Loading...
ST9302-LR 990916ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL COPPELL, TEXAS DATE 9/16/99 PROJECT SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS OUR REPORT NO. 98881-70 TEST DATA: TEST ~ ELEV. SOIL ID OPT1MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,.~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 190 9/16/99 FG 6 12.5 111.2 16.5 107 96 l-AD 191 9/16/99 FG-7.0 6 12.5 111.2 13.7 106 95 I-A 192 9/16/99 FG-6.0 6 12.5 111.2 12.8 107 97 1 -A 193 9/16/99 FG-5.0 6 12.5 111.2 13.7 107 96 1-A 194 9/16/99 FG-4.0 6 12.5 111.2 13.0 107 96 1-A 195 9/16/99 FG-4.0 6 12.5 111.2 14.2 106' 95 1-A 196 9/16/99 FG-3.0 6 12.5 111.2 13.1 106 95 1-A TEST LOCATION: 190 RETEST OF TEST #187 PERFORMED ON 9/15/99 191 RETAINING WALL AT STATION #37+50, 3' SOUTH OF WALL 192 RETAINING WALL AT STATION *L37+53, 3' SOUTH OF WALL 193 RETAINING WALL AT STATION #37+55, 4' SOUTH OF WALL 194 RETAINING WALL AT STATION #37+57, 2' SOUTH OF WALL 195 RETAINING WALL AT STATION #38+50, 4' SOUTH OF WALL 196 RETAINING WALL AT STATION #38+50, 2' SOUTH OF WALL 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4, CEMENT TREATED * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RE'FEST Respectfully Subm. itted /"' ~ . ./5"--/./' . ~ ALPHA TESTING, IN~.~ Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting '1" I 1' T' "IT REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR CITY OF COPPELL DATE 9/16/99 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-70A PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 197 9/16/99 FG-5.0 6 12.5 111.2 13.5 107 96 1 -A 198 9/16/99 FG-4.0 6 12.5 111.2 12.5 109 98 1-A 199 9/16/99 FG-3.0 6 12.5 111.2 13.4 106 95 1-A 200 9/16/99 FG-2.0 6 12.5 111.2 14.4 107 96 1-A 201 9/16/99 FG 6 12.5 111.2 11.7 107 96 I-A TEST LOCATION: 197 RETAINING WALL AT STATION #38+75, 2' SOUTH OF WALL 198 RETAINING WALL AT STATION #38+75, 3' SOUTH OF WALL 199 RETAINING WALL AT STATION #38+75, 4' SOUTH OF WALL 200 RETAINING WALL AT STATION #38+75, 5' SOUTH OF WALL 201 ELECTRIC LINE BY TXU ON NORTH SIDE AT STATION #9+50 1. FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ,/ , ' ~' ':' "'-~'---' Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting