Vista Ridge 1R-8 D-LR050805S^M E.G .EE. .G & TEST . , ,.,.
Serving The Goo-Industry Since 1974 .~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
Geolechnical
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
PROJECT:
~,TTN:
)E&T TECHHICIAN:
JBP, LP
5301 Village Creek Ddve, Suite A
Plane, TX 75093
The Plaza Infrastructure
Highway 121 & Ridgemont
Lewisville & Coppell, TX
Neal Heckel
Mark Brumley
STANDARD 6" X 12"
~,REA 28.27 SQ. IN.
REPORT DATE: 8/5/05
SAMPLE DATE: 8/4/05
PROJECT NO.: 308TXIK$
REPORT NO.: 14
LOCATION OF PLACEMENT:
Plaza Blvd.; Sta # 9+50
PAGE 1 OF 6
Time Arrived: 7:00 AM
Time Left: 4:00 PM
;lump (Inches): 2
;oncrete Temperature (F): 85
% Air Content: 4
Total No. of Test Cylinders Made: 24
Total Cubic Yards Placed: 900
Added Wate~ N/A
Yeather Conditions: Sunny & Hot
9O
Concrete Supplier:
Ticket #:
Truck #:
Time Batched:
Time Sampled:
Product Code:
Cement:
Fly Ash:
Coarse Aggregate:
Water;.
Gilco
N/A
N/A
8:15 AM
8:30 AM
N/A
N/A
N/A
NIA
NIA
of Fresh Concrete: 149
% Air Content:
N/A
lA 7 8/11/05
1 B 14 8/18/05
1C 28 9/1/05
1D 28 9/1/05
ASTM C-31
Slump ASTM C-143
Test Method
ASTM C-39 & 231
Cylinder Made By:
SE&T
Remarks:
3500/28
3500~28
3500/28
3500/28
Cylinders Tested By:
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our pdor written consent.
This report onl~f applies to the samples tested and does not necessarily/represent identical or similar samples.
G:/2005/308txikS/Cpistr/Cpistrl 4/S F
SAM ENGINEERING & TESTI.G, ,.,.
iServing The Goo-industry Since 1974 '~
1115 Luke Street, Suite 1 O0
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
JBP, LP
5301 Village Creek Drive, Suite A
Plane, TX 75093
PROJECT:
The Plaza Infrastructure
Highway 121 & Ridgemont
Lewisville & Coppell, TX
~.TTN: Neal Heckel
SE&T TECHNICIAN: Mark Brumley
LOCATION OF PLACEMENT:
Pavin Plaza Blvd., Sta # 11+00
STANDARD 6" X 12"
AREA 28.27 SQ. IN.
REPORT DATE: 815/05
SAMPLE DATE: 8/4105
PROJECT NO.: 308TXIK5
REPORT NO.: 14
PAGE 2 OF 6
Time Arrived: 7:00 AM
Time Left: 4:00 PM
Slump (Inches): 2
Concrete Temperature (F): 89
% Air Content: 5
Total No. of Test Cylinders Made: 24
Total Cubic Yards Placed: 900
Added Water: N/A
Weather Conditions:
Sunny & Hot
~ir Temperature (F): 90
;ht of Fresh Concrete: 148
Concrete Supplier. Gilco
Ticket #: N/A
Truck#: N/A
Time Batched: 9:00 AM
Time Sampled: 9:15 AM
Product Code: N/A
Cement: N/A
FlyAsh: N/A
N/A
Water: NIA
% Air Content: N/A
2A 7 8/11/05 3500/28
2B 14 8/18/05 3500/29
2C 28 9/1/05 3500~30
2D 28 9/1/05 3500131
Curing ASTM C-31 Test Method Cylinder Made B Cylinders Tested By:
Slump ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed~ The use of our company name must receive our pdor written consent.
This report onh/applies to the samples tested and does not necessarily represent identical or similar samples.
G:/20OS/308txik5/CpistrlCpistrl 4/SF
SAM ENGINEERING & TESTING, L.P.
Serving The Gee-Industry Since 1974 '~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
JBP, LP
5301 Village Creek Ddve, Suite A
Piano, TX 75093
PROJECT:
The Plaza Infrastructure
Highway 121 & Ridgemont
LewisviJle & Coppell, TX
~,TTN: Neal Heckel
SE&T TECHNICIAN: Mark Brumley
LOCATION OF PLACEMENT:
Time Arrived: 7:00 AM
Time Left: 4:00 PM
2
· Dr. Sta # 6+00
Concrete 90
% Air Content: N/A
Total No. of Test Cylinders Made: 24
Total Cubic Yards Placed: 900
STANDARD 6" X 12"
AREA 28.27 SQ. IN.
REPORT DATE: 8/5/05
SAMPLE DATE: 8/4/05
PROJECT NO.: 308TXIK5
REPORT NO.: 14
PAGE 3 OF 6
Concrete Supplier: Gilco
Ticket #: N/A
Truck #: N/A
Time Batched: 12:00PM
;Time Sampled: 12:15 PM
Product Code: N/A
Cement: N/A
Added Water: N/A Ash: N/A
Weather Conditions:
Sunny & Hot
95
Coarse A~qre~ate: N/A
Water: N/A
ht of Fresh Concrete:
147
% Air Content: N/A
3A 7 8/11/05
3B 14 8/18/05
3C 28 ~1~5
3500/28
3500/28
3500/28
3500/28
Cylinders Tested By:
3D 28
Curing ASTM C-31
ASTM C-143
Remarks:
Test Method
~,STM C-39 & 231
Cylinder Made By:
SE&T
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
The use of our company name must receive our pdor written consent.
does not necessarily represent identical or similar samples.
