PA9702-LR 990628 (4) CONCRETE COMPRE f IVE STRENGTH TES "'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 06/15/1999 Report No.: 9916424 Report Date
06/28/1999
Client No.: COPPELL ProjectNo.: 94991118
Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr
B X id
732 DeForest 300 Block of Parkway Blvd
Coppell TX 75019 Coppell, Texas/Prj. #96051
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack
CONCRETE SUPPLIER: NelsonBros. PLACEMENTDATE: 06/15/1999 BATCH TIME: ll:52am
PLANT: Lewisville TIME SAMPLED: 12:40pm BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER cosnrrloNs: Partly cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- Am 86 F CONCRETE: 85 F
SLUMP: 4.0-6.0" TRUCK NO: 206 TICKET NO: 73478
AIR: N/A AIRCONTENT(%): N/A U~rrWEIGHT(pd): N/A
TEST METHOD: ASTM C-143 PLACEM~-NT LOCATION:
Pier infutmation and technician time: Sc~ Report # 9916423
ASTM C-172
ASTM C-39
SAMPLE LOCATION: RA-R2 South
REPORT OF TESTS AC~T1VEYARD$: 45
CYLINDER MEASURED MAXIMUM COMPRESS fiE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (lnr. hes) TESTED (days) (Ib~ force) (psi) TYPE
1 1 5.75 06/22/1999 7 108400 3830
1 2 5.75 06/22/1999 7 108020 3820
Average 3830
I 3 5.75 07/13/1999 28
1 4 5.75 07/13/1999 28
Ten (10) gallons of water added.
Technician: Mike Odom Sm~d: 12:00pm Finished: 6:00pm ~ E 'neering, Inc.
(1) City of Coppcll (1) City ofCoppcll - Engineexing '
(l) BlinkIcy Sargent Architects (I) City ofCoppell - Bldg. Insp. Eugene Harbour
(1) Turner Engineers (l) City ofCoppell - Leisure Say Dcpt Vice President
(1) Hisaw & Associates
This tepo~ is exclusively for the use of the client indicated above and shall not be reptoduc~ except in full without the written approval of HBC Engineering, Inc.
01TM Page I of 1