Loading...
Park West CC(02-2)-LR050805I~EE]3 I EI'=I[~ II'=IEEF:;III'--Ir";~ GEOTECHNICALAND G ~ [~] I I F:~ ENVIRONMENTAL CONEULTANTS REPORT OF FIELD DENSITY TESTS Park West Commerce Center Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 4 REPORT DATE: 08-05-05 REG PROJECT NO. 12468 TECHNICIAN: P. Becerra PAGE: 1 of 1 Proctor ASTM No. Standard 1 D-698 2 D-698 Optimum Maximum Description Mo sture, % Density, PCF Dark gray and Olive brown clay 25.4 91.5 Dark brown clay w/calcareous nodules and 23.9 94.4 trace of gravel Test Depth Field Below I Field Final S. G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID 13 07-21-05 Bldg Pad A: 40'S, 25'E(1) 0.0 90.1 26.1 2 ,~.4r 14 Bldg Pad A: 50'S, 30'W(2) 0.0 91.5 26.7 2 /' 97.0 15 07-22-05 Bldg Pad B: 150'N, 50'E(3) 0.0 86.5 26,0 1 ____/ 94.5 16 Bldg Pad B: 75'N, 15'E(3) 0.0 90.3 24.1 1195.6/ ~.~J Comments: Where tested, materials were in compliance with project specifications."--'- Footnotes: (1) Measurements referenced from N.W. corner of Building A. (2) Measurements referenced from N.E. corner Building A. (3) Measurements referenced from S.W. corner of Building B. Mail Distribution: (1) (1) (1) (1) (1) (1) Mr. Mike Smith Cadence McShane Corporation/ Mr. Bobby Paret Commerce Construction Co., LP/ Mr. Rick Wyly City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone Northwestern Investment Mgmt./ Mr. Ernest Willmore Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn Stewart Consulting Associates/ 2424STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 · TEL [214] 3505600 '* F^X [214] 350 0019 GEOTECHNICAL AND ENVJP, ONHENTAL CONSULTANTS RI=PORI OF Fl£1D D;N$1T~ 1f[81'8 Park West Commeroe Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 3 REPORT DATE: 08-05-05 REG PROJECT NO. 12468 TECHNICIAN: J. Baradziej PAGE: 1 of 1 Proctor ASTM No. Standard Description 1 D-698 Dark gray and Olive brown clay 2 D-698 Dark brown clay w/calcareous nodules and trace of gravel Optimum Maximum Mo sture, % Density, PCF 25.4 91.5 23.9 94.4 Test Depth J J Below J Field J Field Final S.G. Density Moisture No. Date Location (feet) (pcf) (%) 11 07-20-05 Bldg Pad A: 150'S, 60'W(1) 1.0 90.7 26.6 12 Bldg Pad A: 200'S, 60'W(1) 1.0 91.4 26.1 Pro~tor C~_emvPea~ti%~n 2 96.1 2 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.E. corner of Building A. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/rs 2424STUTZ DR. * SUITE400 * DALLAS, TX75235 *, TEL[214]3505600 *, F^X [214] 3500019 REPORTED TO: CONTRACTOR: REPORT OF WATER INJECTION OBSERVATION Park West Commerce Center _ _ Beltline Road and Airline Road ~~,{rppell, Texas Cadenc~i,,l~cS ha ne Corpora[~on 14860 Montfod Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Parer Cadence McShane Corporation REPORT NO. 5 REPORT DATE: 08-05-05 REG PROJECT NO. 12468 TECHNICIAN: PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (fi) (fi) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (sa) (ft) (ft) 3 4 11.5 5 Area Injected (sq ft) I Average Pressure (psi) I Pass No. 26,000 200 1 Date 07-22-05 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates// Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkin ~/~ Manager, CMT BW/cn 2424STUTZ DR, ,. SUITE 400 ,. DALLAS, TX 75235 ,. rEL [214] 3505600 ~, FAX [214] 3500019