Loading...
Park West CC(02-2)-LR050816REPORT OF W~ECTION OBSERVATION · ~,~st Commerce Center ~ Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 12 REPORT DATE: 08-16-05 REG PROJECT NO. 12468 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (fi) (psi) (in) 10 5 100-200 12-18 Number of Equipment Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) (ft) 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) I P~sN°' Ij 08-01-05 Building A 42,000 150 08-02-05 Building A 30,000 150 Building A 30,000 150 Surfactant added at regular inter;als: Yes Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING,.~ Original Signed By 1~1 Keith E. Atkins Manager, CMT AE/rs~ LTD. 2424 STUTZ DR ,, SUITE 400 - DALLAS, TX 75235 ,* T~L [214] 350 5600 '* F^X [214] 3500019