Attached are the box culvert/channel sheets and the water main
relocation sheet for the Early Storm Drain Installation plans. I think
these drawings are in pretty good shape. I still need to prepare the
cover sheet, detail sheet (including some general notes) and add the
TXDOT box culvert and headwall detail sheets. I'll pull the quantities
together tomorrow and try and pull together the remaining sheets as
well. By Monday/Tuesday of next week the Early Storm Drain Installation
plans should be done. Please look over the attached sheets and I'll talk
to you Friday. Thanks.
Craig
Page 1 !
Craig Bond, P.E.
TranSystems Corporation Consultants
3010 LBJ Freeway, Suite 990
Dallas, Texas 75234
Ph 972-280-9300 x 225
Fax 972-280-9715
Cell 817-296-8536
ccbond@transystems.com