SS9901-CS050623June 23,2005
rt O N STRUCTI(~N C O 1,4 FaA NY
] ] 03] Grissom Lane
Dallas, Texas 75229
972-484-4344 tele
972-484-4223 fax
VIA FACSIMILE
972.304.3570
Mr. Kenneth Griffin
Ci~ of Coppell
255 Parkway Bouleva~
CoppelI, Texas 75019
Reference: Deforest & Sandy Lake Lift Station
Project # SS 99-01
Subject: Additional Soil Testing
Dear Mr. Griffin:
This is to notify you that at the end of the business day today we will have placed
the lean concrete slab, and we are now prepared in the morning to start installing
formwork and rebar for the lift station structural slab.
We have been directed by Rick O'Dell that a testing lab will be at the job site in
the morning. We will be unable to progress on our slab until the engineer and
the City of Coppell have determined the results for the suitability of the remaining
in-situ soils under the structure.
Sincerely yours,
Charles Ferrara
Vice President
CF:dma
cc: Job 04-044 Corresp. File
TRANSMISSION VERIFICATION REPORT
TIME
NAME
FAX
TEL
SER.#
08/23/2005 17:12
CANFER CONSTRUCTION
9724844223
9724844344
BROE2J353637
DATE,TIME
FAX NO./NAME
DURATION
PAGE(S)
RESULT
MODE
06/23 17:12
9723043570
00:00:1S
01
OK
STANDARD
ECM
June 23, 2005
~rl N 5TR U CTI tin COMPANY
I 1032 Grissom Lane
Dallas, Texas 75229
9 72-484~4 344 tale
g72.484.4223 fax
VIA FACSIMILE
972.304.3570
Mr. Kenneth Griffin
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Reference: Deforest & Sandy Lake Lift Station
Project # SS 99-01
Subject: Additional Soil Testing
Dear Mr. Griffin:
This is to notify you that at the end of the business day today we will have placed
the lean concrete slab, and we are now prepared in the morning to start installing
formwork and rebar for the lif~ station structural slab,
We have been directed by Rick O'Dell that a testing lab will be at the job site in
the morning. We will be unable to progress on our slab until the engineer and
the City of Coppell have determined the results for the suitability of the remaining
in-situ soils under the structure.
Sincerely yours,