Park West CC(02-2)-LR050817REPORT OF WATER INJECTION OBSERVATION
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 16
REPORT DATE: 08-17-05
REG PROJECT NO. 12468
TECHNICIAN: M. Wood &
G. Tsougarakis
PAGE: 1 of 1
On this date a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft) (ft) (psi) (in)
10 2.5 100-200 12-18
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Ri~s (ia) (ft) (ft)
3 4 12 5
Date I Area Injected (sq fi) I Average Pressure (psi) I Pass No.
08-05-05 36,000 150 1
27,000 150 3
Surfactant added at regular intervals: Yes
Mail Submitted by:
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret REED ENGINEERING GROUP, LTD.
(1) Commerce
~' ~ ~, Mr. Rick WylYnstructi°n ~°riginal Signed By
Co
Co.,
LP/
~', t~.,/' (1) City of Coppell/Mr. Larry Davis ~,~.
(1) City of Coppell/Mr. Lee Stone ~r,A~.
L/ (1) Northvv~estern Investment Mgmt./
-- Mr..,~est Willmore
~(1) ,~wart Consulting Associates/
e "~U ,~r. Mike Smith
2424STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 3505(500 · FAX [21413500010
REPORT OF WATER INJECTION OBSERVATION
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 17
REPORT DATE: 08-17-05
REG PROJECT NO. 12468
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft) (fl) (psi) (in)
10 5 100-200 12-18
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Ri~ls (ea) (fi) (ft)
3 4 11.5 5
Date I Area Injected (sq ft) I Average Pressure (psi)
08-06-05 Bldg A 5,300 150
Bldg B 9,000 150
08-08-05 Bldg A 23,000 150
Bldg B 9,000 150
08-09-05 BIdg A 21,900 150
Bldg B 21,000 150
Pass No,
1
1
2
1
2
2
Surfactant added at regular intervals: Yes
Mail
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL [21413505600 · FAX [2141350 0019