Loading...
ST9905-CS050818I Suzan Taylor - Early Storm Drain Installation plans From: To: Date: Subject: <ccbond@transystems.com> <staylor@ci.coppell.tx.us> 8/18/2005 8:08:59 PM Early Storm Drain Installation plans Suzan, Attached are the box culvert/channel sheets and the water main relocation sheet for the Early Storm Drain Installation plans. I think these drawings are in pretty good shape. I still need to prepare the cover sheet, detail sheet (including some general notes) and add the TXDOT box culvert and headwall detail sheets. I'll pull the quantities together tomorrow and try and pull together the remaining sheets as well. By Monday/Tuesday of next week the Early Storm Drain Installation plans should be done. Please look over the attached sheets and I'll talk to you Friday. Thanks. Craig Page 1 ! Craig Bond, P.E. TranSystems Corporation Consultants 3010 LBJ Freeway, Suite 990 Dallas, Texas 75234 Ph 972-280-9300 x 225 Fax 972-280-9715 Cell 817-296-8536 ccbond@transystems.com