Loading...
ST9703-CS050816coFs?E-LL August 16, 2005 Marry Murphy, Business Manager JRJ Paving L.P. 2277 Masch Branch Road Denton, TX 76207 MacArthur Boulevard Widening (from Bethel School Rd. to Belt Line Rd.) Project # ST 97-03 Dear Mr. Murphy: The City of Coppell has taken note of the effort your company has made to complete the paving of the lane added to MacArthur Blvd. and to reopen the lanes by August 12t~. In order to complete the project, the medians must be restored including restoration of the irrigation service and sod. The project specifications call for the submittal of plans for the irrigation restoration prepared by a Licensed Irrigator prior to implementing any repairs or reconstruction. As of the date of this letter, no such plans have been submitted. According to the time bid by your firm and the date of the notice to proceed, the calendar days on the project will expire on August 19, 2005. While it is not our desire to penalize JRJ for not meeting the completion date, if we do not observe work progressing in a diligent manner to complete the above noted work, we will begin assessing liquidated damages under the terms of the contract after August 19, 2005. If you have any questions or need any additional information, please feel free to contact me. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office: 972/304-7044 Fax: 972/304-3570 kmarvin~ ci.coppe]l.tx.us CC; ~enneth M. Griffin, P.E., Director of Engineering & Public Works Rick O'Dell, Construction Inspector 255 PARKWAY ~l~ p.O BOX 9478 ~ COPPELL TX 75019 ~r TEL 972/462 0022 ~ fAX 972/304 3673 MESSAGE CONF I RMAT I ON 08/17/2005 10:09 ID--CITY OF COPPELL ENGR. DEPT. DATE 08/17 TIME 10:08 S~R-TIME 00~26" DISTANT STATION ID MODE PAGES RESULT 9403206546 CALLING 01 OK 0000