Loading...
ST9302-LR 990819ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: CITY OF COPPELL COPPELL, TEXAS REPORT OF: CONCRETE COMPRESSION TEST DATE OF tSSUE: 08/19/99 PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 OUR REPORT NO.: COPPELL, TEXAS 98881-59 LOCATION OF CONCRETE PLACEMENT FIELD DATA STORM DRAIN MANHOLE: DECK AND RISER (~ STATION 25+50 NORTH SIDE DATE PLACED 08119/99 TIME 14:30 SLUMP (ASTM C-143) /" 4 AIR CONTENT (ASTM C.231 [] OR C-173I~ 4.5 AIR TEMPERATURE 104 CONCRETE TEMPERATURE 101 DATE RECEIVED 08/20/99 FIELD OATA SUBMII'I'ED BY T.L. MIX DATA SUBMITTED BY LATTIMO, RE SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 let OR C-1231 [] PLANT 7 DEUVER TICKET NO. 7075794 MIX PROPOR~ (SSD) CEMENT N/A WATER NIA FINE AGGREGATE N/A COARSE AGGREGATE N/A AOMIXTURE NIA COMPRESSION TEST RESULTS (NOMI~U~. CYUNOF~ SrZE e' x ~STM C-3S) LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE NO. CURING TESTED DAYS LOAD STRENGTH, PSI 49 LAB 08/26/99 7 101,206 28.27 3,580 50 LAB 09/16/99 28 122,760 28.27 4,340 51 LAB 09/16199 28 127,518 28.27 4, 510 52 LAB HOLD H 28.27 SpecmcaUons 28 3,000 REMARKS: [~indem made by ALPHA represenlafive. ~ C~inders made by ~iC~inders picked up by ALPHA [] C~lin~rs ~iv~r~:~ to ALPHA with applicable specifications. Su~_.~ KLPHA TESTIIqG, INC.//v ~eofechnicol Engk3eedr~ · Consfructlo~ IVIoferiols Testing · Environmentol Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR CITY OF COPPELL COPPELL, TEXAS I I I I REPORT OF FIELD COMPACTION TESTS DATE 8/19/99 II PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-58 PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TESTD~ SOIL ID OmlUU~ MAXIMUM LAB IN PLACE IN PI.ACE I:~RCE'NT NO. DATE NUMBER MOISTMRE DRY DENSITY MOISTURE DRY DENSr~ COHPAC~ON COMMENT* 171 8/19199 FG-4.0 6 12.5 111.2 15.5 108 97 1-A 174 8/19/99 FG-I.0 6 12.5 111.2 12.9 110 99 1-A TEST LOCATION: 170 WOOD CREST OVE, R 30", 36",.AND 21,",$ANITA, RY SEWER AT STATION f~25+,50 , t71 WOOD CREST OVER 30", 36", AND 21" SANITARY SEWER AT STATION f~25+50 172, WOOD CREST 0V.ER 30", 36", AND 21" SANITARY SEWER AT STATION #25+50 ......... 173, WoOD,CREST OVER 30", ,3~,.", AND, 21" SANITARY SEWER AT STATION ~25+50 ....... 174 WOOD CREST OVER 30" 36", AND 21" SANITARY SEWER AT STATION ~25+50 11 FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED * A. IN PLACE PERCENT MOI~llJRE AND PERCENT COMPACTION COMPLY WFrH SPECIFICATIONS B. PERCENT COMPACTION DOEs NOT COMPLY VVITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPEC1FICATI(::~IS D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting 1:I' '1 I '111 '- I