G:/2005/308b(ik5/Cpistr/Cpistr 14/S F
SAM ENGINEERING & TESTING, L.P,
Serving The Goo-Industry Since 1974 '~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CLIENT:
PROJECT:
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
JBP, LP
5301 Village Creek Drive, Suite A
Piano, TX 75093
The Plaza Infrastructure
Highway 121 & Ridgemont
Lewisville & Coppell, TX
ATTN: Neal Heckel
SE&T TECHNICIAN: Mark Srumley
STANDARD 6" X t2"
AREA 28.27 SQ. IN.
REPORT DATE: 8/5/05
SAMPLE DATE: 8/4/05
PROJECT NO.: 308TXIK5
REPORT NO.: 14
LOCATION OF PLACEMENT: Pavir PI;;; Blvd. Sta # 4+50
PAGE 4 OF 6
Time Ardved: 7:00 AM Concrete Supplier: Gilco
Time Left: 4:00 PM Ticket #: N/A
2 Truck #: N/A
95 Time Batched: 2:45 PM
Slump (Inchesl:
Concrete Temperature
% Air Content:
4
Total No. of Test Cylinders Made: 24
Total Cubic Yards Placed: 900
Added Water: N/A
Weather Conditions:
Air Temperature (F):
Sunny & Hot
98
Time Sampled: 2:50 PM
Product Code: N/A
Cement: N/A
Fly Ash: N/A
Coarse A~l~re~ate: N/A
Water: N/A
of Fresh Concrete: 147 % Air Content: N/A
4A 7 8/11/05 3500/28
4B 14 8/18~05 3500/28
4C 28 9/1/05 3500/28
4D 28 9/1/05 3500128
Curing ASTM C-31
~ ASTM C-143
Test Method
ASTM C-39 & 231
Cylinder Made By:
SE&T
Remarks:
Very Truly Yours,
Sadik (SAM)AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily/represent identical or similar samples.
G:/20OS/308txik51Cpist rlCpistr 14/SF
S^M E,G ,EE. ,G & TEST ,G. ,.P.
Serving The Goo-industry Since 1974 ,~
1115 Luke Street, Suite 100
irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
JBP, LP
5301 ~llage Creek Drive, Suite A
Piano, TX 75093
PROJECT: The Plaza Infrastructure
Highway 121 & Ridgemont
Lewisville & Coppell, TX
~.TTN: Neal Heckel
SE&T TECHNICIAN: Mark Brumley
STANDARD 6" X 12"
AREA 28.27 SQ. IN.
REPORT DATE: 8/5105
SAMPLE DATE: 8/4/05
PROJECT NO.: 308TXlK5
REPORT NO.: 14
L OCATION~ Pavin Plaza Blvd. Sta# 7+ 0~
Time Arrived: 7:00 AM
PAGE 8 OF 6
Slump (Inches):
Air Content:
Concrete Supplier: Gilco
Ticket #:
Time Left: 4:00 PM N/A
2 Truck #: N/A
95 Time Batched: 1:45 PM
5 Time Sampled: 2:00 PM
Total No. of Test Cylinders Made: 24 Product Code: N/A
Total Cubic Yards Placed: 900 Cement: N/A
Added Water: N/A N/A
Hot
Weather Conditions:
FI}, Ash:
Coarse A~re~ate: N/A
Water: N/A
97
Unit 149 % Air Content: N/A
5A 7 8111/05
3500~28
5 B 14 8/18/05
5C 28 9/1/05
3500/28
3500/28
5D 28 9/1/05
Cudng ASTM C-31 Test Method Cylinder Made By:
) ASTM C-143 ASTM C-39 & 231 SE&T
3500~28
Cylinders Tested By:
Remarks:
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samples.
G:12005i308txikS/CpistrlCoistr141SF
SAM ENGINEERING & TESTING, L.P.
1~ Serving The Geo-lndustry Since 1974 1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
Geotschnical
CLIENT:
PROJECT:
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
JBP, LP
5301 Village Creek Ddve, Suite A
Piano, TX 75093
The Plaza Infrastructure
Highway 121 & Ridgemont
Lewisville & Coppell, TX
~,TTN: Neal Heckel
SE&T TECHNICIAN: Mark Brumley
STANDARD 6" X 12"
~REA 28.27 SQ. IN.
REPORT DATE: 8/5/05
SAMPLE DATE: 8/4/05
PROJECT NO.: 308TXIK$
REPORT NO.: 14
LOCATION OF PLACEMENT: Pavir Plaza Blvd., I Sta # 9+50
PAGE 6 OF 6
Time Arrived: 7:00 AM Concrete Supplier: Gilco
Time Left: 4:00 PM Ticket #: N/A
3 Truck #: N/A
89 Time Batched: 3:00 PM
Concrete Temperature (F):
% Air Content:
Total No. of Test Cylinders Made: 24
Total Cubic Yards Placed: 900
Added Water N/A
Weather Conditions:
Air Temperature (F):
Sunny & Hot
98
Time Sampled: 3:15 PM
Product Code: N/A
Cement: N/A
Fly Ash: N/A
Coarse Aggregate: N/A
Water: N/A
Concrete: N/A % Air Content: N/A
6A 7 8/11/05
6B 14 8/18/05
6C 28 9/1/05
3500128
3500/28
3500/28
60 28 9/1/05
3500/28
Curing ASTM C-31
) ASTM C-143
Remarks:
Test Method
~,STM C-39 & 231
Cylinder Made By:
SE&T
Cylinders Tested By:
' Yours,
Sadik (SAM)AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samples.
G:120051308txikSICpistrlCpistr141SF