Loading...
Windsor Estates-PT050805: iA copy of the approved permit must be on the job s!teatal!tmes!: CC: Applicant Public Works Permit File Orig. to Project File RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the En~ineerin~ Dept., Town Center, 255 Parkway' Blvd. FILE COPY Date of Submittal: ~. t./.O~' Applicant' s Job # / Work Order # ,~/'7.:~ lq O PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use AgreemenO License Agreement Approved (date) __/ / Certificated Telecom Provider? [] Plans provided and approved (Erosion Control/safety fences must be installed prior to beginning work) ProjectName/Location: ~O~/a~,~l.e' g~ree/- ~t;.~ ~t ~q General Contractor: ~'la.l~(~ c Y N Permit issued to Company / Representative: Address: /0/~ ~ ~//~ / Telephone g: q 72 ') >~ 'f f/7 Emergency Telephone Utility Company Represented: [~'lCxu Electric Delivery Co. [] Atmos Energy (formerly TXU Gas) [] Verizon [] SBC [] ComCast Cable [] AT&T Local Services [] GrandeCom (formerly CoServ) [] CoServ Electric/Gas [] Other ~ If "Other" is checked, please note that franchise or right-of-way use agreements will be required and need Council approval prior to beginning work. Permit cannot be approved until that time. General Description of Work (provide four (4) sets of plans): Estimated Start Date ~'--///- p,C-- Estimated Completion Date* * Completion requires submittal of Completion Verification Notice (see page 4) Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: YES [] NO [] Is removal of existing streets, alleys, or sidewalks necessary? YES [] NO [] if YES, must have City inspection prior to concrete replacement Ri~ht-of-Wa~, Use Permit Application Pave 2 of 4 Revised 06/03 Representative(s) of the Contractor must adhere to ail construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at the applicants expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department ~ 972-304-3600 Fire Department ~ 972-304-3500 Street Department ~ 972-462-5150 Engineering Department ~ 972-304-3679 Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m. until 3:00 p.m. ONLY unless otherwise approved by City Engineer. Attach Work Order (franchise ~ and/or 3 sets of ~rints showin (Application with original signatures needs to be submitted to the Engineering Department before approval.) Signatur ity Company Representative ~Printed Name Date Signature of Contractor Representative Sig[ature of City Rel~sentative ~ Comments: Plr0 -~ P.~i,~' V~ Printed Name Date ~k~rl~.~_ ~Ma.4H~4v.~ ~.ff- OS- Printed Name Date NOTE: Notifr CiO; Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. (Backfill must meet ail construction standards approved by the City of Coppell.) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Page 3 of 4