Park West CC(11)-CS050822 (2) T H £ C I T Y 0 F COPPEIJL August 22, 2005 Mr. David Littleton, P.E. Halff Associates, Inc. 8616 Northwst Plaza Drive Dallas, TX 75225 RE: Park West Commerce Center (HCA Laundry) Fee Assessment Letter Dear Mr. Littleton, Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Water and Wastewater Impact Fees are to be paid by separate check upon issuance of the Building Permit at the Building Inspections Department located in the Fire Administration Building, 500 Southwestern Boulevard. The fees for water and sewer taps, water meters, and utility inspection fees are to be paid by separate check at the ne;v Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drain, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in public right-of-way, the City of Coppell charges a 4% fee. A check for Inspection Fees should be submitted to this office along with a copy of the Engineer's estimate or contract(s) with the appropriate 2% and 4% calculations shown for verification purposes. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Charlene La Mattina~'E.I.T. Graduate Engineer CCl Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE WORKSHEET PROJECT: Park West Commerce Center (HCA Laundry) DATE: 8/19/2005 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 3 inch : 16 ESU's 0 = 0 ESU's 0 = 0 ESU's 0 : 0 ESU's Total #: 16 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $1,091.90 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $4,480.00 $50.00 $1,091.90 $0.00 $0.00 $0.00 $30.00 $0.00 $4,450.00 $50.00 $50.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: Single-family @ SQ00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $0.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T,U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 DEVELOPMENT FEE TABLE Project: Park West Commerce Center (HCA Laundry) Date: 8/19/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $4,480.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,091.90 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,480.00 (l 00% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II tOTAL $10,231.90 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Park West Commerce Center (HCA Laundry) 8/19/2005 ROADWAY IMPACT FEE: ;ervice Area * 0 Category ** 0 Land Use ** 0 Data Not Available 0 Development Units ** 0.00 Vehicle Miles per Development Unit ** 0 Fee per Vehicle Mile *** $300 Roadway Impact Fee due - (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $0.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)