ST9905-CS050809 (2) Page 1 i
~ Suzan Taylor - RE: Bethel Road Box Culverts
From: "Sam Meisner" <sam@freese.com>
To: "Suzan Taylor" <staylor@ci.coppell.tx.us>
Date: 8/9/2005 4:07:10 PM
Subject: RE: Bethel Road Box Culverts
I talked to him this afternoon and he said he had everything he needed
from us. He told me he would send us a copy of the culvert plans as
soon as those are ready so that we can double-check how they fit with
the roadway.
Sam Meisner, P.E.
Freese and Nichols, Inc.
p 214-217-2235
..... Original Message .....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us]
Sent: Tuesday, August 09, 2005 3:22 PM
To: Sam Meisner
Subject: Bethel Road Box Culverts
Sam:
I talked with Craig and he set the bottom elevation of the culverts at
around 500.5. He is working on integrating the box culvert design
requirements requested by F&N into the plans. You might want to give
him a call - he had called your office looking for Chris Moorman - I
think he might have some questions about the headwalls. It would
probably be a good idea for you to double check, to make sure that he
gets everything right. His number is 972-280-9300.
Suzan