Coppell Trade-LR050803CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94051190.0064
Service Date: July 5, 2005
Client: Coppell Trade Center LP
Attn: Bennet Ratliff
5055 Keller Springs Rd Ste 300
Addison TX 75001
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) e30-1010
Report Date: August 03, 2005
Project: Coppell Trade Center- Bldg C
NWC Sandy Lake/Freeport Pkwy
Coppell, TX
Project Number: 94051190
Material Information
Specified Strength: 4000 psi @ 28 Days
Batch Time: 6:48am
Supplier: TXI
Truck No: 109
Mix I.D. No.: 8206
Water Added Onsite Before Test:
Water Added Onsite After Test:
Field Test Data
Test
Plant: 141
Ticket No: 75176
0 Gallons
0 Gallons
Result
Slump, inches: 5.75
Air Content, %: 3.7
Concrete Temperature, O F: 90
Ambient Temperature, o F: 85
Plastic Unit Weight, pcf:
Laboratory Test Data
Sample Information
Sample Time: 7:10am Date Cast: July 5, 2005
Technician: Eric G. Jernigan
Weather Conditions: Clear, warm and humid
Accumulative Yards: 90
Placement Method: Direct Discharge
Sample Locations: 140' N of Grate inlet
Placement Location: E side Pavement and Fire Lane
Specification Test Method
3-5
3.4
Set Specimen Diameter Area Date
No. ID (inches) (sq. inches) Tested
1 1 6.00 28.27 07/12/2005
1 2 6.00 28.27 07/12/2005
1 3 6.00 28.27 08/02/2005
1 4 6.00 28.27 08/02/2005
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Test Load Strength
(days) (lbs) (psi)
7 96,530 ~' 3,410
95,050
Average ~"3,390
28 123,480
28 117,170 44,2~60
Average
Comments: Not tested for plastic unit weight.
Services- Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the Iocstion(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94051190.0064
Service Date: July 5, 2005
Client: Coppell Trade Center LP
Attn: Bennet Ratliff
5055 Keller Springs Rd Ste 300
Addison TX 75001
'lrerracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Report Date: August 03, 2005
Project: Coppell Trade Center- Bldg C
NWC Sandy Lake/Freeport Pkwy
Coppell, TX
Project Number: 94051190
Material Information
Specified Strength: 4000 psi (~ 28 Days
Batch Time: 7:57am
Supplier: TXI
Truck No: 69
Mix I.D. No.: 8206
Water Added Onsite Before Test:
Water Added Onsite After Test:
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Temperature,o F:
Ambient Temperature, o F:
Plastic Unit Weight, pcf:
Laboratory Test Data
Plant: 141
Ticket No: 75303
0 Gallons
0 Gallons
Result
6.50
4.8
88
86
Sample Information
sample Time: 8:15am Date Cast: July 5, 2005
Technician: Eric G. Jemigan
Weather Conditions: Partly cloudy, warm
Accumulative Yards: 190
Placement Method: Direct Discharge
Sample Locations: At Grate inlet (east)
Placement Location: SE side of Fire Lane and Pavement
Specification Test Method
3-5
3.4
Set Specimen Diameter Area Date
No. ID (inches) (sq. inches) Tested
2 1 6.00 28.27 07/12/2005
2 2 6.00 28.27 07/12/2005
2 3 6.00 28.27 08/02/2005
2 4 6.00 28.27 08/02/2005
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Test Load Strength
(days) (lbs) (psi)
7 85,850 ~,040
7 88,400 · ~
Average 3,090
28 113,540 / 4,020 .
28 113,450
Average 4,020
Comments: Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were parformed in general acoordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusiveh/for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein ara onh/applicable
to the actual samples tested at the Icoation(s) referenced and ara not necessarily,indicative of the properties of other apparently similar or identical
materials.
Page 2 of 3 o~.;~.. ~
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94051190.0064
Service Date: July 5, 2005
Client: Coppell Trade Center LP
Attn: Bennet Ratliff
5055 Keller Springs Rd Ste 300
Addison TX 75001
'1 rerracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Report Date: August 03, 2005
Project: Coppell Trade Center - Bldg C
NWC Sandy Lake/Freeport Pkwy
Coppell, TX
Project Number: 94051190
Material Information
Specified Strength: 4000 psi @ 28 Days
Batch Time: 9:06am
Supplier: TXI
Truck No: 69
Mix I.D. No.: 8206
Water Added Onsite Before Test:
Water Added Onsite After Test:
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Temperature,° F:
Ambient Temperature, e F:
Plastic Unit Weight, pcf:
Laboratory Test Data
Plant: 141
Ticket No: 75398
0 Gallons
0 Gallons
Result
7.50
5.2
9O
79
Sample Information
Sample Time: 10:17am Date Cast:July 5, 2005
Technician: Eric G. Jernigan
Weather Conditions: Cloudy, light rain and windy
Accumulative Yards: 290
Placement Method: Direct Discharge
Sample Locations: 40' N of SE Approach
Placement Location: SE Fire Lane and Pavement for Parking
Specification
3-5
3.4
Set Specimen Diameter Area Date
No. ID (inches) (sq. inches) Tested
3 1 6.00 28.27 07/12/2005
3 2 6.00 28.27 07/12/2005
3 3 6.00 28.27 08/02/2005
3 4 6.00 28.27 08/02/2005
Test Method
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Test Load Strength
(days) (lbs) (psi)
7 82,500 ] 2,920
7 80,140 ~
Average ~
28 112,890 3 9
28 115,960
Average 4,050
Comments: * Does not comply with specified strength. Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Eric G. Jemigan
Report Distribution:
(1) Coppell Trade Center LP
(1) TechniSt ructures
(1) City of Coppelr TX
(1) City of Coppell TX
(1) McFadden & Miller Reviewed by:
(1) Macatee Engineering Inc Robert D. Ray, S.~.
Senior project ~nager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclush/ely for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the Icoation(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.