Loading...
PA9702-LR 990628 (4) CONCRETE COMPRE f IVE STRENGTH TES "' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/15/1999 Report No.: 9916424 Report Date 06/28/1999 Client No.: COPPELL ProjectNo.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr B X id 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: NelsonBros. PLACEMENTDATE: 06/15/1999 BATCH TIME: ll:52am PLANT: Lewisville TIME SAMPLED: 12:40pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER cosnrrloNs: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- Am 86 F CONCRETE: 85 F SLUMP: 4.0-6.0" TRUCK NO: 206 TICKET NO: 73478 AIR: N/A AIRCONTENT(%): N/A U~rrWEIGHT(pd): N/A TEST METHOD: ASTM C-143 PLACEM~-NT LOCATION: Pier infutmation and technician time: Sc~ Report # 9916423 ASTM C-172 ASTM C-39 SAMPLE LOCATION: RA-R2 South REPORT OF TESTS AC~T1VEYARD$: 45 CYLINDER MEASURED MAXIMUM COMPRESS fiE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (lnr. hes) TESTED (days) (Ib~ force) (psi) TYPE 1 1 5.75 06/22/1999 7 108400 3830 1 2 5.75 06/22/1999 7 108020 3820 Average 3830 I 3 5.75 07/13/1999 28 1 4 5.75 07/13/1999 28 Ten (10) gallons of water added. Technician: Mike Odom Sm~d: 12:00pm Finished: 6:00pm ~ E 'neering, Inc. (1) City of Coppcll (1) City ofCoppcll - Engineexing ' (l) BlinkIcy Sargent Architects (I) City ofCoppell - Bldg. Insp. Eugene Harbour (1) Turner Engineers (l) City ofCoppell - Leisure Say Dcpt Vice President (1) Hisaw & Associates This tepo~ is exclusively for the use of the client indicated above and shall not be reptoduc~ except in full without the written approval of HBC Engineering, Inc. 01TM Page I of 1