Loading...
ST9301-CS050810T H E - C I T Y . 0 F COPPELL August 10, 2005 Robert Caudill, Vice President Tiseo Paving Company PO Box 270040 Dallas TX 75227-0040 RE: ST 93-01 Sandy Lake Rd. Retaining Wall Design Dear Mr. Caudill: The City of Coppell has reviewed the designs for the segmental retaining walls (SRW) No. I, No. 2, B, C and D to be installed on the referenced project. These designs are approved as submitted. I would caution you to pay particular attention to the special provisions of the submitted design. The design engineer has assumed the existing subsurface conditions. Once de- xvatering and excavation has taken place, the subsurface soil must be tested for conformity with the design parameters. The design engineer must be advised of any differences. Samples with supporting documentation must be submitted for the geogrid, filter fabric, SRW units, select fill, TxDOT flexible base and screenings prior to their incorporation into the structures. I would also recommend scheduling a meeting with the wall contractor prior to construction. If you have any questions, please call at your earliest convenience. Sincerely, Office Phone: 972-304-3685 ' Fax: 972-304-3570 CC~ Suzan Taylor, CIP Coordinator 255 PARK WAY ~ pO BOX 9478 ~ COPPELL TX 7S0~9 ~ TEL 972/462 0022 ~ FAX 972/304 3673