with our email system this week, so maybe it didn't get to you. I think your interpretation of those flowline shots was correct where the 12" SS is at 499.0 and the 8" SS coming in from the south is at 500.0. Sam Meisner, P.E. Freese and Nichols, Inc. p 214-217-2235 .... Odginal Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Thursday, August 04, 2005 8:53 AM To: Sam Meisner Subject: Bethel Road Box Culvert Sam: Have you had a chance to look at the elevations shown for the manhole under the proposed box culvert. TS needs the information as soon as possible, they are having to pull out a section of the drainage improvements for construction prior to the rest of the project being constructed. We may have to raise the roadway elevation depending on the elevation of the manhole. Thanks ,.-FO(.. z~- ~,~o~ :~x C.~LVE ~T~ PF.T.T. PG. 797 3F EXISTING__ .OCATED MH STA: 30+04,75 END OPEN CHANNEL BEGIN 4-5'x10' BOX CULVERTS ABANDON EXISTING SAN. SEWER MH__ ~ISTALL PROP. MH 34' TO THE EAST PROPOSED SAN, EXTEND 28 L INTO BOX CU SEE DETAIL S CONNECTION 30+48,~ END 4-5'x10' BEGIN OPEN 31 + O0 ~ I