Vista Point II L5-CS050816SCHNITZ & SEWELL
*ARCHITECTURE*PLANNING*DESIGN*
16 August, 2005
Ms. Chadene L.a Mattina E.I.T.
Engineering Department
THE CITY OF COPPELL
255 Parkway Boulevard
Coppell, Texas 75019
Re:
Lot 5, Block A Vista Point II/MacArthur Ridge
Bank of Texas
Dear Ms. La Mattina:
Please find the following items enclosed:
/"One {1) set final city red lines
¢' Twenty (20) final copies for City Engineer's Stamp
v/Transmittal of Development Permit Application and Inspection Fee Calculation Sheet
to the general contractor
As we pointed out in our last transmittal, the prOject bids today and we expect to have a
breakdown accurate enough to calculate inspection fees from by eady next week. I have
forwarded all application matedal directly to the general contractor, for fees and permits are m
his contract scope.
Thank you for all of your help.
Sincerely,
ENCL.
cc: Mr. Nell Brennan, V.P,
Bank of Texas
333W, Campbell Road, Suite 355
Richatda~. Te~a~ 'FoO~
Tel: 972.437.9644 Facsimile: 972.907.9975
w~nv.achnitzandaewell corn
16 August,~2005
McK~ney,
Dear
have
the ~
the
encl.
Ba~k (
wjet~cl.
file: o4o7.t