Billingsley-CS050810T H E · C I T Y * 0 F
COPPELL
MEMORANDUM
TO:
FROM:
DATE:
REF:
Ted Dutt, Utility Operation Manager
Larry Davis, Construction Inspector
972-304-3684
469-576-7707 (M)
August 10, 2005
Billlingsley Tract (south of Belt Line Rd, west of MaeArthur Blvd)
An onsite pre-construction meeting will be held on Thursday, August 11, 2005 at
10:00 a.m. for the Early Grading permit work to be done at this location.
CC:
Todd W. Reck, P.E. (treck~ci.irving.tx.us), City of Irving Water Utilities
Randall Payton, randall.payton~dallascityhall.com ,Dallas Water Utilities