Loading...
Freeport NIP(8.1)-CS050804DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-186R7-LI, Duke-Freeport, zoning change request from PD-186R2-LI (Planned Development-186 Revision 2-Light Industrial) to PD-186R7-LI (Planned Development-186 Revision 7-Light Industrial), to attach a Detail Site Plan to Lots 2R1 and 2R2, Block A, to allow the construction of a 142,247- square-foot building on Lot 2R1 and a 93,345-square-foot building on Lot 2R2, totaling approximately 15.51 acres of property located along the north side of Bethel Road, west of Freeport Parkway, at the request of Brian Straley, Duke Realty Corporation. .STAFF REP.: Gary Sieb PROJECT ID# PD-05-0031 DRC DA TE: July 28, 2005 andAugust 4, 2005 CONTACT: Kenneth M. Gri~n, P.E., Dir. o[ En~ineerin~/Public Works 972/304-3686 COMMENT STATUS: ~ ,/'FINAL RE-iztggO 1. The cost of construction of the 8' sidewalk should be placed in escrow with the City and will be used to construct the Hike & Bike trail. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke-Freeport Addition, Lots 2R1 and 2R2~ Block A~ Replat, being a replat of the remaining portion of the original Lot 2, Block A, to allow the construction of a 142,247-square-foot building on Lot 2R1 and a 93,345- square-foot building on Lot 2R2, totaling approximately 15.51 acres of property located along the north side of Bethel Road, west of Freeport Parkway, at the request of Brian Straley Duke Realty Corporation. STAFF REP.: Gary Sieb PROJECT ID# RP-05-0032 DRC DA TE: July 28, 2005 and August 4, 2005 CONTACT: Kenneth M. Gr{ffn, P.E., Dir. o~ En~ineerin~/Public Works 972/304-3686 COMMENT STATUS: PRELIP, IINA~Y ,/'FINAL ~ Comments will be generated upon detailed engineering review.