Loading...
ST9302-LR 990816ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX; 972/406-8023 TESTED FOR: CITY OF COPPELL COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: 08/16/99 PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 OUR REPORT NO.: COPPELL, TEXAS 98881-57 LOCATION OF CONCRETE PLACEMENT FIELD DATA DRILL SHAFTS: STATION 36+75 SANDY LAKE ROAD DATE PLACED TIME SLUMP (ASTM C-143) AIR CONTENT (ASTM C-231 [] OR C-173 []) AIR TEMPERATURE CONCRETE TEMPERATURE DATE RECEIVED FIELD DATA SUBMITTED BY 08116/99 PLANT N/A N/A DEUVER TICKET NO. N/A NIA MD( Pm3eO~Tme~ {sso) N/A CEMENT N/A NIA WATER N/A N/A FWE AGGREGATE N/A 08/17199 COARSE ACGREC. ATE NIA CONTRACTOR ADMIXTURE N/A MIX DATA SUBMITTED BY N/A ~' SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617[~'/OR C-1231 [] COMPRESSION TEST RESULTS [NOMINAL CYLINDER SIZE r x 12") (ASTM' C.39) LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE NO. CURING TESTED DAYS LOAD STRENGTH, PSI 45 LAB 08123/99 7 107,291 28.27 3,800 45 LAB 09/13/99 28 125,860 28.27 4,450 47 LAB 09113199 28 128,051 28.27 4,530 48 LAB HOLD H 28.27 specmcaeons 28 4,O0O REMARKS: representative. ~n'nde~ made by Amhilec~s [] Cylinders picked up by ALPHA [] C~inders del~ered to ALPHA ~pression test results comply with applicable specif'matio~s. with applicable specifications. Geotechnicol Engineering · Consfruc#on Materials Tesfir~l · Environmentol Engineedng · Consulfir~2 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: CITY OF COPPELL COPPELL, TEXAS PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS DATE: 08/16/99 OUR REPORT NO: 98881-56 TECHNICIAN: D.H. WEATHER: CLEAR TEMPERATURE RANGE: 95 TO 100 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 1 SET OF 4 CONTRACTOR MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: DRILLED SHAFTS AT STATION #36+75 SANDY LAKE ROAD THE CYLINERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. ALPHA TESTING, INK v ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: CiTY OF COPPELL COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE: 08/16/99 PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 OUR REPORT NO.: COPPELL, TEXAS 98881-57 LOCATION OF CONCRETE PLACEMENT FIELD DATA DRILL SHAFTS: STATION 36+75 SANDY LAKE ROAD DATE PLACED 08/16/99 TIME N/A SLUMP (ASTM C-143) N/A /MR CONTENT (ASTM C-2~1 [] OR C.173 n) N/A ~R TEMPERATURE N/A CONCRETE TEMPERATURE N/A DATE RECEIVED 08/17/99 FIELD DATA SUBMITTEO BY CONTRACT. OR SuBMrFrED BY NIA ~ MIX DATA SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C417 U~ OR C-123t [] PLANT N/A DELIVER TICKET NO. MIX PROPORTIONS (SSD) CEMENT NIA WATER N/A FINE AGGREGATE N/A COAR~ AGOREGATE N/A ADMIXTURE NIA COMPRESSION TEST RESULTS (NOMIN.ad. CYL.II,~:)ER SIZE S" X t2') (A~TM C-39) LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE NO. CURING TESTED DAYS LOAD STRENGTH, PSI 45 LAB 08/23199 7 107,291 28.27 3,800 46 LAB 09/13/99 28 28.27 47 LAB 09113/99 28 28.27 48 LAB HOLD H 28.27 S~aecmcsUons 28 4,000 REMARKS: irepresentative. riders made by Amhitecl's [] Cl/linders delivered to ALPHA I-1 Compression test results comply with ~] Comixession test results ~o not com~ with applioable speoi~'K~lions. , INC. Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting '1'[ -I I 11I ':