Loading...
Park West CC(02-2)-LR050817REPORT OF WATER INJECTION OBSERVATION Park West Commerce Center Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 16 REPORT DATE: 08-17-05 REG PROJECT NO. 12468 TECHNICIAN: M. Wood & G. Tsougarakis PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (ft) (psi) (in) 10 2.5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Ri~s (ia) (ft) (ft) 3 4 12 5 Date I Area Injected (sq fi) I Average Pressure (psi) I Pass No. 08-05-05 36,000 150 1 27,000 150 3 Surfactant added at regular intervals: Yes Mail Submitted by: Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret REED ENGINEERING GROUP, LTD. (1) Commerce ~' ~ ~, Mr. Rick WylYnstructi°n ~°riginal Signed By Co Co., LP/ ~', t~.,/' (1) City of Coppell/Mr. Larry Davis ~,~. (1) City of Coppell/Mr. Lee Stone ~r,A~. L/ (1) Northvv~estern Investment Mgmt./ -- Mr..,~est Willmore ~(1) ,~wart Consulting Associates/ e "~U ,~r. Mike Smith 2424STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 3505(500 · FAX [21413500010 REPORT OF WATER INJECTION OBSERVATION Park West Commerce Center Beltline Road and Airline Road Coppell, Texas REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 17 REPORT DATE: 08-17-05 REG PROJECT NO. 12468 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (fl) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Ri~ls (ea) (fi) (ft) 3 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) 08-06-05 Bldg A 5,300 150 Bldg B 9,000 150 08-08-05 Bldg A 23,000 150 Bldg B 9,000 150 08-09-05 BIdg A 21,900 150 Bldg B 21,000 150 Pass No, 1 1 2 1 2 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL [21413505600 · FAX [2141350 0019