Loading...
Vista Point II L5-CS050816SCHNITZ & SEWELL *ARCHITECTURE*PLANNING*DESIGN* 16 August, 2005 Ms. Chadene L.a Mattina E.I.T. Engineering Department THE CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: Lot 5, Block A Vista Point II/MacArthur Ridge Bank of Texas Dear Ms. La Mattina: Please find the following items enclosed: /"One {1) set final city red lines ¢' Twenty (20) final copies for City Engineer's Stamp v/Transmittal of Development Permit Application and Inspection Fee Calculation Sheet to the general contractor As we pointed out in our last transmittal, the prOject bids today and we expect to have a breakdown accurate enough to calculate inspection fees from by eady next week. I have forwarded all application matedal directly to the general contractor, for fees and permits are m his contract scope. Thank you for all of your help. Sincerely, ENCL. cc: Mr. Nell Brennan, V.P, Bank of Texas 333W, Campbell Road, Suite 355 Richatda~. Te~a~ 'FoO~ Tel: 972.437.9644 Facsimile: 972.907.9975 w~nv.achnitzandaewell corn 16 August,~2005 McK~ney, Dear have the ~ the encl. Ba~k ( wjet~cl. file: o4o7.t