Vista Ridge 1R-8 D-LR050831CLIENT: JBP, LP
SAM ENGINEERING & TESTING, NC.
1~ Serving The Geo-lndustry Since 1974 ,~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
IN-PLACE DENSITY OF SOIL
REPORT DATE: 8/31/05
TEST DATE:
8/30/05
PROJECT: The Plaza Infrastrj~re
Highway 121~idgemont
Lewisville & Coppell, TX
5301 Village Creek Drive, Suite A
Piano, TX 75093
PROJECT #: 308TXlK5
TEST METHOD:ASTMD-2292 & 3017
*ASTM D698A - See Proctor Report for Details
Minimum Required Compaction = 95%
REPORT#: 18 PAGE 1 OF 1
ATTN: Neal Heckel SE&T TECHNICIAN:
E, B. Deceleral 10-14
E. B. Deceleration Lan~ 10-14
E. B. Deceleration 10-14
All densities meet the minimum required values unless otherwise noted. It has been a pleasure to serve you on this
project and we trust that this report is satisfactory.
r~ Lane - Highland, West. Final .5 109 12 1 115 10
~ Lane - Hi~lhland, Center Final .5 111 13 1 115 10
q Lane - Highland, East Final .5 110 14 1 115 10
Very Truly Yours,
SAM Engineering & Testing, L.P.
Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893