Loading...
ST9902-CS050826T H ~r C I T Y O F COFPELL P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX COVER SHEET To: Ali Malekouti From: Suzan Taylor Fa= 214-653-6416 Date: August 26, 2005 pmj~t No: ST 99-02A pa.es: 2 (including cover sheet) Re: Letter cc: [] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested .Comments: Ali Attached is a copy of the letter requesting the county to move all or a portion of the money for construction of Phase "A". We are going to advertise this phase sometime in September 2005 - the plans and specifications are 99% complete. We have to take into consideration the time it will take for the utilities to complete their relocations. Several of the utilities have indicated that it will take until the end of November. Thanks for your help. Suzan Taylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stavlor~.ci.coppell.tx, us IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Coppell Engineering- Excellence By Design" COFFELL February 5,2003 Mr. Donald R. Holzwarth, P.E. Director of Public Works / Dallas County Public Works 411 Elm Street, 4th floor Dallas, Texas 75202 Sandy Lake Road / ST 99-02 A&B Major Capital Improvement Program Dear Mr. Holzwarth: In October 2000, the Sandy Lake Road (Denton Tap to SH 121) widening project was approved for cost participation funding tkrough the Major Capital Development Fund. County funds in the amount of $1,300,000 are available to the City in Program Year 2006. The funds are dedicated solely to the construction of the roadway improvements. The west section of Sandy Lake Road, from SH 121 to north Coppell Road, is mostly developed with commercial/industrial facilities and there are no issues that adversely affect the construction of that section of roadway. The east section of roadway, from north Coppell Road to Denton Tap, is almost completely developed with residential subdivisions. There are numerous issues that affect the construction, including tree removal, right-of-way acquisition, existing irrigation and landscaping, and the relocation of four of the smaller Oncor electric transmission lines. The City's design consultant, Teague Nail and Perkins, Inc., was instructed to prepare the construction plans in two sections. Section "A" begins at SH 121 and ends at Freeport Parkway and Section "B" begins at Freeport Parkway and ends at Denton Tap. This will allow the City to start construction of Section "A" at an earlier date. This section of Sandy Lake Road provides commercial traffic access to the commercial/industrial facilities located along Royal Lane, Sandy Lake, and Freeport Parkway. Construction of Section "A" is scheduled to start in June 2004 and has an estimated construction cost of $3,250,000. Construction of Section "B" is scheduled to start in June 2007 and has an estimated construction cost of $4,000,000. Plans are currently in the schematic design phase. The City has met with David McSwain several times regarding this project and he is aware that we intend to construct the project in two sections. The project scope items for both sections of the roadway have been submitted to him. Since the Sandy Lake Road project was submitted to the County as one project, we are requesting consideration of the County moving all or a portion of the $1,300,000 forward for the City's use on the construction of Section "A". We are available to discuss any options for the funding at your convenience. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, CIP Qo~rdinator