Loading...
Vista Point II L5-CS050809SCHNITZ & SEWELL *ARCHITECTURE*PLANNING*DESIGN,, 9 August, 2005 Ms; Charlene La Mattina, E.I.T. Engineering Department THE CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: Lot 5, Block A Vista Point II/MacArthur Ridge Bank of Texas Dear Ms. La Mattina: Please find enclosed our m-submittal of engineering drawings for the above referenced site. This submittal comprises the following: ~/One copy. of City of Coppell original red lines Two copies of revised drawings ~Areport with paving stabilization parameters ssessment Table and Roadway Impact Fee of $3,535.31 We am currently bidding the project and expect to have final pricing on work included in the scope of this submittal on 16 August, 2005. We will forward this estimate to you at that time for purposes of verifying the construction inspection fee. Thank you for your assistance throughout this process. Sincerely, Pies E. Schnitz ENCL. cc: Mr, Nell Bmnnan, V.P. Bank of Texas 333 W. Cam~ Road. S~ite 355 Richardse~. Tm~as 75(360 Tel: 972.437.9844 Facsimile: 972.907.9975 www. schnitzandsawe#.ca~n